Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Agriculture was posted on May 22, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Region 4 AE NSTM Bridge Inspections

Closed
1240LT26Q0085Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
International
R.T. Orr Dam Geotechnical Investigations
Solicitation # 2026-05
The Upper Thames River Conservation Authority is soliciting proposals for geotechnical investigations and assessments of the R.T. Orr Dam located in Stratford, Ontario. The project, which initiates in 2026 and must be substantially completed by March 15, 2027, is based on recommendations from a 2023 Dam Safety Review by D.M. Wills Associates Limited. The scope of work includes reviewing existing structural data, conducting a detailed seepage investigation at the downstream left armour stone retaining wall, performing supplementary field investigations for embankment slope stability, installing two nested monitoring wells in both earth embankments, and updating stability analyses for armour stone structures. All work must adhere to the LRIA Technical Bulletin for Geotechnical Design and Factors of Safety and meet Ontario Accessibility Standards for electronic deliverables. Proposals must be submitted electronically via the bids and tenders platform by 3:00 PM Eastern Daylight Time on November 18, 2026. The selection process utilizes a two-envelope system where technical qualifications in Envelope A are evaluated before the cost proposal in Envelope B is opened. Award decisions are based on best value, considering experience, understanding of the work, proposed methodology, schedule, and cost reasonableness. Selected consultants must provide proof of professional licensing, WSIB standing, and required insurance policies, while maintaining strict confidentiality regarding project information.
Upper Thames River Conservation Authority

POSTED

about 8 hours ago

DEADLINE

in 21 days
NAICS: 541330
New
SLED
Oso Parkway/Pacific Park Drive/Glenwood Drive Regional Traffic Signal Synchronization Project
Solicitation # 20261026016
The City of Aliso Viejo is soliciting proposals for a professional licensed consultant to provide regional traffic signal synchronization services for the Oso Parkway, Pacific Park Drive, and Glenwood Drive corridor. The project involves coordinating traffic signals across multiple jurisdictions, including the Cities of Aliso Viejo, Laguna Hills, Mission Viejo, Laguna Niguel, the County of Orange, and Caltrans, extending from Moulton Parkway to the SR-241 Northbound On-Ramp. The projected period of performance is from April 1, 2027, to September 30, 2030. The selected consultant will be responsible for providing all necessary labor, materials, and equipment to implement optimized signal timing in accordance with the Regional Traffic Signal Synchronization Master Plan and the City's Local Signal Synchronization Plan. Proposals are due by December 2, 2026, and must be submitted as one hard copy and one electronic PDF on a USB drive, with the cost proposal in a separate sealed envelope. Award decisions will be based on a weighted evaluation of the consultant's ability and skills, character and reputation, cost reasonableness, ability to meet time requirements, financial resources, and previous experience with the vendor. The contract is governed by the laws of the State of California with venue in Orange County. Key requirements include compliance with California prevailing wage laws, adherence to the City's Minority Business Enterprise program, and the submission of annual political contribution disclosures.
City of Aliso Viejo

POSTED

about 10 hours ago

DEADLINE

in about 1 month
NAICS: 541330
New
SLED
Buckhead CID Livable Centers Initiative Master Plan
Solicitation # 2026-10
The Buckhead Community Improvement District is soliciting proposals for the Buckhead Livable Centers Initiative Master Plan, a project aimed at updating the 2017 LCI plan to improve accessibility, walkability, and transit use. The scope of work focuses on the Buckhead and Lenox MARTA station areas and their connected mixed-use districts. Key deliverables include an existing conditions assessment report, a regulatory code study and audit, and the advancement of both a central gathering place/park plan and a walkable streetscape prototype to 30 percent completion. The total budget for this project is 300,000 dollars, with payments made via monthly invoices and progress reports. The project is funded through the Atlanta Regional Commission’s Livable Centers Initiative program and must adhere to federal regulations 49 CFR Part 18 and 49 CFR Part 26 regarding competitive procurement and Disadvantaged Business Enterprise participation. Additionally, the contractor must comply with the Georgia Security and Immigration Compliance Act and the Clean Air Act Amendments of 1990. The performance period begins with a notice to proceed on December 21, 2026, with a project kickoff in January 2027 and a final completion deadline of November 19, 2027. Selection will be based on the consultant's qualifications, prior experience, proposed approach, and understanding of the local Buckhead context.
Buckhead Community Improvement District

POSTED

about 11 hours ago

DEADLINE

in 16 days

AI Contract Overview

Show more

This contract is a special notice for a Total Small Business Set-Aside under FAR 19.5, restricted exclusively to holders of the Department of the Interior/Fish and Wildlife Service AE MATOC operating in Idaho, Utah, Wyoming, and Nevada. The scope involves routine and Non-redundant Steel Tension Member (NSTM) bridge inspections on USDA Forest Service bridges within the Intermountain Region (Region 4), requiring full compliance with the USDA Forest Service Bridge Inspection Guide Version 3.1-INTERIM 2024 and FHWA’s SNBI Specifications. All inspections must be conducted by or under the direct supervision of a licensed Professional Structural or Civil Engineer in one of the four states, with inspectors holding valid certifications issued by the Forest Service. Work must be performed within a 24-month plus 30-day inspection window and coordinated with local Forest contacts to align with access schedules, while traffic control adheres to MUTCD standards and vehicle delays must not exceed 30 minutes unless approved. All data must be entered into the AssetIntel™ inspectX™ bridge management system, including SNBI Geometric, Span Set, and Substructure Set data, with critical findings reported within 24 hours and final inspection reports submitted within 45 days of fieldwork. Supplemental files, such as photos, sketches, and prior inspection reports, must be uploaded to the Pinyon A&E shared folder. Performance is scheduled from May 1, 2025, through December 31, 2026, with a firm delivery schedule of 14 inspections for NSTM and concurrent routine inspections. No pricing information is disclosed in the solicitation, and the contract type is inferred as an IDIQ task order under an existing MATOC vehicle. Offerors must submit proposals exclusively through the inspectX system, and only SF-330 submittals from qualified MATOC holders will be considered. The Contracting Officer’s Representative includes Tyrone Stone and Chad Porter, with invoicing handled internally through the Forest Service’s asset management platform rather than standard federal systems. Compliance with government-furnished documentation, including inspection guidelines and certification forms, is mandatory, and there are no options for contract extension specified, though the recurring nature of inspections implies potential future task orders.

General Info

Small business set-aside for bridge inspections in four states, requiring MATOC holders, licensed engineers, and AssetIntel™ submissions by 2026.

NAICS

541330 - Engineering Services

Place of Performance

ID, USA

Set-Aside

SBA

Documents

2

R4 2026 NSTM and Routine Bridge Inspection Task Order

DOCX, High priority: read this firstsow
High

C04 R4 2026 NSTM Bridge Inspection List

XLSX, Low priorityinspection-list
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Response Deadline

Deadline has passed

Posted

special-notice

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Region 4 Intermountain Regional Office
Contacts1 person available
OfficeOGDEN, UT, 84401, USA
Office AddressOGDEN, UT, 84401, USA
Contacts
Derrick Dodson

Full Description

Show more

RESTRICTED TO DEPARTMENT OF INTERIOR/FISH AND WILDLIFE
SERVICE AE MATOC HOLDERS - Idaho, Utah, Wyaoming and Nevada ONLY Other SF-330 submittals will not be considered or opened.



All bridges are within the Forest Service (FS) Intermountain Region (Region 4) National Forests in Idaho, Nevada, Utah and Wyoming.  See attached bridge inspection list. Coordination may be necessary with the following Forest contacts to ensure that proposed inspection schedules align with expected access:

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS