Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on November 2, 2009. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

RECOVERY--Y--Comprehensive Everglades Restoration Plan, 112375, C, Picayune Strand, Merritt Pumping Station, Collier County, Florida

Awarded
W912EP09R0032Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
International
2383 Emerson Street - Modular Pump Track - Design-Build Services
Solicitation # RFP 1220-2026-4364
The City of Abbotsford has issued Request for Proposals RFP 1220-2026-4364 for design-build services to create a complete, safe, durable, and fully operational modular pump track facility at 2383 Emerson Street. The project follows a stipulated price contract based on the CCDC 14-2013 Design-Build Agreement. The selected Design-Builder will be responsible for all professional design and engineering services, including the preparation of sealed plans, as well as the provision of all labor, materials, modular pump track units, and site furnishings. Additionally, the contractor must obtain all necessary permits, licenses, and certificates of inspection required by federal, provincial, and local authorities. A mandatory site visit is scheduled for November 9, 2026, at 10:00 AM local time, and attendance is required for proposal submission. The deadline for responses is November 24, 2026, at 10:00 PM. Project acceptance is contingent upon the Consultant and Owner's satisfaction regarding the rectification of deficient work, completion of landscaping and clean-up, and the facility reaching full operational readiness. Payments will be processed via progress payment approvals issued by the City Representative. All work must adhere to the rules and customs of best trade practice and meet the requirements of all governing jurisdictions.
City of Abbotsford

POSTED

about 12 hours ago

DEADLINE

in 25 days

AI Contract Overview

Show more

The Picayune Strand Restoration Project, part of the Comprehensive Everglades Restoration Plan in Collier County, Florida, aims to restore pre-drainage hydrology and ecology to the Southern Golden Gate Estates. The scope of work involves the construction of the Merritt Pump Station, tie-back levees, spreader berms, and canal plugs to redistribute water across the landscape. The pump station will feature a firm capacity of 810 CFS across six bays, utilizing a combination of 75 CFS and 220 CFS pumps. The contractor is responsible for the comprehensive installation of mechanical equipment, including diesel pumps and generators, as well as complex electrical and instrumentation systems, SCADA software, and telemetry equipment. Additional requirements include the construction of fully enclosed buildings, access bridges, fuel storage, and the installation of a radio antenna tower and power infrastructure in coordination with Florida Power and Light. The contractor must also maintain existing construction access roads and the Construction Village infrastructure. The contract includes three specific options: a 12-month operational testing and monitoring period, a potential six-month extension of that period, and the installation of ten east-west canal plugs following the commissioning of the pump station.

General Info

Contract Value

$65,392,220.89

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

FL, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

9 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

The notice title changed. The notice description changed.

Notice updated

The notice description changed.

Deadline changed

Response deadline changed from Sep 18, 2009 to Sep 29, 2009.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Deadline changed

Response deadline changed from Sep 29, 2009 to Oct 2, 2009.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W074 Endist Jacksnvlle
ContactsNo contacts available
OfficeJACKSONVILLE, FL, 32207-0019, USA
Office AddressJACKSONVILLE, FL, 32207-0019, USA
ContactsNo contact information available

Full Description

Show more
The Picayune Strand Restoration Project, Merritt Pump Station and Levees, Canals and Roads is part of the Comprehensive Everglades Restoration Plan (CERP). The project will help to restore the area known formerly as the Southern Golden Gate Estates to its pre-drainage hydrology and ecology, generating positive effects on the hydrology, vegetation and wildlife of the project area and surrounding public lands. The Project consists of a pump station, tie-back levees, spreader berms and canal plugs which will slow water flowing through existing canals and redistribute it across the landscape. The construction of the Pump Station, which shall have 2-75 CFS pumps and 4-220 CFS pumps, for a firm capacity of 810 CFS and 6 bays, includes the following: Mechanical equipment to be provided and installed by the Contractor will include, but not be limited to, diesel pumps, traveling trash rakes, bridge cranes, standby diesel generators, vacuum priming systems, HVAC equipment, cooling water pumps, fresh water pumps, water treatment equipment, lubricating water equipment, potable water equipment, and other miscellaneous mechanical equipment. Electrical and Instrumentation equipment to be provided and installed by Contractor will include, but not be limited to, station power distribution systems, station switchgear, motor control centers, local and station programmable logic controllers to control and monitor all ancillary mechanical equipment, grounding cable system, lighting, Control Room Operator Work Station with monitoring and control computers, uninterrupted power service equipment, remote terminal unit system, all supporting switches, wiring, conduits, junction boxes, etc. to interconnect with equipment for control and monitoring. Telemetry system equipment requirements: Ethernet Network Switches (Cisco); MOSCAD Programmable Logic Controllers (Motorola); Microwave Ethernet Bridges (Harris Truepoint); Engine, motor, and station Programmable Logic Controllers (PLCs) (Allen Bradley); Surveillance Cameras and associated software (Mobotix); Central Control System SCADA software (Telvent); Security Alarm Panels (Ademco); Fire Alarm Panels (Silent Knight); Central Control System computers (Dell); and Firewall Router (Juniper). The Contractor shall furnish and install a transformer pad and the primary conduit per Florida Power and Light (FP&L) requirements. The Contractor shall install the primary conduits provided by FP&L that run from the FP&L termination pole to the new primary transformer; also shall furnish and install the secondary 480 v building service conduits and cables and terminate both ends of the service cables. FP&L shall provide and install the primary transformer, the termination pole, and the primary cables. The Contractor shall furnish and install an 80 foot radio antenna tower; furnish and install an electrical conduit from the control room to the radio antenna towers. The Contractor shall provide and install the antennas and Remote Terminal Units at the pump station. Several items of work are included by use of options; they include: Option A - Operational testing and monitoring period (OTMP) of 12 months which will be exercised after testing and commissioning of the pumping station. During this period the station will be operated by the sponsor and the Contractor will have specific tasks to be performed on a monthly basis; Option B month to month extension of the OTMP for a maximum of 6 months; and Option C plugging of east-west canals (10 plugs) which will be exercised after testing and commissioning of the pump station is complete. Construction of the station will include, but not be limited to, excavation, station substructure, backfill, fully enclosed buildings for the equipment, access bridges, fuel storage areas with containment and all associated equipment, sanitary facility, approach and discharge canals, retaining walls, trash racks, and related civil works. The Work will also include, but not be limited to, the pumping stations' approach and discharge canals. Contractor shall be responsible for operating and maintaining the existing construction access roads, existing Construction Village area infrastructure including sanitary, waste removal, mowing, asphalt repair, and site drainage consisting of small ditches, culverts and pumps, and providing overall security for the Construction Village. Contractor shall construct tie-back levees, spreader berms and canal plugs and construct temporary access from I-75.

More opportunities from Department Of Defense → W074 Endist Jacksnvlle

Same awarding agency

NAICS: 237990
New
Federal
St. Lucie South Jetty Repair Industry Day
Solicitation # W912EP27Z1CUE
The U.S. Army Corps of Engineers, Jacksonville District, is conducting a preliminary planning phase for the St. Lucie South Jetty Rehabilitation project in Martin County, Florida. This is currently a special notice for an Industry Day event scheduled for December 7, 2026, and is not a formal solicitation for proposals. The project is planned for a fiscal year 2027 award under NAICS code 237990, with a price target range between 25 and 50 million dollars and an estimated period of performance of 730 calendar days. The scope of work involves rehabilitating the seaward-most 400 to 500 feet of the south jetty structure. Key activities include excavating bed material to place a widened marine mattress foundation, installing 9- to 15-ton toe protection and armor stones, and removing the existing asphalt walkway. The project requires strict adherence to environmental protections for Endangered Species Act listed species, including turtle deterrents and turbidity control measures. The government is seeking industry feedback on construction methodologies, equipment, and safety constraints, specifically regarding water-control measures like cofferdams and operational strategies for winter coastal conditions. Interested parties are invited to submit capabilities statements and responses to a technical questionnaire by December 4, 2026.
Other Heavy and Civil Engineering Construction

POSTED

about 19 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 541620
New
Federal
Notice of Intent to solicit a single source – Fish and Macroinvertebrate (Nekton) Monitoring (St. Johns River)
Solicitation # W912EP-27-Q-1CTH
The U.S. Army Corps of Engineers, Jacksonville District, intends to award a sole-source contract to the Fish and Wildlife Research Institute of the Florida Fish and Wildlife Conservation Commission. The project focuses on nekton monitoring within selected zones and tributaries of the Lower St. Johns River in Northeast Florida. This effort is categorized under NAICS code 541620 for Environmental Consulting Services and is designed to assess the ecological impacts of a 2022 channel deepening project that increased the river depth to 47 feet to accommodate larger vessels for the Jacksonville Port Authority. The primary objective is to evaluate how changes in salinity and water quality resulting from the deepening affect the spawning, recruitment, and population dynamics of commercially and recreationally important species, such as blue crab, white shrimp, and red drum. Monitoring will specifically target critical habitats between river kilometers 14 and 48, as well as areas upstream of Julington Creek, to determine if shifting salinity gradients are impacting nursery habitats or resident freshwater species. This long-term sampling will provide the necessary data to gauge the overall environmental effects of the channel modifications on the estuary's nekton assemblages.
Environmental Consulting Services

POSTED

4 days ago

DEADLINE

in 11 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS