This Combined Synopsis/Solicitation opportunity from Department Of State was posted on May 7, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Recreational Center (VW) pool repairs
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract requires a contractor to undertake repairs at the Swimming pool of Villa Washington, located at the U.S. Embassy in Brazzaville. The scope of work involves removing existing wall sealant from the pool walls and bottom floor, preparing the surface for resurfacing, and installing new tiles. Additional tasks include correcting any piping leaks, controlling erosion of the pool deck, and managing debris and trash removal. Bids must cover all labor, materials, equipment, transportation, and services necessary for the complete performance of the work, ensuring compliance with both local and U.S. standard construction industry practices. The solicitation, titled "Recreational Center (VW) pool repairs" and referenced by solicitation number 19CF2026Q0008, was posted on May 7, 2026, with a response deadline of May 14, 2026. The contract type is combined, with no set-aside restrictions. Notably, the solicitation was amended to add a checklist for bidders and to remove any references to pool heating functionality, which is no longer required. The point of contact for the contract includes representatives from the U.S. Embassy in Brazzaville, ensuring clear communication throughout the procurement process.
General Info
Agency
NAICS
Place of Performance
Brazzaville , DC, COGSet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
The U.S. Embassy in Brazzaville requires the services of the contractor to remove existing wall sealant depth wall and bottom floor within the Swimming pool of Villa Washington. Bids should include all labor, materials, equipment required to prepare resurfacing and install new titles within the pool, correct piping leak, pool deck erosion control, debris/trash removal, transportation and services for completion of work outlined and shall be in accordance with local and US Standard construction industry practices.
Solicitation has been amended to add a checklist on page 24.
Solicitation has been amended to remove mentions to pool heating functionality as it no longer needed (See Page 8, Section 4.3.8)
