Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Connecticut was posted on July 29, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Rehabilitation of Ford Street Tank No. 1 (Rebid)

Closed
Rehabilitation of Ford Street Tank No. 1 (Rebid)State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Project FDC-214-102565.1 involves the demolition of an existing concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County, Pennsylvania. Managed by the Pennsylvania Department of Conservation and Natural Resources, the scope of work encompasses site preparation, including the installation and removal of erosion and sediment control measures and the implementation of a traffic control plan. Technical requirements include stripping and stockpiling topsoil, surface water control, dewatering subgrades, excavation, and the placement of select fill. The project concludes with site restoration, including topsoil application and seeding in all disturbed areas. All work must adhere to specific ASTM International standards for soil analysis and compaction, and the contractor is required to provide a complete set of as-built drawings upon completion. The contract will be awarded to the lowest responsible and responsive bidder, with an engineer's estimate exceeding 1 million dollars. Bidders must meet mandatory participation goals of 19 percent for Small Disadvantaged Businesses and 3 percent for Veteran Business Enterprises. Required securities include a bid guaranty, a 100 percent performance bond, a 100 percent material and labor payment bond, and a 50 percent maintenance bond. Contractors must comply with extensive Pennsylvania state labor laws, including the Prevailing Wage Act and the Construction Workplace Misclassification Act. Payments are processed via Automated Clearing House, and the contractor is responsible for engaging an independent testing laboratory for quality control services, subject to oversight by the Department's quality assurance program.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 11 hours ago

DEADLINE

in 16 days
NAICS: 237990
New
SLED
Design Build Services For 8 New Pickleball Courts With Lighting
Solicitation # S-1397
The City of Garden Grove is soliciting Statements of Qualification for a design-build project to construct eight new pickleball courts with lighting at Garden Grove Park. The scope of work encompasses all labor, materials, engineering, and construction services, including permitting, site preparation, surfacing, striping, fencing, and electrical infrastructure. All improvements must be ADA-compliant and adhere to the California Public Contract Code and Garden Grove Municipal Code. The estimated construction cost is between 1,000,000 and 1,200,000 dollars, with a guaranteed maximum price not to exceed 1,200,000 dollars. The procurement follows a two-step selection process. In the first step, the city will evaluate Statement of Qualifications based on experience, professional qualifications, technical capabilities, project team, safety record, financial capability, and demonstrated performance to shortlist the three highest-scoring firms. These firms will then advance to a second step to submit a proposal for a best-value award. Interested entities must submit their SOQ via the Planet Bids portal by November 20, 2026. Mandatory requirements include a certification form, a firm information form, and a surety declaration demonstrating the capacity to obtain performance and payment bonds for 100 percent of the project value from a surety with an AM Best rating of A- Class VII or better.
City of Garden Grove

POSTED

about 12 hours ago

DEADLINE

in 24 days

AI Contract Overview

Show more

The South Central Connecticut Regional Water Authority is seeking bids for the rehabilitation of Ford Street Tank No. 1. This project involves comprehensive maintenance and structural upgrades, including blasting and painting both the interior water cavities and tank exteriors. Key technical requirements include replacing existing roof vents, installing new stairs to replace access ladders, removing cathodic protection systems, and replacing the Tank No. 1 weir box with a new interior overflow weir. The bidding process is currently open, with a final due date of August 26, 2026. A mandatory pre-bid meeting is scheduled for August 12, 2026, at 10:00 AM at the Ford Street Tanks located in Milford, Connecticut. Interested parties should coordinate with the primary point of contact, Mr. Brenden Fimian, for further inquiries and registration.

General Info

Rehabilitate Ford Street Tank No. 1: blasting, painting, vent and stair replacement, weir upgrade, mandatory pre-bid August 12, 2026.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

3 updates
PhaseClosed
Posted

Solicitation

Notice updated

Response deadline time changed from 6:00 PM UTC to 4:00 AM UTC on Aug 26, 2026. The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencySouth Central Connecticut Regional Water Authority
Contacts1 person available
OfficeCT, USA
Office AddressCT, USA
Contacts
Mr. Brenden Fimian South Central Connecticut Regional Water Authority 90 Sargent Drive New HavenContact

Full Description

Show more
Return to Bid List Bid NUMBER Rehabilitation of Ford Street Tank No. 1 (Rebid) TITLE Rehabilitation of Ford Street Tank No. 1 (Rebid) PROCESS One Step Unsealing BASE CURRENCY USD STATUS Open for Bidding CLOSES IN 27 days: 10 hours: 27 minutes: 37 seconds DESCRIPTION BIDDERS CALENDAR
You must log in to register for Bid Events and to view Bid Question and Response information.
NUMBER Rehabilitation of Ford Street Tank No. 1 (Rebid) TITLE Rehabilitation of Ford Street Tank No. 1 (Rebid) AVAILABLE DATE 7/29/2026 8:00 AM DUE DATE 8/26/2026 12:00 AM CONTACT INFORMATION Mr. Brenden Fimian South Central Connecticut Regional Water Authority 90 Sargent Drive  New Haven, CT 06511 Phone: +1 (555) 000-0000  Email: contact@example.gov 
BID TYPE Default Bid Type DESCRIPTION The project includes blasting and painting the interior water cavities and tank exteriors. The project also includes the replacement of the existing roof vents, the installation of new stairs to replace the existing tanks access ladders, the removal of the existing cathodic protection systems, the removal of the existing Tank No. 1 weir box and the installation of a new overflow weir on the interior of the tank.  PRE-BID MEETING INFORMATION PRE-BID MEETING? Yes - Mandatory Attendance PRE-BID MEETING DATE AND TIME 8/12/2026 10:00 AM PRE-BID MEETING LOCATION Ford Street Tanks 357 Ford Street, Milford, CT

More opportunities from South Central Connecticut Regional Water Authority

Same awarding agency

NAICS: 237110
SLED
Route 80 Control Valve Improvements – Phase 2
Solicitation # Route 80 Control Valve Improvements – Phase 2
The Route 80 Control Valve Improvements Phase 2 project involves the construction of a below-grade valve vault and associated infrastructure, including piping, a new access driveway, drainage and stormwater management systems, fencing, site lighting, and electrical and communications work. The scope of work further includes the installation of approximately 1,100 feet of 36-inch ductile iron pipe transmission main, 960 feet of 12-inch ductile iron pipe distribution main on Barnes Avenue, and a 36-inch tapping sleeve and valve on Quinnipiac Avenue. The project also covers temporary water mains and services, replacement water services, restoration, and the relocation of existing storm drainage and sanitary sewer service laterals. Eligible bidders must hold a current State of Connecticut Department of Administrative Services Prequalification Certificate in either Water Treatment Plants or Sewer and Water Lines. The contract is subject to Davis-Bacon and state prevailing wage requirements, as well as specific Minority and Women’s Business Enterprise subcontracting goals of 3.0 and 5.0 percent, respectively. A mandatory pre-bid meeting is scheduled for October 6, 2026, at 10:00 a.m. at 125 Barnes Avenue, New Haven, CT, requiring a written request for attendance by October 5, 2026. Bids are due by October 28, 2026, at 2:00 p.m.
Water and Sewer Line and Related Structures Construction

POSTED

about 1 month ago

DEADLINE

in about 14 hours
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS