Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

RECOVERY - A-E Services to address deferred maintenance of critical mechanical, electrical, and plumbing systems, repairs of deteriorated building envelope, and incidental repairs.

Active
AG-3K15-D-10-0018Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The U.S. Department of Agriculture’s Agricultural Research Service plans to award a firm fixed price task order to Barlow, Eddy, Jenkins PA under an existing indefinite quantity contract for architectural and engineering services. The task order involves providing bid phase services focused on addressing deferred maintenance of critical mechanical, electrical, and plumbing systems, as well as repairs to deteriorated building envelopes and incidental repairs. A recent modification includes adding soil testing requirements into the project specifications. This contract is funded through the American Recovery and Reinvestment Act of 2009 and was awarded following competitive procedures in accordance with the Brooks Act and FAR Part 36.6, with a total small business set-aside designation under FAR 19.5. The work is to be performed in Stoneville, Mississippi, under solicitation number AG-3K15-D-10-0018 and falls under NAICS code 541330 for architectural and engineering services. The point of contact for this contract is Alfred S Kaufman, a Contract Specialist reachable via email or phone. This task order supports the rehabilitation and maintenance of critical infrastructure components, ensuring the continued functionality and safety of relevant facilities.

General Info

USDA awards fixed-price task order to Barlow for Stoneville engineering services, including soil testing.

Agency

N/A

NAICS

541330 - Engineering Services

Place of Performance

Jamie Whitten Delta States Research Center 141 Experiment Station Road, STONEVILLE, MS, 38776, USA

Set-Aside

SBA

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

special-notice

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyN/A
Contacts1 person available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
Contacts
Alfred S KaufmanContract Specialist

Full Description

Show more
RECOVERY. THIS NOTICE IS PROVIDED FOR INFORMATIONAL PURPOSES ONLY. This project is funded through the American Recovery and Reinvestment Act of 2009. The U. S. Department of Agriculture, Agricultural Research Service, intends to award a firm fixed priced task order to Barlow, Eddy, Jenkins PA, under contract AG-3K15-C-06-0001 for architectural and engineering (A-E) services. The task order is to provide bid phase services. This modification adds soil testing to be included in the specifications. This task order is to be issued under an existing indefinite quantity contract for A-E Services. The contract was competed in accordance with the Brooks Act and FAR 36.6 Architectural and Engineering (A-E) services.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
SLED
2026 AC Water Main Replacement
Solicitation # 2026-RFQ-042
Solicitation 2026-RFQ-042 is a request for qualifications from the City of Mercer Island Public Works department for professional engineering services to design water system upgrades. The project focuses on replacing approximately 5,000 linear feet of aging asbestos cement water mains with ductile iron mains along SE 40th St and E Mercer Way. The scope is divided into two phases: Phase 1 involves water system and PRV vault replacement on SE 40th St from Greenbrier Ln to 97th Ave SE, and Phase 2 extends the replacement to 97th Ave SE and the 3700 and 3800 blocks of East Mercer Way. Additional components for replacement include fire hydrants and water services. The design must comply with the Reduction of Lead in Drinking Water Act and the City of Mercer Island Standard Details Water. The project follows a goal-based timeline with bid-ready plans for Phase 1 due by Q2 2027 and Phase 2 by Q3 2027, with overall construction completion targeted for Q2 2028. Qualified firms must be licensed in the State of Washington and submit a Statement of Qualifications limited to 12 pages, including a proposed timeline and three references from the last five years. Selection is at the sole discretion of the City, and the awarded firm will negotiate a scope and fee schedule using the City's standard professional services agreement. Administration is managed by the City Manager, with payments issued via City warrant within 45 days of receiving a proper monthly invoice.
Public Works

POSTED

about 17 hours ago

DEADLINE

in 14 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS