Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on August 4, 2009. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

RECOVERY - FXBM081106 - Repair to Leed-28 HQ Operations Group (B7925 & B7918)

Awarded
FA4690-09-R-K113Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
International
2383 Emerson Street - Modular Pump Track - Design-Build Services
Solicitation # RFP 1220-2026-4364
The City of Abbotsford has issued Request for Proposals RFP 1220-2026-4364 for design-build services to create a complete, safe, durable, and fully operational modular pump track facility at 2383 Emerson Street. The project follows a stipulated price contract based on the CCDC 14-2013 Design-Build Agreement. The selected Design-Builder will be responsible for all professional design and engineering services, including the preparation of sealed plans, as well as the provision of all labor, materials, modular pump track units, and site furnishings. Additionally, the contractor must obtain all necessary permits, licenses, and certificates of inspection required by federal, provincial, and local authorities. A mandatory site visit is scheduled for November 9, 2026, at 10:00 AM local time, and attendance is required for proposal submission. The deadline for responses is November 24, 2026, at 10:00 PM. Project acceptance is contingent upon the Consultant and Owner's satisfaction regarding the rectification of deficient work, completion of landscaping and clean-up, and the facility reaching full operational readiness. Payments will be processed via progress payment approvals issued by the City Representative. All work must adhere to the rules and customs of best trade practice and meet the requirements of all governing jurisdictions.
City of Abbotsford

POSTED

1 day ago

DEADLINE

in 23 days

General Info

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Ellsworth AFB, ELLSWORTH AFB, SD, 57706, USA

Set-Aside

NONE

Documents

1
DOC, High priority: read this firstmodification
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

2 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

Response deadline changed from Apr 13, 2009 to Jun 20, 2009. The notice title changed. The notice description changed.

Notice updated

Notice type changed from Presolicitation to Solicitation. Response deadline time changed from 11:00 PM UTC to 9:00 PM UTC on Jun 20, 2009. The point of contact changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA4690 28 Cons Pkc
Contacts1 person available
OfficeELLSWORTH AFB, SD, 57706-4947, USA
Office AddressELLSWORTH AFB, SD, 57706-4947, USA
Contacts
David L. MendelsohnConstruction Flight Chief

Full Description

Show more
THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO THE MULTIPLE AWARD CONTRACT CONTRACTORS UNDER THE EXISTING ELLSWORTH AFB 8(A) MACC IDIQ CONTRACT. Repair To LEED 28 HQ/OG (Buildings 7925 and 7918) 1. Project shall consist of design, investigate, and Repair the LEED 28th HQ Facility, Building 7925, and the 28th OG Facility, Building 7918. Accomplish all design, investigate, and repair LEED work for 28th HQ Facility, Building 7925, and the 28th OG Facility, Building 7918 as detailed in the statement of work accomplishing various energy and facility improvements to the 28th HQ Facility, Building 7925, and the 28th OG Facility, Building 7918. As a minimum, the following work shall be accomplished: a. Building 7925: i. Replace exterior windows with 1" thick thermal pane windows, clad exterior and inside light laminated for force protection. Exterior clad color and interior finish to match existing finishes. ii. Replace the existing translucent roof and wall system with an insulated (min R-20), translucent system. iii. Replace the existing roof mounted relief air vent with a smaller, roof mounted vent interconnected with the HVAC system. iv. Replace existing hot water boiler with high efficiency, condensing type boilers. v. Replace the existing constant speed hot water and chilled water pumps with variable speed drives, motors and pumps. ABB drives are preferred. vi. Replace the existing domestic hot water heater with a high efficiency, condensing type water heater. vii. Perform retro commissioning of the entire HVAC system consisting of air handling units, VAV boxes and controls. Identify components that are currently not operating properly and replace parts up to $50K/building. Replacement costs to be negotiated prior to ordering and replacing items and then subtracted from the $50K. Any unused amount of this line item will be returned to the government. viii. Replace existing lighting with energy efficient lighting. ix. Replace existing electrical transformers within the facility with high efficiency K rated transformers. b. Building 7918: i. Replace exterior windows on the east and south side of the building with 1" thick thermal pane windows, clad exterior and inside light laminated for force protection. Exterior clad color and interior finish to match existing finishes. ii. Replace the existing power operated entrance doors with manually operated doors with 1" thick thermal pane windows, clad exterior and inside light laminated for force protection. Exterior clad color and interior finish to match existing finishes. iii. Replace the existing translucent wall and roof system with an insulated (min R-20), translucent system. iv. Replace the existing constant speed hot water and chilled water pumps with variable speed drives, motors and pumps. ABB drives are preferred. v. Perform retro commissioning of the entire HVAC system consisting of air handling units, VAV boxes and controls. Identify components that are currently not operating properly and replace parts up to $50K/building. Replacement costs to be negotiated prior to ordering and replacing items and then subtracted from the $50K. Any unused amount of this line item will be returned to the government. vi. Repair the outside air intake dampers on Air Handling Unit 1. vii. Replace existing pneumatic HVAC controls with electronic controls compatible with the existing Honeywell control system. The contractor shall be responsible for programming all new devices including programming on the existing Honeywell EBI system. viii. Replace existing lighting with energy efficient lighting. ix. Replace existing electrical transformers within the facility with high efficiency K rated transformers. 2. The contractor shall be responsible for accomplishing all design and investigative services for this project. Project magnitue is between $1,000,000 and $5,000,000.

More opportunities from Department Of Defense → FA4690 28 Cons Pkc

Same awarding agency

NAICS: 517111
New
Federal
Local SIP Hardware Modernization, Remote ESIP Upgrade, Legacy Voice Transition
Solicitation # FA4690-27-R-SIP1
The Department of Defense, through the 28th Contracting Squadron, is seeking sources for a turn-key Session Initiation Protocol (SIP) boundary hardware modernization and remote Voice Protection System (VPS) Enterprise SIP (ESIP) software implementation at Ellsworth AFB, SD. This small business set-aside project under NAICS 517111 involves a two-phase approach: the installation and configuration of DoDIN APL-certified hardware—including redundant Session Border Controllers supporting 115 Concurrent Call Paths, edge gateway routers, and managed PoE+ switches—interfacing with Avaya Aura Communication Manager Version 10.2, and the uninterrupted sustainment of 17 legacy circuits for approximately nine months during the parallel build-out. The project concludes with a zero-downtime cutover within a 30-day window and a 12-month total period of performance. Key requirements include the delivery of a 42U equipment cabinet in Building 4307 and the demonstration of 100% compliant GETS and E911 emergency call routing. Contractors must provide personnel with OEM certifications for Avaya Aura, SecureLogix, and SBC platforms, and all staff must undergo Tier 1 background investigations and OPSEC training. Compliance with supply chain security standards per RFO Subpart 40.2 and FAR Clause 52.240-91 is mandatory. Final acceptance by the Contracting Officer is contingent upon successful System Acceptance Testing, a 30-day burn-in period, and the delivery of four hours of administrative knowledge transfer to 28 CS technicians.
Wired Telecommunications Carriers

POSTED

3 days ago

DEADLINE

in 11 days
View Details
NAICS: 517111
New
Federal
Local SIP Voice Trunk Telecommunications Services (Base plus 4 Option Years)
Solicitation # FA4690-26-R-SIP2
Solicitation FA4690-26-R-SIP2 is a small business set-aside for the provision of continuous, monthly recurring commercial Local Session Initiation Protocol (SIP) Voice Trunk dialing and transport services for Ellsworth AFB, South Dakota. The contractor will deliver carrier-class SIP voice trunk telecommunications to the demarcation point in Building 4307, interfacing with the base Avaya Aura Communication Manager Version 10.2. The requirement includes the delivery of 115 Concurrent Call Paths (CCPs), 9,000 Direct Inward Dialing (DID) numbers, and full support for E911 geolocation and Government Emergency Telecommunications Service (GETS) priority dialing. Technical performance standards require network availability of at least 99.9 percent, one-way latency of 50ms or less, jitter of 20ms or less, packet loss under 0.1 percent, and a minimum Mean Opinion Score of 4.0. The contract is structured as a firm-fixed-price commercial utility service with a twelve-month base year and four consecutive twelve-month option years, with a potential six-month extension under FAR 52.217-8, totaling a potential duration of 66 months. Performance and billing will only commence upon formal government written acceptance of a successful 30-day cutover and testing period. The contractor must ensure all facilities and services comply with DoDIN APL certification standards and supply chain risk requirements per RFO Subpart 40.2 and FAR 52.240-91. Administration is handled by the 28th Contracting Squadron, with surveillance retained by the Contracting Officer and electronic invoicing processed via Wide Area Workflow. Maintenance personnel must adhere to strict base access and security protocols, including REAL ID compliance and the protection of Controlled Unclassified Information.
Wired Telecommunications Carriers

POSTED

3 days ago

DEADLINE

in 11 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS