Reconfigure Locker Room Hangar at AIRSTA Traverse City, Traverse City, MI PSN 10578118
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The contract entails a comprehensive reconfiguration of the locker room hangar at AIRSTA Traverse City in Michigan to better accommodate male and female personnel by creating dedicated, separate restroom facilities for each gender. The existing battery storage room will be repurposed into a general storage space, while a new designated area for hanging wet personal protective equipment will be established with integrated dehumidification to manage moisture. All peeling paint on the existing ductwork within the renovation zone will be removed, and the current HVAC system will be modified to support the updated layout and increased operational demands. New plumbing fixtures will be connected to the site’s existing domestic water and sanitary lines, ensuring compliance with infrastructure standards. The project includes replacing the existing lighting with modern luminaires to match the new room configuration, installing additional convenience electrical receptacles, and reconfiguring the fire alarm and public address systems to align with the redesigned space. A significant component of the work involves replacing six electrical panels and associated transformers to enhance system reliability and capacity. All work must be performed in accordance with safety and functionality requirements, with the United States Coast Guard as the overseeing agency under the Department of Homeland Security, and Robert Spangler designated as the primary point of contact for all project inquiries and coordination.
General Info
Place of Performance
Traverse City, MI, USASet-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Organization & Contact Information
Full Description
Reconfigure the space to accommodate male and female personnel. The renovated locker room shall include a small restroom for men and a small restroom for women. The existing battery storage room shall be reconfigured as a storage room. The renovated space shall have a separate area to hang wet PPE and dehumidification shall be provided for this area. Peeling paint shall be removed from the existing ductwork within the renovated area. The existing HVAC system shall be reconfigured to accommodate the new space. The new plumbing fixtures shall be connected to the existing domestic hot and cold water and sanitary mains. The existing lighting shall be replaced with new luminaires to accommodate the new layout of the space. New convenience receptacles shall be provided. The existing fire alarm system and PA system speakers shall be reconfigured to accommodate the new layout of the space. Replacement of 6 electrical panels and transformers shall be included in scope of work.
Similar Contracts
Same NAICS industry code
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
