Redwood Road MPM 5.41 Slide Repair Project RDS26-22

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → Napa County

NAICS

N/A

Place of Performance

Redwood Road and Mark Elk Ranch Road, Napa, CA, 94558

Set-Aside

NONE

Documents

(1)

Redwood Road MPM 5

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Napa County
Contacts2 people available
OfficeN/A
Organization / Agency
California → Napa County
Office AddressN/A
Contacts
Dana Eleanor MorrisonSupervising Planner - Conservation
Dewey PhanAssistant Engineer

Full Description

Show more
Winter storms in 2024-2025 caused a small landslide that undermined about 33 feet of the roadway edge, leaving part of the asphalt unsupported and creating a steep drop down to a private driveway. The slide repair will include installing a Rock Slope Protection (RSP) buttress and restoring the damaged section of the Redwood Road. The RSP is proposed to be constructed at a 1:1 slope, about ten feet high, averaging five feet in thickness. Following installation of the downslope RSP, the damaged road surface will be filled and repaved. Roadway reconstruction will extend about 100 feet, and the existing roadway ditch will be lined with asphalt to reduce erosion. Although repair work will be conducted within the boundaries of Redwood Road, the Project does not propose to change the alignment or create visual or audible changes to the landscape, maintaining the integrity of the road and its ability to convey its potential historic significance. While some vegetation will be impacted by the Project, no trees will be removed. After completion of the RSP buttress, the disturbed area at the slide area below the roadway will be hydro seeded with native mix of grasses. Best Management Practices and erosion control will be implemented, as well as environmental commitments to protect environmental resources, including any potential special-status species or cultural resources that may occur in the project area.