Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from General Services Administration was posted on May 11, 2010. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

(Recovery) GSA/NCR Design-Build Construction Project Funded by the Recovery Act (Cohen Building)

Closed
GS-11P-10-YA-C-0043AFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Federal
REQUEST FOR INFORMATION (RFI) / MARKET RESEARCH NOTICE RELATED TO SEVERAL UPCOMING PROJECTS at WRIGHT-PATTERSON AFB, OHIO
Solicitation # W912QR26_RFI_CONSOLIDATEDPROJECTS_WPAFB
The U.S. Army Corps of Engineers, supporting the U.S. Air Force, is conducting market research via a Request for Information to identify qualified industry partners for seven construction and renovation projects at Wright-Patterson Air Force Base, Ohio. These projects range in scope from the renovation of sensitive Special Access Program spaces and the construction of a 90,000 square foot research laboratory to the modernization of compressor facility systems, the decentralization of heating plants, and the repair of military dormitories. The estimated acquisition magnitudes for these individual efforts vary significantly, with the largest project valued at approximately 160 million dollars. The government intends to utilize Other Transaction Agreements and a Progressive Design-Build delivery method, which splits the work into a collaborative design and pre-construction phase followed by a construction phase based on a Guaranteed Maximum Price. Interested firms must provide detailed company profiles, evidence of cybersecurity compliance through CMMC and SPRS, and experience with complex MEP infrastructure and secure facility standards. Responses are due by November 2, 2026, and should be submitted to the primary point of contact in PDF format.
W072 Endist Louisville

POSTED

about 2 hours ago

DEADLINE

in 12 days
NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, located in California with a specific focus on the Riverside and Los Angeles project areas, is designated as a set-aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation. The solicitation was posted on October 21, 2026, with a response deadline of November 4, 2026. A critical component of this contract is strict adherence to six Good Faith Effort (GFE) requirements designed to secure project financing and expand upon State Water Resources Control Board standards. Bidders must provide proof of publicity, including online postings for 30 consecutive days and a one-day print newspaper advertisement, as well as evidence of utilizing the Small Business Administration and Minority Business Development Agency. These specific documents must be submitted with the bid package to avoid being deemed non-responsive. Additionally, documentation of DBE outreach may be submitted up to three business days after the bid closing date. Failure to comply with these GFE mandates will result in the disqualification of the proposal.
RT CONTRACTOR CORP

POSTED

about 8 hours ago

DEADLINE

in 13 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the creation of a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. Additionally, Option 1 includes a separate 17,978 square foot laboratory facility with similar structural specifications and the demolition of Building 1272T, a 548 square meter engineering facility. The scope of work encompasses comprehensive site improvements, including landscaping, parking, exterior lighting, telecommunications, and underground stormwater retention systems. Pricing is requested across a wide range of trades, including demolition, abatement, concrete, masonry, structural steel, mechanical, electrical, plumbing, and fire protection. This is an SBA set-aside solicitation for small businesses and other designated disadvantaged business categories. All work must adhere to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 8 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of a new 2.0 million gallons per day wastewater treatment plant located at 41901 Walnut Avenue in Greenfield, California. The project scope is divided into four distinct phases: site preparation including soil stabilization and facility relocation; construction of the plant featuring a packaged Membrane Bioreactor, headworks, UV disinfection, SCADA systems, and various support buildings; decommissioning and demolition of existing facilities; and finish facilities including the Walnut Avenue extension and a second sludge handling unit. The total duration for the project is 915 calendar days, with a critical requirement to maintain existing plant services and regulatory compliance throughout the first two phases. Managed by C. Overaa & Co., the solicitation is open to various small and disadvantaged business enterprises, including DBE, SDVOSB, and WOSB. A significant local hiring goal requires that 50 percent of the total construction workforce be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic invoicing system and agree to the Overaa standard agreement without modification. Bids are due by November 10, 2026, following a mandatory pre-bid meeting held on October 5, 2026. Performance and labor bonds for 100 percent of the subcontract price may be required, and all subcontractors must provide a waiver of subrogation endorsement for workers compensation insurance.
C. Overaa & Co.

POSTED

about 8 hours ago

DEADLINE

in 19 days

General Info

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

330 Independence Avenue, S.W., WASHINGTON, DC, 20201, USA

Set-Aside

8A

Documents

21

3-8-10+Pre-Proposal+Meeting+Presentation+FINAL.ppt

PPT

Agreement_-__GS-11P-10-YA-C-0043A.doc

DOC

COHEN-+APPENDIX+A-+Building+Key+Plans.pdf

PDF

Cohen-+APPENDIX+B-+Cut+Sheets+Lighting+Controls.pdf

PDF

Cohen-+APPENDIX+C-+Existing+Equipment+List.pdf

PDF

Cohen-ASB-LBP-PCB-rpt.doc

DOC

Cohen+Volumes+1%262++2010.04.19.pdf

PDF

FOB8++-+Document+Transmittal+Form.doc

DOC

Group+3+Resolicitation+Bid+Table.doc

DOC

GS11P10YAC0043A.pdf

PDF

HSPD-12+Standard+Clause+Language-Updated+6-1-09.doc

DOC

REPS-CERTS+%28C301%29.doc

DOC

SBU+Clause+6-1-09.doc

DOC

Solicitation_-__GS-11P-10-YA-C-0043A.doc

DOC

TableI-HomogeneousAreaAssessmentTable-Cohen.xls

XLS

TableIII-PCBFloorInventoryTable-Cohen.xls

XLS

TableII-LeadBasedPaintComponentTable-Cohen.xls

XLS

TableIV-SuspectACMRoomInventoryTable-Cohen.xls

XLS

TableVI-RoomsSelectedforHUDModifiedSurvey-Cohen.xls

XLS

TableV-LeadComponentRoomInventoryTable-Cohen.xls

XLS

VPP+Evaluation+Clause.doc

DOC

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

2 updates
PhaseClosed
Posted

Combined Synopsis

Notice updated

The notice description changed.

Deadline changed

Response deadline changed from May 24, 2010 to May 11, 2010.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeneral Services Administration → Pbs R11 Construction Services Divsion Center 1
Contacts2 people available
OfficeWASHINGTON, DC, 20405, USA
Office AddressWASHINGTON, DC, 20405, USA
Contacts

Full Description

Show more
THIS COMBINED SYNOPSIS / SOLICITATION IS CANCELLED. FOR ANY QUESTIONS REGARDING THIS NOTIFICATION, PLEASE CONTACT Mr. Curtis E. Glover Sr. at (202) 273-4779 or via email curtis.glover@gsa.gov RECOVERY ACT This is a Request for Proposal (RFP) for Design-Build projects with the U.S. General Services Administration's (GSA) National Capital region. This is a competitive 8a acquisition under FAR Part 15, Firm Fixed Price acquisition for Design/Build (DB) projects. The North American Industry Classification system (NAICS) Codes are: 236220 (Construction), 541310 (Architect) and/or 541330 (Engineering). This competitive 8a requirement is for Design/Build (D-B) projects with the purpose of re-commissioning federal facilities located in the Washington D.C. area, State of Virginia, and the State of Maryland. The scopes of work will include, but not be limited to: 1) upgrading Building Systems via installation of high-performance HVAC components in buildings which will both decrease energy consumption and operations cost; 2) building tune-ups which include re-commissioning to reduce energy demand, reduce operation and maintenance costs, improve building system control, and occupant comfort (This may include hardware and software upgrades to the building control systems or replacing the existing building automation software systems-These building tune-ups include many small-cost, high-impact changes to motors, sensors, and equipment-Data input devices such as advanced utility meters and meteorological instruments may be included); 3) lighting replacement projects which include high-performance lighting that will both decrease energy consumption and cost, and improve working conditions and productivity for building occupants to both improve the quality of light and working conditions and result in significant reduction in the lighting energy consumption. In addition to the work described above, it is anticipated that the contracts may include specified repair, asbestos, PCB, and lead-base paint abatement, and design and construction services relating to, but not limited to, civil, mechanical, plumbing, structural, electrical, heating, ventilation and air conditioning (HVAC), instrumentation, anti-terrorism and force protection, in addition to all other general design and construction activities. NOTE: These projects require firms to provide for Architect, Engineering, and Construction Services. If your company lacks one of these required services, your firm must create a partnership with a business that can complement/fulfill ALL the needed requirements by the submission of solicitation due date, which is scheduled for June 7, 2010 at 1pm EST.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS