Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

RECOVERY--C--PROJECT NUMBER 138889, Alabama River Lakes, AL

Active
W91278-10-081-ARRAFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The U.S. Army Corps of Engineers, Mobile District, is issuing a task order under the existing indefinite delivery contract numbered W91278-10-D-0026 held by CDM Thompson, JV, originally awarded in December 2009. This task order focuses on providing architectural and engineering services specifically for the planning and design program within the Mobile District. The current project involves the development of a Restricted Reservoir Operation Plan for the Robert F. Henry Dam to address the mitigation of trunnion rod failures. The plan will update the spillway gate operation schedule and modify the spillway regulation plan to manage out-of-service spillway gates in compliance with the Alabama-Coosa River Basin Water Control Manual, specifically Appendix G pertaining to the Robert F. Henry Lock and Dam. The contract relates to project number 138889, supporting work on the Alabama River Lakes. It is conducted under NAICS code 541330 and coordinated through the Department of Defense office located in Mobile, Alabama. This task order is a continuation of previously competed and awarded contract efforts and is meant for informational purposes rather than open solicitation, thereby limiting participation to the incumbent contractor under the base contract. The effort aligns with the goals of ensuring facility reliability and proper water management within the designated river basin system.

General Info

Task order for architectural and engineering services updating reservoir operation at Robert F. Henry Dam.

NAICS

541330 - Engineering Services

Place of Performance

AL

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

special-notice

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W074 Endist Mobile
ContactsNo contacts available
OfficeMOBILE, AL, 36602-3630, USA
Office AddressMOBILE, AL, 36602-3630, USA
ContactsNo contact information available

Full Description

Show more
PER FAR 5.7, THIS NOTICE IS PROVIDED FOR INFORMATIONAL PURPOSES ONLY; THERFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO CONTRACTOR UNDER THE CURRENT CONTRACT NUMBER: CDM Thompson, JV, W91278-10-D-0026. The Mobile District, U.S. Army Corps of Engineers is placing a task order against Contract No. W91278-10-D-0026, CDM Thompson, JV, said contract being dated 08 December 2009, which has already been competed and awarded as an Indefinite Delivery Contract for AE Services for to Support the Planning and Design Program for the Mobile District. TASK ORDER PROJECT DESCRIPTION: In support of the Trunion Rod Failure Mitigation effort, the scope of work for this task order is completion of a Restricted Reservoir Operation Plan for Robert F Henry Dam. The Plan will revise the spillway gate operation schedule and spillway regulation plan for out of service spillway gates in accordance with Alabama-Coosa River Basin Water Control Manual, Appendix G, Robert F. Henry Lock and Dam.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
SLED
Road Asset Management
Solicitation # FY27-ENGCP-002-6
The Bulloch County Board of Commissioners is soliciting Statements of Qualifications for project FY27-ENGCP-002-6, focused on Road Asset Management. The selected consultant will be responsible for collecting and analyzing field data, creating a road asset inventory, and developing a Capital Improvement Plan with an outlook extending to FY 35. The scope includes GIS database development, web-based mapping, and the identification of structural hazards and drainage failures to minimize safety risks and legal liability. All prime and sub-consultants must be GDOT Prequalified Contractors as of the submission deadline on November 20, 2026, at 3:00 PM EDT. Proposals are evaluated based on a composite scoring system that weights prime consultant experience and technical approach at 20% each, GIS capabilities at 20%, asset prioritization methodology at 15%, workload capacity at 15%, and past references at 10%. The highest-ranked consultant will be invited to negotiate a contract. Key requirements include a Principal-in-Charge with at least 10 years of industry experience and comprehensive insurance coverage, including professional malpractice and general liability of at least 1 million dollars per occurrence. Submissions are limited to ten pages, excluding mandatory forms and charts, and must include a Non-Collusion Affidavit and Bidder Declaration. Either party may terminate the resulting agreement with 30 days written notice.
Bulloch County Board of Commissioners

POSTED

about 10 hours ago

DEADLINE

in 22 days
View Details
NAICS: 541330
New
International
CoT RFP Event Q30-01-2026-27
Solicitation # Q30-01-2026-27
The City of Tshwane is soliciting a service provider for professional engineering services to support town planning subdivision application processes on city-owned properties. The scope of work is divided into three primary categories: Civil Services Reports, Geotechnical Investigations, and Route Determination Reports. All services must be led by a Professional Engineer registered with the Engineering Council of South Africa and must comply with the Gauteng Transport Infrastructure Act, National Building Regulations SANS 10400, and various SANS and SANRAL standards. The project follows a strict timeline, requiring an inception meeting within one month, draft reports within three months, final reports within five months, and project close-out within six months of appointment. The solicitation, numbered Q30-01-2026-27, closes on November 12, 2026, at 10:00. Awards are based on an 80/20 preferential point system in accordance with the Preferential Procurement Policy Framework Act and 2022 Regulations, with specific goals including points for women-owned, youth-owned, and disability-owned enterprises, as well as local economic participation. Evaluation occurs in four stages, starting with administrative responsiveness and a functionality score of at least 70 out of 100. Successful bidders must enter into a Service Level Agreement, with payment terms set at 30 days following the receipt of an invoice. Required submission documents include company registration, tax clearance or a CSD unique pin, and B-BBEE certification.
City of Tshwane

POSTED

about 13 hours ago

DEADLINE

in 13 days
View Details

More opportunities from Department Of Defense → W074 Endist Mobile

Same awarding agency

NAICS: 236220
New
Federal
Black Warrior, Tombigbee, Alabama, Coosa Rivers Project Management Office
Solicitation # W9127826RA087
Solicitation W9127826RA087 is an unrestricted, two-phase, design-build construction project issued by the U.S. Army Corps of Engineers, Mobile District. The project involves the construction of a multi-level Operations Division office building for the Black Warrior, Tombigbee, Alabama, Coosa Rivers Project Management Office in Tuscaloosa, Alabama. The scope of work encompasses all necessary labor, equipment, and materials for site work, utilities, and environmental remediations, ensuring compliance with Department of War, U.S. Federal, and partner nation codes. The project has an estimated value between 10 million and 25 million dollars, with a strict Construction Cost Limitation of 21 million dollars; any proposal exceeding this limit will be deemed non-responsive. The anticipated completion period is 545 days. The procurement process is divided into two phases, with Phase One focusing on the evaluation of proposals to select a maximum of five firms for Phase Two, where detailed design requirements will be provided. Award will be based on a non-price/price trade-off analysis to determine the best value, prioritizing the design concept, preliminary schedule, and small business participation. Key requirements include a 100 percent performance bond, adherence to EM 385-1-1 safety standards, and the provision of a specialized design-build team including a Design Quality Control Manager. Proposals must be submitted electronically via the Procurement Integrated Enterprise Environment portal in PDF format.
Commercial and Institutional Building Construction

POSTED

about 19 hours ago

DEADLINE

in 7 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS