Remove & Replace All Overhead Pipe Insultation on Existing Chilled Water Lines at Varennes Elementary
Active
7373-26/27State & Local
Response Deadline
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
Show more
Anderson School District Five is soliciting bids for the removal and replacement of all overhead pipe insulation on existing chilled water piping at Varennes Elementary. The project requires the removal of insulation, including black mastic containing asbestos, and must be performed by accredited personnel in compliance with EPA and South Carolina Department of Environmental Services regulations. All work must be completed by December 31, 2026, and scheduled during school breaks or after school hours to ensure the site is clean and ready for use each day. Vendors are responsible for performing all their own measurements as prints are unavailable.
The contract will be awarded to the lowest responsible responder based on bid price, conformity to specifications, delivery, quality of materials, and past performance. Bids must be submitted by November 16, 2026, at 10:00 am EST. The selected vendor must provide a workmanship guarantee consistent with industry standards and comply with federal requirements if federal funding is involved, including the Davis-Bacon Act and Buy American provisions. Additionally, contractors must adhere to the Family Educational Rights and Privacy Act regarding student record confidentiality and maintain a substance-free environment on district property.
General Info
Bids for asbestos pipe insulation replacement at Varennes Elementary due November 16, 2026.
HighAI Summary for Addendum #1 - Bid # 7372-26/27: Remove Overhead Pipe Insulation at Varennes Elementary: Addendum #1 dated October 16, 2026, for Bid # 7372-26/27 regarding chilled water pipe insulation at Varennes Elementary. It clarifies that the project includes both removal and replacement of insulation, notes that vendors are responsible for all measurements due to unavailable prints, and extends the submission deadline to October 30, 2026, at 10:00 am EST.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Anderson School District Five Bid # 7370-26/27 Addendum # 1: Addendum # 1 dated September 30, 2026, for Bid # 7370-26/27 regarding On-Site HVAC Filter Replacement. The document extends the bid submission deadline from October 1, 2026, to October 5, 2026, at 10:00 am EST and requires a signed acknowledgment from vendors.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Anderson School District Five Pre-Demolition ACM and LCP Survey Report: A pre-demolition asbestos-containing materials (ACM) and lead-containing paint (LCP) survey report for properties at 502 and 508 Pearman Dairy Road, Anderson, SC. Prepared by HRP Associates, Inc. and completed October 6, 2025, the report identifies hazardous materials across several structures to ensure compliance with EPA and SCDES regulations prior to demolition.
PDF
PDF, High priority: read this first31 pages · rfp
HighAI Summary for Anderson School District Five - Remove and Replace Baseball Backstop at Westside High: Solicitation number 7371 2 6/27 issued by Anderson School District Five for the removal and replacement of the baseball backstop padding at Westside High. The project requires compliance with SC High School League rules and regulations. Bids are due by October 9, 2026, at 10:00 am EST. Evaluation is based on meeting district needs (50%), cost (30%), and references (20%).
PDF
PDF, High priority: read this first30 pages · rfb
HighAI Summary for Anderson School District Five - Remove Pipe Insulation at Varennes Elementary: Request for Bid (Solicitation No. 7372 2 6/27) issued by Anderson School District Five on October 6, 2026. The project involves the removal of all overhead pipe insulation on chilled water piping at Varennes Elementary, including asbestos abatement as per an accompanying report. Bids are due by October 20, 2026, at 10:00 am EST. A mandatory site visit is required on October 14, 2026. Work must be completed by December 31, 2026, and performed during school breaks or after hours.
PDF
PDF, High priority: read this first10 pages · continuity-of-services-plan
HighAI Summary for Anderson School District Five Safe Return to In-Person Instruction Plan: This document is the Safe Return to In-Person Instruction and Continuity of Services Plan for Anderson School District Five, dated after the March 11, 2021 American Rescue Plan Act. It outlines the district's approach to maintaining health and safety in schools during the COVID-19 pandemic, including policies on mask wearing, physical distancing, hand hygiene, cleaning, contact tracing, testing, and vaccination efforts. The plan complies with ARP Act requirements and ESSER III grant terms, detailing protocols for safe reopening and ongoing operations to ensure continuity of education services.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for Anderson School District Five - Solicitation 7373-26/27: Request for Bid (RFB) issued by Anderson School District Five on November 2, 2026, for the removal and replacement of insulation on all overhead chilled water piping at Varennes Elementary. Bids are due by November 16, 2026, at 10:00 am EST. The document includes submission instructions, offeror identification requirements, and safety/background check compliance mandates for personnel on district property.
PDF
PDF, High priority: read this first14 pages · plan
HighAI Summary for ARP ESSER Plan - Anderson School District Five: This document is the ARP ESSER Plan for Anderson School District Five, detailing the use of funds awarded under the American Rescue Plan Elementary and Secondary School Emergency Relief Fund. It includes an introduction to the ARP Act funding, the total LEA award amount of $28,918,734, and the required 20 percent allocation for learning loss. The plan outlines prevention and mitigation strategies consistent with CDC guidance, focusing on air quality improvements, health and safety protocols, and long-term solutions to maintain safe in-person learning. A high-level budget is provided, showing allocations for learning loss, educational technology, mental health services, school facility repairs, and other activities. The document complies with ARP Act reporting requirements and includes sections on academic recovery plans, coordination efforts, and public input.
XLSX
XLSX, High priority: read this first42 pages · specifications
HighAI Summary for HVAC Filter Maintenance Inventory List: A detailed inventory and service schedule for quarterly preventative maintenance (PM-QTRLY) of HVAC filters across multiple sites, including the Adult Education Center (AEC), Anderson Institute of Technology (AIT), and Anderson School District Office (ASDO). The document specifies labor for washable filter services and specific material requirements for box pleat and poly TA filters, including dimensions and quantities per location.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Limited Asbestos Inspection Report - Varennes Elementary School: A limited asbestos inspection report dated August 5, 2026, prepared by Crossroads Environmental, LLC for Anderson School District #5. The report details the sampling of pipe insulation at Varennes Elementary School, specifically identifying that black mastic (HA01) contains greater than one percent asbestos. It includes regulatory recommendations for removal by accredited personnel and provides laboratory analysis results via PLM.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for Solicitation 7369-26/27 - Demo & Remove Multiple Buildings: Anderson School District Five Request for Bid solicitation 7369-26/27, issued 9/04/26, for demolition and removal of multiple buildings and cleaning/grading sites at district locations in Anderson, SC. The document includes submission instructions, due date of September 17, 2026 at 10:00 am EST, offer form requirements, acknowledgment of amendments, and compliance conditions. Key scope items include removal of 11 structures, disposal of hazardous materials per DHEC standards, removal of foundations/tie downs, site cleanup, grading, seeding/straw, and adherence to school property security and background check requirements.
PDF
PDF, High priority: read this first31 pages · rfb
HighAI Summary for Solicitation 7370 2 6/27 - On-Site HVAC Filter Replacement: Request for Bid (RFB) issued by Anderson School District Five on September 16, 2026, for on-site HVAC filter replacement services across 18 district facilities. The contract is for an initial one-year term with four optional one-year renewals. Bids are due by October 1, 2026, at 10:00 am EST. The document includes submission instructions, offeror information forms, and a scope of work requiring labor for filter removal and replacement.
PDF
PDF, Low priorityother
LowAI Summary for 123419-d12b3b45-8178-4054-a745-3366255e8706.pdf: The provided document content does not contain procurement-specific information and appears to be a generic instruction or placeholder text.
PDF
PDF, Low priorityother
LowAI Summary for 502 Pearman Dairy Rd Anderson SC parcel reference: A brief property/location reference listing an address at 502 Pearman Dairy Rd, Anderson, SC 29625, along with nearby street names and numeric parcel-like identifiers. No procurement, solicitation, contract, or award content is evident.
PDF
PDF, Low priorityother
LowAI Summary for 508 Pearman Dairy Rd, Anderson, SC 29625: Document lists a property location at 508 Pearman Dairy Rd, Anderson, SC 29625, notes 7 houses/structures, and includes several parcel or reference numbers. It also mentions rearward parking. No solicitation, contract, amendment, or procurement instructions are evident.
PDF
PDF, Low priority39 pages · strategic-plan
LowAI Summary for Anderson District Five Strategic Plan 2023-24 to 2027-28: This document is the Anderson District Five Strategic Plan for the school years 2023-24 through 2027-28, initially planned on September 15, 2022. It includes the district's mission, vision, beliefs about student learning, demographic data for the 2022-23 school year, and required state components such as the School Renewal Plan Signature Page, Assurances, Stakeholders Involvement, and Goals and Action Plans. The plan aligns with South Carolina state education requirements and includes signatures from key district officials affirming compliance and stakeholder participation.
PDF
PDF, Low priority2 pages · contract-calendar
LowAI Summary for Anderson School District Five 2026-2027 Contract Calendar: This document is the 2026-2027 contract calendar for Anderson School District Five, detailing the working days and contract periods for various personnel categories including district office staff, principals, custodians, and certified personnel. It includes monthly calendars from July 2026 through June 2027, highlighting district and school closure days, contract start and end dates, and specific notes on working days for different employee groups. The calendar serves as a scheduling and contract reference for the school district's staff for the academic year.
PDF
PDF, Low priority1 page · other
LowAI Summary for Anderson School District Five Directory: Directory for Anderson School District Five listing early childhood, elementary, middle, high school, and non-traditional program locations with addresses, phone numbers, and school hours. Includes district office contact information, board of trustees, superintendent, mission statement, and a non-discrimination notice.
PDF
PDF, Low priorityother
LowAI Summary for Anderson School District Five Grading Practices Update (August 2026): August 2026 parent/guardian notice from Anderson School District Five explaining changes to South Carolina grading practices for the 2026-2027 school year. It describes elimination of required grading floors, how grades will reflect actual performance, credit recovery and assignment completion expectations, restrictions on counting certain formative and benchmark assessments toward course grades, and continued academic supports. The document includes both English and Spanish versions.
PDF
PDF, Low priority1 page · other
LowAI Summary for Anderson School District Five Middle School Supply List: Middle school supply list for Anderson School District Five covering Glenview Middle School, McCants Middle School, Robert Anderson Middle School, and Southwood Academy of the Arts. The document lists required, school-specific, and optional classroom supplies for the first day of school, including notebooks, pencils, pens, folders, earbuds, and related items.
PDF
PDF, Low priorityspecifications
LowAI Summary for Comprehensive Asbestos Inspection Report - 2526 Getsinger Road: An asbestos inspection report dated August 8, 2024, for a property located at 2526 Getsinger Road, Anderson, SC, conducted by Crossroads Environmental, LLC for Anderson County School District #5. The report identifies various asbestos-containing materials (ACM) including drywall, vinyl flooring, window glaze, and transite siding, and provides regulatory recommendations for abatement and air monitoring.
PDF
PDF, Low priorityother
LowAI Summary for Getsinger Rd property list with parcel numbers: Document appears to be a simple property/location listing for 2526 Getsinger Rd, Anderson, SC 29625, noting 3 houses/structures, parcel numbers 1230301003 through 1230301006, and references to Pool 1 and Pool 2. No solicitation, contract, amendment, or procurement instructions are shown.
PDF
PDF, Low priorityspecifications
LowAI Summary for Limited Asbestos Inspection Report - Varennes Elementary School: A limited asbestos inspection report dated August 5, 2026, prepared by Crossroads Environmental, LLC for Anderson School District #5. The report details the sampling of pipe insulation (black mastic) at Varennes Elementary School, confirming the presence of asbestos (>1%) in the sampled material (HA01). It includes laboratory analysis results from Eurofins Built Environment Testing and provides regulatory recommendations for the removal of non-friable materials.
PDF
PDF, Low priority2 pages · application-form
LowAI Summary for Option 1 Homeschool Annual Application - Anderson School District Five: This document is the Option 1 Homeschool Annual Application for Anderson School District Five. It is to be completed by the parent or legal guardian responsible for the student's home instruction for the school year. The application includes sections on eligibility to teach, instructional requirements such as courses to be taught, instructional day and year, record keeping, place of instruction, and library access. It also contains consent statements regarding statewide testing, assessment, and compliance with state laws and district policies. The form requires signatures from the parent or guardian and a school district reviewer, along with dates and approval information.
PDF
PDF, Low priorityother
LowAI Summary for Phase I Environmental Site Assessment - 502 & 508 Pearman Dairy Road: Phase I Environmental Site Assessment report for 502 & 508 Pearman Dairy Road, Anderson, SC, issued July 2, 2025 by HRP Associates, Inc. for Anderson School District Five. The report documents site history, reconnaissance, environmental records and historical reviews, interviews, data gaps, findings, and conclusions. Key observations include multiple parcels with vacant and occupied structures, septic systems, reported abandoned wells, and no observed hazardous substance storage.
PDF
PDF, Low priorityother
LowAI Summary for Phase I Environmental Site Assessment Report - 2526 Getsinger Road: Phase I Environmental Site Assessment report for 2526 Getsinger Road, Anderson, SC, prepared for Anderson School District Five by HRP Associates, Inc. Issued March 29, 2024 following a March 12, 2024 inspection. The report summarizes site history, property description, interviews, records review, and findings under ASTM E1527-21. It identifies the subject property, existing structures, utility and septic/well information, surrounding land use, and concludes no recognized environmental conditions, controlled recognized environmental conditions, historical recognized environmental conditions, de minimis conditions, or significant data gaps.
PDF
PDF, Low priority1 page · specifications
LowAI Summary for Plat of Two Tracts of Land - 500 & 502 Pearman Dairy Road: A land survey plat prepared by Ridgewater Engineering & Surveying for School District Number Five of Anderson County, South Carolina. The document details two tracts of land totaling 13.14 gross acres located at 500 & 502 Pearman Dairy Road, including boundary measurements, TMS numbers, and property markers.
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
PhaseSolicitation
Posted
Solicitation
Response Deadline
Submission deadline
Response Deadline
Ready to pursue this opportunity?
Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.
Organization & Contact Information
Show more
AgencySouth Carolina → Anderson School District Five
Anderson School District Five would like to contract with a vendor to Remove and Replace All Pipe Insulation on Existing Overhead Chilled Water Piping at Varennes Elementary. See solicitation for additional details.