Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Agriculture was posted on April 13, 2017. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Refurbished Rotary Tube Furnace

Closed
BRU-2017-01Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 333994
New
SLED
Purchase of Walk-in Ovens
Solicitation # F2027038
Tarrant County is soliciting bids for the replacement of three commercial ovens at the Lon Evans Corrections Center under solicitation number F2027038. The project requires the awarded vendor to provide all labor and materials for the uninstallation and removal of existing equipment and the installation of three new double rack rotating ovens. To be eligible for award, bidders must bid on all items and meet strict technical specifications, including the use of a 275k BTU gas system, a Type I hood with UL 710 listed grease filters, compliance with NFPA-96 requirements, and the inclusion of a prison security package. The contract will be awarded to the lowest bidder meeting these specifications. Bidders must submit detailed product specifications, warranty information, and electrical and gas system requirements, ensuring all delivery, labor, travel, and freight costs are included in the installation pricing. The response deadline is November 30, 2026. Tarrant County adheres to a HUB policy for disadvantaged business enterprises and requires that bidders do not owe delinquent property taxes within the county. Payment is typically issued within thirty days of receiving the invoice or items, and the county maintains audit rights for twelve months following final payment. Additionally, vendors must comply with data security standards and may be subject to criminal background checks for personnel accessing secure facilities.
Tarrant County

POSTED

5 days ago

DEADLINE

in about 1 month
NAICS: 333994
New
DIBBS
CARTRIDGE, DEHYDRATOR
Solicitation # SPE8E8-27-T-0203
Solicitation SPE8E8-27-T-0203 is a request for the procurement of 21 dehydrator cartridges, identified by NSN 4440-01-582-6344 and part number 657-400-001 from Compass Instruments Inc. The items are designated as Type 2 Code 9 with an extendable shelf life of 60 months. Delivery is required within 29 days of award, with a need ship date of November 25, 2026, and a final required delivery date of November 30, 2026. The shipment is FOB Origin and will be delivered to the DLA Distribution DDSP New Cumberland Facility in Pennsylvania. Inspection and acceptance will occur at the destination. The contract mandates strict adherence to MIL-STD-2073-1E for packaging, RP001 for palletization, and MIL-STD-129 for marking. Technical and quality requirements are governed by the DLA Master List, including specific provisions for source approval requests and the removal of government identification from non-accepted supplies. All quotes must be submitted via the DIBBS portal by October 26, 2026. The award process may be automated, and the government will not evaluate offers utilizing additive manufacturing. Key regulatory compliance includes the Buy American Act, the Berry Amendment, and various FAR/DFARS clauses regarding cybersecurity, human trafficking, and telecommunications equipment. Invoicing must be processed electronically through the Wide Area WorkFlow system.
DDSP NEW CUMBERLAND FACILITY

POSTED

7 days ago

DEADLINE

in 5 days
NAICS: 333994
New
DIBBS
AUTO-CLAVE UPGRADE
Solicitation # SPE4A8-27-Q-0003
Solicitation SPE4A8-27-Q-0003 is a request for a firm-fixed-price contract issued by the Defense Logistics Agency Weapons Support for the upgrade of a medium Thermal Equipment Corporation composite autoclave system located at the Fleet Readiness Center East in MCAS Cherry Point, North Carolina. The scope of work involves furnishing, installing, and integrating critical hardware upgrades, including the replacement of the Motor Control Center and its internal wiring, vacuum receivers, receiver control valve assemblies, I/P pressure transducers, and the cooling-coil vacuum breaker. Additionally, the contractor must replace the scissor-lift bridge hoist system and its associated locking mechanisms with a new self-contained Hydraulic Power Unit and install a government-provided Windows 11 HMI computer and color inkjet printer. The contract requires a performance period of 365 days after receipt of order, with specific deliverables including technical data, installation services, and IUID tagging in accordance with MIL-STD-130N. All work must adhere to strict safety and technical standards, including NFPA 70, ISO 4413, and OSHA 29 CFR 1910. This acquisition is set aside for Small Business, HUBZone Small Business, and Service-Disabled Veteran-Owned Small Business concerns. Award will be based on best value, evaluating technical compliance, past performance, and price. Offerors must submit detailed technical quotes, descriptive literature, and past performance questionnaires via DIBBS, email, or mail by the closing date of November 23, 2026.
Defense Logistics Agency

POSTED

7 days ago

DEADLINE

in about 1 month

General Info

NAICS

333994 - Industrial Process Furnace and Oven Manufacturing

Place of Performance

US Department of Agriculture Agricultural Research Service Western Regional Research Center 800 Buchanan Street, ALBANY, CA, 94710-1105, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseClosed
Posted

Combined Synopsis

Notice updated

Response deadline changed from Apr 10, 2017 to Apr 17, 2017. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → USDA Ars Pwa Aao Acq/per Prop
Contacts1 person available
OfficeALBANY, CA, 94710, USA
Office AddressALBANY, CA, 94710, USA
Contacts
Clarice E. DixsonContract Specialist

Full Description

Show more
BRU-2017-01 close date is extended until 2:00PM Pacific Time, April 17, 2017 The USDA, ARS, Western Regional Research Center, Albany, California has a requirement for a refurbished, rotary tube furnace preferably in almost new condition for plant material pyrolysis. The commercial item being considered is a Thermcraft rotary tube furnace Model TRT-6-0-72-3C-J12894/1A or equal. The furnace must have at least 3 heating sections for greater control of the temperature during pyrolysis, quartz tube, and auger; the heating sections must allow independently controlled temperatures. The furnace must be capable of heating up to 1000C with upgrade capability to 1200C, and operable using nitrogen gas. The interior diameter of the heated chamber must be at least 8.25-inches to accommodate 6-inch outside diameter quartz tube. The tube must be able to rotate at 0 - 10 rpm. The touch-screen control panel must be separate from the kiln. The unit must have a volumetric feeder with single screw and variable speed motor control; have an afterburner; frame for holding bulk bags of raw material; furnace tilt; and rotary tube speed of 0 - 10 rpm via chain drive. The rotary furnace cannot exceed 44-inches width, 144-inches length, 150-inches height. Provide installation/set-up/commissioning, user manuals, warranties, and shipping/freight fees. Responses to vendor questions: Question: How long for each heated section? Response: 24 inches. Question: What kW is required for the process? Response: 27kW. Question: What voltage is planned for this system? Response: 480V. Question: What are the sizes of the bag of bulk material and weights? Response: 20 inches tall x 18 inches wide. Question: How much tilt is required for the system? Response: 45 degrees. Question: Any thickness requirement for quartz tube? Response: At least 0.125 inches thick. Question: If the kiln will be used at 1200C, then better to use SiC heating rods, they can go up to 1350C working temperature and also easy to replace in the future. Response: SiC heating rods are acceptable. Question: Is there any information available about the gas tightness and how the nitrogen gas will be used? Is the nitrogen gas inside the process tube or outside of it? Response: Gas will be introduced inside the process tube. Question: Can the after burner be electric or does it need to be gas? What information is available to design the capacity of the afterburner? Response: The after burner is electric. Question: If you can provide the process flow chart, that will be better for us to evaluate. Response: A process flow chart is not available. This solicitation incorporates the following commercial FAR clauses by reference 52.212-1, 52.212-2, 52.212-3, 52.212-4, and 52.212-5. The following applicable FAR clauses are incorporated by reference: 52.222-3, 52.222-19, 52.222-21, 52.222-26, 52.222-35, 52.222-36, 52.225-13, 52.232-33, 52.232-36 (FAR clauses may be obtained at www.acquisition.gov). Interested vendors are encouraged to submit proposals including descriptive literature (refer to FAR 52.214.21) to Clarice Dixson, USDA, Agricultural Research Service, Western Regional Research Center, 800 Buchanan Street, Albany, CA 94710 or by e-mail to Clarice.Dixson@ars.usda.gov no later than 2:00PM PDST April 17, 2017.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS