Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on June 3, 2011. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Reconstruction of Drainage Channel

Awarded
FA3047-11-B-0005Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
International
2383 Emerson Street - Modular Pump Track - Design-Build Services
Solicitation # RFP 1220-2026-4364
The City of Abbotsford has issued Request for Proposals RFP 1220-2026-4364 for design-build services to create a complete, safe, durable, and fully operational modular pump track facility at 2383 Emerson Street. The project follows a stipulated price contract based on the CCDC 14-2013 Design-Build Agreement. The selected Design-Builder will be responsible for all professional design and engineering services, including the preparation of sealed plans, as well as the provision of all labor, materials, modular pump track units, and site furnishings. Additionally, the contractor must obtain all necessary permits, licenses, and certificates of inspection required by federal, provincial, and local authorities. A mandatory site visit is scheduled for November 9, 2026, at 10:00 AM local time, and attendance is required for proposal submission. The deadline for responses is November 24, 2026, at 10:00 PM. Project acceptance is contingent upon the Consultant and Owner's satisfaction regarding the rectification of deficient work, completion of landscaping and clean-up, and the facility reaching full operational readiness. Payments will be processed via progress payment approvals issued by the City Representative. All work must adhere to the rules and customs of best trade practice and meet the requirements of all governing jurisdictions.
City of Abbotsford

POSTED

1 day ago

DEADLINE

in 24 days

AI Contract Overview

Show more

The Air Education and Training Command, through the 802d Contracting Squadron at Lackland Air Force Base, Texas, issued a design-build contract for the reconstruction of a drainage channel. The project scope involves the reconstruction of the channel from the end of the existing riprap at Kenly Street to a point 375 feet downstream. Key technical requirements include the construction of a stilling basin and a retaining wall, reshaping of the channel bottom and side slopes, reinforcement using permanent turf reinforcement mats and an armor flex system, and the restraining and re-bedding of an existing recycled water main. The project was set aside for HUBzone firms under NAICS code 237990, with an estimated magnitude between 250,000 and 500,000 dollars. The total period of performance was established at 145 calendar days, divided into 65 percent design, 95 percent design, and construction phases. The contract, identified as FA3047-11-B-0005 and later associated with award FA3047-11-C-0015, was awarded to Special Contracting, LLC for a total amount of 339,007.59 dollars.

General Info

Contract Value

$339,007.59

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

The intersection of Kenly and Truemper Streets on Lackland AFB., Lackland AFB, TX, 78236, USA

Set-Aside

NONE

Award Issued Date

Documents

4
PDF, High priority: read this firstaward
High
PDF, High priority: read this firstsow
High
PDF, High priority: read this firstwage-determination
High
PDF, Low priorityother
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

9 updates
PhaseAwarded
Posted

Presolicitation

Type Changed

Presolicitation → Combined Synopsis

Notice updated

The notice description changed. The point of contact changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA3016 502 Cons Cl
Contacts2 people available
OfficeJBSA LACKLAND, TX, 78236-5286, USA
Office AddressJBSA LACKLAND, TX, 78236-5286, USA
Contacts
Forrest N BradleyContract Administrator
Scott ThomasContract Specialist

Full Description

Show more
Agency/Office: Air Education and Training Command Location: Lackland AFB - 802d Contracting Squadron Title: Clearing Drainage Channel NAICS: 237990 Any prospective bidder desiring an explanation or interpretation of the solicitation or associated documents must request in writing no later than ten (10) days prior to closing date. Site Visit: 20 Apr 11, 9:00am CST. If you require access to the installation, please request access by e-mailing the following addresses: contact@example.gov or contact@example.gov. Follow up with a call to the number listed below on the day prior to the scheduled site visit to ensure Base access. Please arrive at least one hours prior to the schedule site visit at the Airman' Gate Visit's Center located at Valley High off of Loop 410, in order to ensure access in timely manner. Meet at 802 CONS, 1655 Selfridge Ave. Bldg. 5450, Lackland AFB, TX 78236 before we go out to the proposed job site. The project will be set aside for HUBzone Please submit pass requests in the following format: Name: Last name, First DOB: D/L # (With state): Time: 0830-1100 Date: 4/20/2011 Contract #: FA3047-11-B-0005 Please submit to both SrA Forrest Bradley or A1C Scott Thomas. Description: Synopsis: Title: Reconstruction of Drainage Channel Project #: MPYJ 10-0178, Storm drainage repairs, VOQ B2449 Project Magnitude: Between $250,000 and $500,000. Period of Performance: 65% Design - 21 days after NTP 95% Design - 22 days after NTP Construction - 102 days after NTP, Total POP - 145 days. (All days noted here represent calendar days). Note: The solicitation with the official specifications and drawings will be available on the World Wide Web on or about 8 April 2011 at http://www.fbo.gov. Project Scope: Design/Build Description of Work: Design/Build for the reconstruction of the drainage channel from the end of the existing riprap at Kenly Street to a point 375 feet downstream within the existing tree line. The project consists of the construction of a stilling basin, a retaining wall, reshaping of the channel bottom and side slopes, reinforcement of the channel bottom and north slope (via permanent turf reinforcement mats and an armor flex system) and the restraining and re-bedding of an existing recycled water main. **Just a reminder that this bid will close TOMORROW (20 May 2011) at 3:00 pm central standard time. Please have your bids in by then.**

More opportunities from Department Of Defense → FA3016 502 Cons Cl

Same awarding agency

NAICS: 532490
New
Federal
50 - TON AC SMART RENTAL FOR BUILDING 1062 JOINT BASE SAN ANTONIO (JBSA) FORT SAM HOUSTON (FSH), TX
Solicitation # FA301627Q0010
Solicitation FA301627Q0010 is a small business set-aside Request for Quote for the commercial rental, installation, and support of a 50-Ton Smart Air Conditioning unit and a 150 kVA electrical transformer to provide critical cooling for DISA infrastructure in Building 1062 at JBSA Fort Sam Houston, Texas. The requirement includes the provision of associated electrical power cabling, flexible ductwork, and a temperature control system capable of maintaining indoor ambient temperatures between 70°F and 80°F continuously. The primary period of performance runs from December 9, 2026, to November 8, 2027, with two optional five-month extensions available through April 8, 2028. The contract will be awarded to the responsible contractor providing the lowest evaluated price among technically acceptable quotes. Technical acceptability is based on the submission of manufacturer data sheets for UL-Listed equipment and a milestone schedule demonstrating the ability to be fully operational by December 9, 2026. All proposals must be submitted electronically via the PIEE Solicitation Module. The contractor is responsible for adhering to strict base access security protocols, NFPA 70 electrical standards, and site maintenance requirements. Invoicing and payment will be processed through Wide Area Workflow (WAWF) with Net 30 payment terms.
Other Commercial and Industrial Machinery and Equipment Rental and Leasing

POSTED

2 days ago

DEADLINE

in 10 days
View Details
NAICS: 238210
New
Federal
DCF3 PROJECTION SYSTEM
Solicitation # A070977
The Department of Defense, specifically the 502 Cons Cl at JBSA-Lackland, Texas, is conducting market research via a sources-sought Request for Information (RFI) for the DCF3 Projection System. The project involves providing all personnel, equipment, and installation services to implement standalone audio-visual classroom systems in sixteen classrooms at the Basic Military Training Dining Classroom Facility 3. The scope of work includes the installation of laser projectors, zoom lenses, lecterns, audio systems with flat speakers and gooseneck microphones, and all necessary cabling. A critical requirement is the integration of government-furnished Apple equipment and docking stations, ensuring the final system remains a standalone solution that does not interface with the Air Force network. All provided equipment must be Trade Agreement Act (TAA) compliant and UL 1480 listed for safety. The contractor will be responsible for electrical installation, functional testing of audio and video resolution, and providing user training and operational documentation. Performance is expected during normal duty hours, with a proposed completion timeline of 90 days after award. Due to the location at JBSA-Lackland, all personnel must undergo background investigations and criminal history checks to obtain base access. Interested respondents must submit their capabilities, business size, and open-market pricing to Tommie Low by November 4, 2026, at 12 p.m. CST.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

2 days ago

DEADLINE

in 4 days
View Details
NAICS: 337214
New
Federal
Cubicle Installation
Solicitation # FA301627Q0011
The Department of Defense, specifically the 502nd Contracting Squadron, is conducting market research through a Request for Information (RFI) to identify qualified small business offerors for the installation of cubicle furniture at JBSA Randolph Building 399. This sources-sought effort is designated as a Total Small Business Set Aside, utilizing NAICS code 337214 and PSC 7110. The scope of work requires the contractor to provide all materials, labor, management, and tools necessary for the installation, leveraging existing LAN infrastructure where possible. The project includes a performance extension of 52 days and requires adherence to strict technical standards, including UFC 3-580-01 for telecommunications and electrical installations, UFC 2-600-01 for fire protection, and MIL-HDBK-419 for grounding and shielding. Key deliverables include a comprehensive milestone installation schedule, which serves as a technical evaluation factor, weekly soft-copy progress reports, and as-built engineering drawings. The contractor must coordinate storage and staging with 502 CS/SCXP 30 days prior to installation and conduct a final walk-through 72 hours before close-out. Security requirements include potential DoD Secret Security Clearances for personnel handling network equipment and a formal site visit request process for base access. All on-site testing must follow Original Equipment Manufacturer manuals and vendor procedures, with a formal test plan due 10 days before installation begins. Interested small businesses must submit their company identification and socioeconomic status to Darreus Hiers and Joseph Gyakari by 10:00 A.M. Central Time on October 3, 2026.
Office Furniture (except Wood) Manufacturing

POSTED

3 days ago

DEADLINE

in 3 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS