Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity was posted on September 28, 2009. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

RECOVERY - Ellison Creek Watershed Project

Awarded
AG-4423-S-09-0018Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
International
2383 Emerson Street - Modular Pump Track - Design-Build Services
Solicitation # RFP 1220-2026-4364
The City of Abbotsford has issued Request for Proposals RFP 1220-2026-4364 for design-build services to create a complete, safe, durable, and fully operational modular pump track facility at 2383 Emerson Street. The project follows a stipulated price contract based on the CCDC 14-2013 Design-Build Agreement. The selected Design-Builder will be responsible for all professional design and engineering services, including the preparation of sealed plans, as well as the provision of all labor, materials, modular pump track units, and site furnishings. Additionally, the contractor must obtain all necessary permits, licenses, and certificates of inspection required by federal, provincial, and local authorities. A mandatory site visit is scheduled for November 9, 2026, at 10:00 AM local time, and attendance is required for proposal submission. The deadline for responses is November 24, 2026, at 10:00 PM. Project acceptance is contingent upon the Consultant and Owner's satisfaction regarding the rectification of deficient work, completion of landscaping and clean-up, and the facility reaching full operational readiness. Payments will be processed via progress payment approvals issued by the City Representative. All work must adhere to the rules and customs of best trade practice and meet the requirements of all governing jurisdictions.
City of Abbotsford

POSTED

about 21 hours ago

DEADLINE

in 24 days

AI Contract Overview

Show more

The Recovery Ellison Creek Watershed Project, solicitation number AG-4423-S-09-0018, involves the construction of grade control structure No. 3A in Mississippi. Funded by the American Recovery and Reinvestment Act, the project encompasses a wide range of civil engineering tasks, including clearing and grubbing, structure removal, extensive excavation and earthfill operations, and the installation of reinforced concrete and steel reinforcement. Additional requirements include the application of rock riprap, geotextiles, and lime-treated earthfill to ensure structural stability. The contract has an estimated price range between 1,000,000 and 5,000,000 dollars, with a total performance period of 457 calendar days. Key deliverables include quality control, construction surveys, and the management of a field office. The project falls under NAICS code 237990 and was managed by contract specialists Faith Tillman and Verlene M. Ratliff.

General Info

Agency

N/A

Contract Value

$1,354,051

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Yazoo County, MS, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

3 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

Response deadline time changed from 7:30 PM UTC to 6:30 PM UTC on Sep 15, 2009. The notice description changed.

Notice updated

The notice title changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
Contacts2 people available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
Contacts
Faith TillmanContract Specialist
Verlene M. RatliffAdministrative Contracting Officer

Full Description

Show more
THIS WORK IS FUNDED BY THE AMERICAN RECOVERY AND REINVESTMENT ACT (ARRA). The work consists of construction of grade control structure No. 3A. The major items of work are: Clearing and Grubbing - 1 lump sum; Structure Removal - 1 lump sum; Protective Cover - 5.2 acres; Construction Surveys - 1 lump sum; Removal of Water - 1 lump sum; Excavation, Common - 12,400 C.Y.; Earthfill, Class A - 3,850 C.Y.; Earthfill, Class A, Offsite - 1,380 C.Y.; Drainfill - 330 C.Y.; Topsoil - 8,200 S.Y.; Reinforced Concrete, Class 4000 - 792 C.Y.; Steel Reinforcement - 199,730 lbs.; Rock Riprap - 2,100 tons; Filter Material for Rock Riprap - 320 C.Y.; Fencing, Temp. Type - 1,340 L.F.; Quality Control - 1 lump sum; Geotextile - 1,250 S.Y.; Field Office - 1 lump sum; Lime Treated Earthfill - 6,550 C.Y.; Lime Hydrated or Quick - 188 tons; Agricultural Lime - 94 tons; Concrete Grout - 111 C.Y.; and Mobilization & Demobilization - 1 lump sum. This work is to be completed within 457 calendar days. Estimated price range for this work is $1,000,000 to $5,000,000. All responsible sources may submit a bid which shall be considered by the agency. Interested parties may access and download the solicitation files on or about August 14, 2009.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS