Reinforced Concrete Spillway and Floodwall Construction

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Reinforced Concrete Spillway and Floodwall Construction involves performing forming and pouring of reinforced concrete for prime contractors on Kentucky Division of Water, Energy and Environmental Cabinet dam projects. The scope of work includes the construction of an auxiliary spillway, stepped chute, stilling basin, and a floodwall featuring a concrete cutoff along the upstream crest, utilizing concrete pumps and specialized forming systems to deliver completed structures. The project is managed by the Kentucky Department of Environmental Protection under NAICS code 237990. Interested parties must submit their responses by the deadline of September 17, 2026, following the posting date of September 3, 2026.

General Info

Subcontract for reinforced concrete spillway and floodwall construction due September 17, 2026.

Agency

Kentucky → Dept- Environmental ProtectionView Agency

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Other, KY, USA

Set-Aside

NONE

Documents

This scope was carved out of RFB-785-2600000643.

The full solicitation package (15 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

RFB-785-2600000643-8 | RFB-275-26 Willisburg Lake Dam Rehabilitation Project

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyKentucky → Dept- Environmental Protection
ContactsNo contacts available
OfficeN/A
Organization / Agency
Kentucky → Dept- Environmental Protection
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs forming and pouring of reinforced concrete for prime contractors on Kentucky Division of Water, Energy and Environmental Cabinet dam projects. Constructs an auxiliary spillway, stepped chute, stilling basin, and a floodwall with a concrete cutoff along the upstream crest. Uses concrete pumps and forming systems. Delivers completed concrete structures.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
North of River Sanitary District No. 1 WRRF Upgrades and Expansion
Solicitation # north-river-sanitary-district-no-1-wrrf-upgrades-expansion
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North of River Sanitary District No. 1 WRRF Upgrades and Expansion project located in Bakersfield, California. The scope of work is extensive, covering civil and site work such as aggregates, trucking, asphalt paving, and pipe installation, as well as structural and finishing tasks including masonry, welding, roofing, electrical work, and interior finishes. Interested firms must contact Kiewit to receive an Invitation to Bid through the Building Connected system, with a response deadline of September 17, 2026, at 10:00 a.m. The project is partially financed by the Water Infrastructure Finance and Innovation Act (WIFIA) and administered by the EPA, making it subject to the American Iron and Steel (AIS) Provisions, Davis-Bacon Related Acts, and DBE Program requirements. Qualified bidders must possess a valid California Contractor’s license and provide acceptable insurance. Additionally, responsible subcontractors may be required to provide bonding for 100% of their contract value, with bond premiums reimbursed by Kiewit. The solicitation specifically encourages participation from certified DBE, MBE, WBE, and other small business enterprises, requiring evidence of certification from recognized agencies such as the US EPA, SBA, or CA DOT.
Kiewit Infrastructure West Co.

POSTED

about 9 hours ago

DEADLINE

in 11 days
View Details
NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
The Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair project, solicitation W9128A26BA002, is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District. Located in Haleiwa, Oahu, Hawaii, the scope of work involves maintenance dredging of approximately 4,260 cubic yards with ocean disposal south of Oahu, vegetation clearance, and repairs to the revetted mole, including stone rework and filling voids. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the Notice to Proceed. This solicitation is set aside for small businesses, including SDB, WOSB, HUBZone, VOSB, and SDVOSB concerns, with a specific price evaluation preference for HUBZone small businesses. Bids must be submitted as sealed physical envelopes by September 30, 2026, as electronic submissions are not permitted. Key requirements for a responsive bid include active SAM registration, a bid guarantee, and the submission of SF 1442. The contractor must provide key personnel, including a Project Manager and Site Safety and Health Officer, and adhere to Davis-Bacon Act wage requirements. Acceptance of the dredging work is based on pre- and post-dredge multi-beam hydrographic surveys conducted by a third-party qualified surveyor. Liquidated damages for delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

about 9 hours ago

DEADLINE

in 23 days
View Details
NAICS: 237990
New
SLED
Thompson River Dredging and Remediation
Solicitation # ITB2026-187PW
The City of Palm Beach Gardens, through its Public Works department, has issued solicitation ITB2026-187PW for the Thompson River Dredging and Remediation project. This initiative aims to address critical stormwater management needs by dredging accumulated sediment to restore hydraulic capacity and proper cross sections, regrading riverbanks, and installing sod revetment mat systems. The project is designed to mitigate bank erosion and stabilize long-term stormwater infrastructure, building upon previous restoration efforts and addressing vulnerabilities identified in the 2025 Comprehensive Vulnerability Assessment. The scope includes erosion control, environmental protection measures, and full site restoration, with the City anticipating one additional future capital project to finalize the river's long-term restoration. This project is funded by a State of Florida grant and requires strict adherence to all grant requirements, environmental regulations, and permitting conditions. Bids must be submitted via the OpenGov e-procurement platform by September 25, 2026, at 3:00 PM local time. The contract will be awarded to the single lowest-priced bidder who meets all eligibility, licensing, and certification requirements. Selected contractors must provide payment and performance bonds and comply with fixed pricing terms. Technical specifications for the work are supported by survey drawings covering the Thompson River Canal from Interstate I-95 south to Holly Drive.
Public Works

POSTED

about 21 hours ago

DEADLINE

in 19 days
View Details

More opportunities from Kentucky → Dept- Environmental Protection

Same awarding agency

NAICS: 237990
New
SLED
RFB-785-2600000643-8 | RFB-275-26 Willisburg Lake Dam Rehabilitation Project
Solicitation # RFB-785-2600000643
The Commonwealth of Kentucky Department of Environmental Protection is soliciting bids for the Willisburg Lake Dam Rehabilitation Project in Washington County, identified as RFB-275-26 or RFB-785-2600000643-8. The comprehensive scope of work includes the construction of a reinforced concrete auxiliary spillway and floodwall, the installation of rockfill stability berms, and the replacement of low-level drawdown valves. Additional requirements involve the remediation of concrete cracking and seepage, the abandonment and replacement of raw water intake lines, spillway culvert remediation, and various demolition, site preparation, and restoration activities. Contractors are also responsible for erosion control, traffic control, and the development of a contractor-designed water diversion plan. The solicitation process has undergone multiple modifications and addenda, with the final bid response deadline set for September 17, 2026, at 17:30. Bids must be submitted exclusively online, with the official bid document and bid bond combined into a single PDF file. Key technical constraints include a prohibition on driving piles into the dam embankment and the rejection of specific waterproofing material substitutions that do not meet puncture requirements. Notably, the project is exempt from domestic material requirements such as Buy America or American Iron and Steel. Primary contact for the project is Susan Ward, and the contract is managed through the Kentucky Department for Facilities and Support Services.
Other Heavy and Civil Engineering Construction

POSTED

4 days ago

DEADLINE

in 11 days
View Details