Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, July 8 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Government of Canada was posted on May 19, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

RECONSTRUCTION OF RUE ST-JEAN PHASE 2B

Closed
BT-2026-016Canada

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
SLED
Call 001 612187-134319The project involves the design-build replacement of Bridge C-13-038 over State Route 116 (Chicopee Street) in District 2, Massachusetts, under procurement by the Massachusetts Department of Transportation (MassDOT). This is a lump sum contract structured as a Best Value Design-Build (BVDB) procurement, where selection is based on the lowest overall value rating—the total price divided by the cumulative technical score. The scope encompasses full civil, structural, traffic, stormwater, environmental, and utility coordination, including demolition of the existing bridge, new construction, temporary traffic control, public outreach, asbestos inspection and testing, and invasive species management. All unit prices are defined as all-inclusive, covering design, engineering, project management, quality control, equipment, transportation, installation, utilities, insurance, bonds, and warranty. The contract requires submission of both a technical proposal capped at 40 pages and a separate price proposal via the Bid Express platform, with a mandatory 5% bid bond. The technical evaluation is weighted 65% toward the design-build technical approach and 35% toward project management and coordination, with strict pass/fail gates for submission compliance, proper organization, and bid bond submission. The project must be completed within 2,039 calendar days from the anticipated Notice to Proceed date of December 8, 2026, with adjustments allowed if the completion date falls between December 1 and March 15. MassDOT mandates strict adherence to state laws, including MGL Chapter 149A (public construction labor standards), Chapter 268A (conflict of interest), and Chapter 30, §39M1/2 and §151/2 (procurement compliance). The contractor must implement a comprehensive Quality Control System with dedicated full-time managers for design, construction, and fabrication oversight, including independent oversight at fabrication plants beyond the fabricator’s own program. Non-conformance reports must be mitigated through defined procedures. Affirmative Action and Equal Employment Opportunity compliance is required, with firms of 50 or more employees and contracts over $50,000 needing an approved affirmative action plan on file with MassDOT. Disadvantaged Business Enterprise participation must be actively pursued. The contractor is responsible for all bonding, including performance and payment bonds for the full contract amount, and must comply with insurance and risk management standards. All documentation, including escrowed proposal materials, must be certified as complete and used solely
MASSDOT

POSTED

in about 2 months

DEADLINE

in about 2 months

AI Contract Overview

Show more

Phase B of Phase 2 of the Reconstruction of Rue St-Jean project in Clarence-Rockland, Ontario, focuses on constructing two new roundabouts at the intersection of Poupart Road and St-Jean Street, following the completion of Phase A which installed a berm and a 79.5-metre culvert. The work involves importing and placing over 13,000 cubic meters of fill material for grading and road base development, along with installing sanitary sewers, storm sewers, watermain infrastructure, and streetlights. The existing 276-metre watermain will be abandoned, and comprehensive landscaping will be completed including topsoil, sod, and hydroseed for restored areas and roundabout centre islands. Traffic must remain open on the west and south legs of the intersection throughout construction, while St-Jean Street will be fully closed between Docteur Corbeil Boulevard and Poupart Road, requiring contractors to carefully stage all activities to maintain access. The solicitation, titled RECONSTRUCTION OF RUE ST-JEAN PHASE 2B, was posted on May 19, 2026, with a response deadline of June 3, 2026, under NAICS code 237310, issued by the City of Clarence-Rockland through the Government of Canada’s procurement system, with Yves Rousselle listed as the contracting authority.

General Info

Phase B infrastructure project in Clarence-Rockland includes roundabouts, earthworks, utilities, and traffic management.

Agency

Government of Canada → City Of Clarence-RocklandView Agency

NAICS

237310 - Highway, Street, and Bridge Construction View NAICS

Place of Performance

CAN

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → City Of Clarence-Rockland
Contacts1 person available
OfficeN/A
Organization / Agency
Government of Canada → City Of Clarence-Rockland
View Agency Profile
Office AddressN/A
Contacts
Yves RousselleContracting Authority

Full Description

Show more
This statement outlines the scope and primary deliverables for Phase B of Phase 2 of the ongoing infrastructure improvement project in Clarence-Rockland, Ontario. Phase A, now complete, involved the construction of a berm to facilitate the relocation of existing Hydro One infrastructure, as well as the installation of a 79.5-metre-long culvert measuring 2.4 metres in height by 4.8 metres in width.Phase B will advance the project with the construction of two new roundabouts. The scope of work includes the importation and placement of approximately over 13,000 cubic meters of fill material required for grading and road base development. This phase also includes the installation of sanitary sewers (provisional), storm sewers, watermain infrastructure, and all associated utilities, including streetlight installation. It also includes the abandonment of an existing 276-metre-long watermain and general landscaping, including the landscaping of the roundabout centre islands and restoration of disturbed areas with topsoil, sod, and hydroseed.A key consideration during construction is that the west and south legs of the intersection at Poupart Road and St-Jean Street must remain open to traffic at all times. St-Jean Street will be closed between Docteur Corbeil Boulevard and the intersection with Poupart Road. Contractors will be required to plan and stage all work activities accordingly to maintain the traffic access.