RECOVERY--Z--PROJECT NUMBER 2840, Center Hill Lake, TN Replacement of Control Cables at the Center Hill Power Plant, Project of the Nashville District U.S. Army Corps of Engineers.

Awarded
W912P510R0008Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237130
New
SLED
Installation of Buried Fiber Optic Cable Stanton North Substation to Hoskins Substation
Solicitation # 26085
The Nebraska Public Power District is soliciting bids for Request for Bid No. 26085 to install approximately six miles of underground fiber optic cable between the Stanton North and Hoskins Substations in northeast Nebraska. The scope of work encompasses all labor, materials, and supervision required for staking, material coordination, property owner contacts, schedule preparation, mobilization, demobilization, and right-of-way restoration. Key deliverables include the installation of contractor-provided 48-strand buried fiber optic cable and district-provided 48-strand all-dielectric fiber, starting from the Hoskins 345kV substation control building. Work must be completed by April 15, 2027, with an expected award date on or before November 25, 2026. Qualified bidders must demonstrate the completion of at least three similar projects within the last five years and provide certifications regarding litigation and bonding history. Bids are due by November 13, 2026, and must include a completed pricing spreadsheet, current labor and equipment rates, and a proposed schedule. The contract will be awarded to the responsible bidder with the best evaluated bid based on price, technical conformance, and general qualifications. Payment terms specify that 95 percent of the price is paid upon acceptable performance, with 5 percent retained until final acceptance. Contractors are required to maintain comprehensive insurance coverages, including Commercial General Liability of 1 million dollars per occurrence and Workers Compensation as required by the State of Nebraska.
Nebraska Public Power District

POSTED

about 13 hours ago

DEADLINE

in 15 days
NAICS: 237130
New
Federal
B21 Utilities & Site Improvements, Communications & Electrical Infrastructure, Dyess AFB OT Feasibility & Business Feedback
Solicitation # W9126G27R1CSY
The U.S. Army Corps of Engineers, Fort Worth District, is conducting market research via a Sources Sought notice for the B-21 Utilities and Site Improvements project at Dyess Air Force Base, Texas. This initiative aims to establish high-reliability primary electrical power distribution and dedicated fiber-optic communications infrastructure to support the bed-down of the B-21 weapons system. The scope includes the installation of single-mode fiber optic cables, telephone system expansion, power cabling in concrete encased ducts, pole-mounted conductors, and associated transformers and switchgear. The project also encompasses site improvements such as earthwork, grading, and erosion control. The estimated Construction Cost Limitation is $28,550,000, though an $8 million electric substation and specific end-user network equipment are expressly excluded from this contract. The government is currently evaluating whether to utilize a traditional Federal Acquisition Regulation based contract or an Other Transaction Agreement under 10 U.S.C. section 2808a. If a collaborative procurement framework is chosen, a two-phase selection process will be implemented, focusing first on technical capability, past performance, and collaborative execution history, followed by an evaluation of final technical and price proposals. The project must adhere to strict Department of Defense standards, including UFC 1-200-01 for general building requirements, UFC 4-010-01 for antiterrorism, and UFC 4-010-06 for cybersecurity of facility-related control systems. The anticipated period of performance is 690 calendar days from the notice to proceed, with a required beneficial occupancy date of March 8, 2030.
W076 Endist Ft Worth

POSTED

about 14 hours ago

DEADLINE

in 14 days
NAICS: 237130
New
SLED
De Palma Road Electrical Conduit Installation Project
Solicitation # TLARC-819
The County of Riverside is soliciting bids for the De Palma Road Electrical Conduit Installation Project (Project No. D4-0072) located in the Community of Horsethief Canyon, California. The project involves the excavation and backfill of approximately 1,000 feet of trenching, the installation of 685 feet of 1.5-inch and 350 feet of 3-inch electrical conduit and handholes, and the installation of 6-inch Type D concrete curb per County Standard No. 204. All work must adhere to Southern California Edison plans and be completed within 30 working days from the commencement date specified in the County's written order. The estimated project cost is 209,000 dollars. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit their proposals by December 2, 2026, at 1:30 P.M. Pacific Time, including a non-collusion declaration and a bid guarantee of 10 percent of the total bid. The awarded contractor must provide performance and payment bonds, comply with California State Labor Code prevailing wage requirements, and adhere to specific affirmative action plans based on contract value and employee count. Payments will be made monthly, with the Owner paying 90 percent of the value of labor and materials incorporated into the work and 75 percent of materials stored on site, subject to certification by the Architect.
COUNTY OF RIVERSIDE

POSTED

about 19 hours ago

DEADLINE

in about 1 month
NAICS: 237130
New
SLED
Installation Of Street Lighting On Raymond Avenue From Maple Street To North City Limits
Solicitation # 2026-IFB-CIV-0549
The City of Pasadena Department of Public Works is soliciting bids under solicitation number 2026-IFB-CIV-0549 for the installation of a new street lighting system on Raymond Avenue, extending from Maple Street to the North City Limits. The project requires the contractor to furnish and install concrete street lighting standards, foundations, LED luminaires and fixtures, conduits, conductors, pull boxes, and other appurtenant work. Key technical deliverables include 29W or 50W LED replacements, galvanized steel conduits, and 6 foot Type S Scroll Arms. The contractor must provide all necessary labor, materials, and equipment, ensuring compliance with the ADA, CBC, Title 24, and PROWAG accessibility guidelines. Bids must be submitted electronically via the City of Pasadena eProcurement Portal by 2:00 pm on November 17, 2026. Qualified bidders must provide evidence of experience with two similar governmental projects and submit several mandatory documents, including Form AA-1, Form AA-2 for labor exceeding 25,000 dollars, a non-collusion declaration, and a DHS contract disclosure. A bid security of five percent of the total bid price is required, and the successful awardee must provide material and faithful performance bonds for 100 percent of the base bid. Work must commence within 15 calendar days of the Notice to Proceed and be completed within 20 working days. Invoicing is handled through the city's Vendor Invoice Portal, with payments issued on Tuesdays and Thursdays.
City of Pasadena Department of Public Works

POSTED

about 19 hours ago

DEADLINE

in 19 days
NAICS: 237130
New
SLED
115kV Transmission Line 1266 Rebuild Stanton North Substation to Dead-End Structure 79
Solicitation # 26-012
Nebraska Public Power District is soliciting sealed bids for Contract No. 26-012 to rebuild approximately 4.05 miles of the 115kV transmission line 1266, extending from the Stanton North substation to Dead-End Structure 79. The scope of work requires the contractor to provide all labor, supervision, equipment, and miscellaneous materials to replace all structures, conductors, shield wires, and hardware. Key technical deliverables include the installation of 28 wood H-Frame tangent structures and one tubular steel monopole dead-end on a drilled pier, upgrading the conductor to 954 kcmil 45/7 ASCR Rail, and installing 0.551 diameter fiber optic ground wire and EHS steel shield wire. The project also involves tree clearing, site preparation, and the removal of existing structures and conductors. Bids are due by 2:00 p.m. CST on December 2, 2026, and must be submitted as sealed hard copies to the Procurement Department in Columbus, Nebraska. The award will be based on the lowest cost and best bid, with evaluation factors including technical conformance, schedule capability, financial standing, and past performance history. Prospective bidders are encouraged to attend an optional pre-bid teleconference and site visit on November 23, 2026. Required submission documents include a signed proposal page, a completed price quotation table, a W-9 form, and bid security in the form of a certified check, irrevocable letter of credit, or bid bond. The successful contractor must provide a performance bond and maintain workers compensation and commercial general liability insurance.
Nebraska Public Power District

POSTED

1 day ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

This contract was awarded by the Department of Defense, specifically the Nashville District of the U.S. Army Corps of Engineers, as a sole source award under the 8(a) Program. The project involves comprehensive electrical infrastructure upgrades at the Center Hill Power Plant in Tennessee. The scope of work requires the contractor to provide all labor, equipment, and materials to install temporary control cables for one generator to maintain operational availability, followed by the complete replacement of existing control and low voltage power cables, switchyard conduits, and cable trays. Key technical requirements include ensuring all new installations are compatible with existing systems and comply with NFPA 70 and NEMA standards. The project involves working with various voltages, including 125 VDC, 120 VAC, 220 VAC, and 480 VAC. Additionally, the contractor is responsible for the safe removal of asbestos-containing cable insulation and trays, as well as sealing seepage cracks in concrete cable tunnels using hydrophobic polyurethane grout.

General Info

Contract Value

$3,305,682.8

NAICS

237130 - Power and Communication Line and Related Structures Construction

Place of Performance

TN, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseAwarded
Posted

Presolicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W072 Endist Nashville
ContactsNo contacts available
OfficeNASHVILLE, TN, 37203-1070, USA
Office AddressNASHVILLE, TN, 37203-1070, USA
ContactsNo contact information available

Full Description

Show more
This contract action was accomplished using other than competitive procedures because a statute exists that expressly authorizes or requires that the acquisition be made from a specific source or through another agency (FAR 6.302-5); specifically, Sole source awards under the 8(a) Program. Per FAR 6.302-5 a J&A is not required for this award. 8(a) Direct Award-Project consists of furnishing all labor, equipment, materials, hardware, and miscellaneous items necessary to install temporary control cables for one generator, completely replace existing control and low voltage power cables, switchyard portion of control cable conduits, cable trays and sealing of seepage cracks that run through the Spread Room, Control cable tunnel and Power cable tunnel at Center Hill Power Plant. The Contractor shall verify that all new temporary and permanent cables to be installed be, as a minimum, technically and operationally compatible with the cables for which they are replacing, utilizing current state-of-art manufacturing standards, and in compliance with the most current national, state, and local standards or codes. The work covered by this section of the specifications includes, but is not limited to the following items: a. Furnish and install temporary control cables for the complete operation of one hydroelectric generator in such a way that generator availability is maximized during the balance of the project. Temporary cables shall be of the same size and insulation resistance as those originally installed. The cables shall be suitable for the environment they will be located in and will meet or exceed all NFPA 70: NEC 2008 requirements or other applicable standards and/or codes. Cables furnished and installed shall be new. b. Completely remove, furnish new and install all control and low voltage power cables that go through the Power Cable tunnel from origination point to termination point for the complete operation of the main hydroelectric generators. Replace, as needed, other control cables from origination point to termination point. The cables shall be replaced with the same size, length and insulation resistance as originally installed. The cables shall be suitable for the environment they will be located in and will meet or exceed all NFPA 70 requirements. The voltage of the cables varies and includes but is not limited to 125 VDC, 120 VAC, 220 VAC and 480 VAC. It is anticipated that cable insulation contains asbestos. c. Remove, furnish new and install all existing control cable conduits that originate in the cable tunnel to their termination points at the equipment they service in the switchyard for the complete operation of the main hydroelectric generators. The conduits shall be of rigid metal and galvanized to resist corrosion and of the same size as the conduit they are replacing. All conduit shall have fittings designed to cross expansion joints. All connection joints will be sealed to prevent the entrance of water. All bends and connections will be done in a professional manner by personnel experienced in working with conduit and will comply with existing NEMA standards and NFPA 70: NEC 2008 or other applicable standards and/or codes. Conduits furnished and installed shall be new. d. Remove, furnish new and install all cable trays located in the Spread room, Control cable tunnel and Power cable tunnel for the complete operation of the main hydroelectric generators. Cable trays contain asbestos and should not be sawed or broken). Cable trays should be replaced with new cable trays sufficient to sustain the load of the designated wiring. The new cable trays should be of the perforated or ladder design and have a finish that is designed for the environment they are located in. Cable trays shall meet or exceed NFPA 70: NEC 2008 or other applicable standards and/or codes. e. Seal seepage cracks in the concrete cable tunnels. Hydrophobic polyurethane grout shall be used. Crack sealing shall be performed after demolition of existing generator leads and prior to installation of new cable trays and generator leads.

More opportunities from Department Of Defense → W072 Endist Nashville

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS