Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity was posted on March 6, 2009. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Recovery - Rectification Geotech Survey International Dam to Riverside Weir

Awarded
Letter_RFP_09-15Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
Road Asset Management
Solicitation # FY27-ENGCP-002-6
The Bulloch County Board of Commissioners is soliciting Statements of Qualifications for project FY27-ENGCP-002-6, focused on Road Asset Management. The selected consultant will be responsible for collecting and analyzing field data, creating a road asset inventory, and developing a Capital Improvement Plan with an outlook extending to FY 35. The scope includes GIS database development, web-based mapping, and the identification of structural hazards and drainage failures to minimize safety risks and legal liability. All prime and sub-consultants must be GDOT Prequalified Contractors as of the submission deadline on November 20, 2026, at 3:00 PM EDT. Proposals are evaluated based on a composite scoring system that weights prime consultant experience and technical approach at 20% each, GIS capabilities at 20%, asset prioritization methodology at 15%, workload capacity at 15%, and past references at 10%. The highest-ranked consultant will be invited to negotiate a contract. Key requirements include a Principal-in-Charge with at least 10 years of industry experience and comprehensive insurance coverage, including professional malpractice and general liability of at least 1 million dollars per occurrence. Submissions are limited to ten pages, excluding mandatory forms and charts, and must include a Non-Collusion Affidavit and Bidder Declaration. Either party may terminate the resulting agreement with 30 days written notice.
Bulloch County Board of Commissioners

POSTED

about 12 hours ago

DEADLINE

in 21 days
NAICS: 541330
New
International
CoT RFP Event Q30-01-2026-27
Solicitation # Q30-01-2026-27
The City of Tshwane is soliciting a service provider for professional engineering services to support town planning subdivision application processes on city-owned properties. The scope of work is divided into three primary categories: Civil Services Reports, Geotechnical Investigations, and Route Determination Reports. All services must be led by a Professional Engineer registered with the Engineering Council of South Africa and must comply with the Gauteng Transport Infrastructure Act, National Building Regulations SANS 10400, and various SANS and SANRAL standards. The project follows a strict timeline, requiring an inception meeting within one month, draft reports within three months, final reports within five months, and project close-out within six months of appointment. The solicitation, numbered Q30-01-2026-27, closes on November 12, 2026, at 10:00. Awards are based on an 80/20 preferential point system in accordance with the Preferential Procurement Policy Framework Act and 2022 Regulations, with specific goals including points for women-owned, youth-owned, and disability-owned enterprises, as well as local economic participation. Evaluation occurs in four stages, starting with administrative responsiveness and a functionality score of at least 70 out of 100. Successful bidders must enter into a Service Level Agreement, with payment terms set at 30 days following the receipt of an invoice. Required submission documents include company registration, tax clearance or a CSD unique pin, and B-BBEE certification.
City of Tshwane

POSTED

about 14 hours ago

DEADLINE

in 13 days

AI Contract Overview

Show more

The International Boundary and Water Commission, United States Section, has issued a task order exclusively for S&B Infrastructure, Ltd. to perform a geotechnical analysis and engineering evaluation of a levee reach from International Dam to Riverside Weir in El Paso County, Texas. This project covers approximately 11.1 miles and is necessary to meet FEMA certification requirements following a 2006 decertification. The contractor is responsible for evaluating foundation and slope stability, as well as seepage and piping potential, to determine if the levee provides adequate protection against a 100-year flood event. The contractor must provide all necessary labor, materials, and equipment, utilizing existing hydraulic, aerial, and geophysical studies provided by the government. The performance period runs from March 3, 2009, through June 2009. While work is to proceed immediately, costs are capped at 467,931.00 dollars until final negotiations are completed. The contractor was required to submit a cost proposal by March 10, 2009, with the final action to be definitized by March 24, 2009.

General Info

Agency

N/A

Contract Value

$612,066

NAICS

541330 - Engineering Services

Place of Performance

TX, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseAwarded
Posted

Award Notice

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
Contacts1 person available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
Contacts
Colleen J. ElliottContracting Specialist

Full Description

Show more
THIS NOTICE IS PROVIDED FOR INFORMATION PLANNING PURPOSES ONLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO THE CONTRACTOR UNDER IBM05D0001, S&B INFRASTRUCTURE, LTD. The International Boundary & Water Commission, United States Section (USIBWC), requires the services in accordance with the scope of work (SOW) entitled Geotechnical Analysis and Engineering Evaluation of Rectification Project Levee from International Dam to Riverside Weir with El Paso County, Texas. Unit prices per bore hole and tests with estimated not-to-exceed quantities are required. The Rio Grande Rectification Project is located along the Rio Grande in El Paso and Hudspeth Counties from American Dam to Fort Quitman. FEMA decertification of the United States Section of the International Boundary and Water Commission's (USIBWC) levees in El Paso County, TX, in February 2006 has resulted in public and local government pressure to upgrade the levees to FEMA criteria. In 2007, the USIBWC raised the levees in the Rectification Project in El Paso County from International Dam to Riverside Weir to meet the minimum 3 feet of freeboard criteria based on a 100-year design flood event modeled on HEC-RAS. This reach, excluding the Chamizal Channel, represents approximately 11.1 miles of the 100 levee miles in the Rectification Project on the United States side. The work required under this Scope of Work will be limited to this 11.1 mile reach. In order to meet all FEMA certification requirements, the USIBWC now requires that a full geotechnical evaluation of the levee reach from International Dam to Riverside Weir, excluding the levees within the concrete lined Chamizal Channel, be conducted. The geotechnical investigations shall evaluate foundation stability, slope stability, as well as potential for seepage or piping through and/or below the levee in critical and questionable areas. The USIBWC requires that a determination be made by the Contractor if this levee reach will provide adequate safety and protection against a 100 year flood event and the loadings that an event of that magnitude would impose on the levee. The Contractor shall perform all the necessary geotechnical evaluations required to make this determination. The USIBWC has conducted hydraulic, aerial, and geophysical studies of the Rectification Project and these studies will be provide to the Contractor to aid the in the geotechnical assessment. A. Pursuant to the contract Federal Acquisition Regulation (FAR) clause 52.216-18 entitled - Ordering (Oct 1995),' the Contractor shall furnish all labor, materials, equipment, supervision and transportation necessary to accomplish the previously cited and attached SOW. B. The Contractor shall immediately proceed with the work. The costs associated with the unilateral task order shall be negotiated in accordance with the following schedule: (1) The Contractor shall submit to the Government the cost proposal (reference letter RFP # 09-15) for performing the work no later than March 10, 2009 and (2) Upon completion of negotiations, the Government will issue a modification to the task order Definitizing the action no later than March 24, 2009. C. Until such time as the costs for the work are negotiated, the Contractor shall not incur costs exceeding $467,931.00. Any costs exceeding $467,931.00 are incurred at the Contractor's own risk and the Government is not obligated to reimburse the Contractor for these excess costs. The performance period is 03/03/09 through 06/09/09 (98 calendar days from Notice to Proceed/Award of Unilateral Task Order IBM09T0013).

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS