Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Agriculture was posted on July 6, 2016. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

RELOCATION AND REPAIR OF MIDDLE FORK TRAIL #1003. SNOQUALMIE RANGER DISTRICT

Awarded
AG-05M6-S-16-0044Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Carlson Field Athletic Complex: Construction of new Pickleball Courts
Solicitation # BCP-REC-26
The Town of Hingham, Massachusetts, is soliciting sealed bids for the construction of eight new pickleball courts at the Carlson Field Athletic Complex, with an estimated project cost of $1,300,000. The scope of work includes site preparation such as the removal of trees and shrubs, re-grading, and the installation of the courts, posts, nets, walkways, benches, shade shelters, and ADA pathways. Additionally, the project requires a new asphalt parking lot and the installation of solid AF-6 Acoustifence Panels around the entire perimeter for sound attenuation. The contractor is responsible for maintaining construction fencing and erosion control, coordinating closely with the Town and the demolition contractor, Pasquazzi Bros, Inc. The contract will be awarded to the lowest responsible and eligible bidder who possesses at least seven years of experience constructing sports courts or similar athletic facilities. Bidders must provide a statement of qualifications, including three similar public project examples and three references, one of which must be a Massachusetts municipality from the last two years. This is a lump sum, fixed-price contract with no escalation for fuel, labor, or materials. Compliance with Massachusetts prevailing wage laws, OSHA regulations, and the Massachusetts Building Code is mandatory. Bids must be submitted electronically via the OpenGov portal by November 3, 2026, at 9:00 am, and must include a 5% bid security.
Recreation

POSTED

about 14 hours ago

DEADLINE

in 4 days

AI Contract Overview

Show more

This firm-fixed-price construction contract involves the relocation of approximately 0.6 miles of a non-motorized, multiple-use trail at mile post 3.0 within the Snoqualmie Ranger District of the Mt. Baker-Snoqualmie National Forest in King County, Washington. The scope of work includes clearing, grubbing, excavation, embankment, the creation of switchbacks, and the installation of armored drainage structures. The project also includes two optional items: the supply and installation of 660 linear feet of imported surfacing and the removal and disposal of a 30-foot glu-laminated beam stock bridge. The contractor is responsible for all material procurement, mobilization, and construction activities, with specific noise timing restrictions in place for blasting and helicopter use. This project is 100 percent set aside for small businesses and requires a payment bond upon contract award. The government estimate for the work ranges between 25,000 and 100,000 dollars, with a required completion date of November 1, 2016.

General Info

Contract Value

$70,000

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

902 S. E. North Bend Way Bldg. 1, NORTH BEND, WA, 98045-9545, USA

Set-Aside

NONE

Award Issued Date

Documents

2

Copy_to_Submit_AG-05M6-S-16-0044_Relocation_of_Trail__1003.pdf

PDF

Solicitation_AG-05M6-S-16-0044_Relocation_of_Trail__1003.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseAwarded
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Mt Baker Snoqualmie National Forest
Contacts1 person available
OfficeEVERETT, WA, 98201, USA
Office AddressEVERETT, WA, 98201, USA

Full Description

Show more
PRESOLICITATION This project involves the construction of just over - (.6) mile of relocation at MP 3.0 on a long distance non-motorized, multiple use trail. Work includes the clearing, grubbing, excavation and embankment, switchbacks, and armored drainage structures. Option Item #1 is the supply and installation of 660 linear feet of imported surfacing. Option Item #2 involves the removal and isposal of 1 - 30' glu - laminated beam stock bridge (penta treated stringers, treated decking, and treated handrail posts). One stringer is cracked and broken, the other is intact. All of the treated material will be removed and disposed of. This bridge will not be part of the new trail location. The contractor will be responsible for the purchase of all materials, mobilization, and construction of all portions of the project. Mountain bicycles and pack animals are allowed on this trail. Helicopters and blasting have noise timing restrictions. Bonding in required (Payment Bond upon Contract Award). This project is located on the Snoqualmie Ranger District/North Bend Area, of the Mt. Baker-Snoqualmie National Forest. From Seattle or Bellevue, take I-90 east and take exit #34. Drive north on 468th Avenue. In 0.6 miles, turn right onto SE Middle Fork Road (Forest Service Road #56) The large and well-marked Middle Fork trailhead parking lot is on the right side of the road at 11.5 miles. Hike the Middle Fork Trail 3.0 miles to the beginning of the proposed relocation. The broken bridge is a just beyond the beginning of the relocation. GOVERNMENT ESTIMATE between $25,000 and $100,000 ESTIMATED DATE SOLICITATION WILL BE ISSUED June 8th, 2016 CONTRACT COMPLETION DATE November 1st 2016 CONTRACT TYPE Firm-Fixed-Price (FFP), Construction Contract PROJECT LOCATION State: Washington; County: King County. Snoqualmie Ranger District. PRE-BID CONFERENCE There will not be a pre-bid conference. TECHNICAL POINTS OF CONTACT Kathy White at +1 (555) 000-0000 or e-mail contact@example.gov This project is 100% set aside for Small Business.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS