Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Government of Canada was posted on May 15, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Remplacement de tabliers de ponts en bois 2026

Closed
20144388International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
SLED
Call 010 B1CBA2602088-0
Solicitation # B1CBA2602088-0
Solicitation B1CBA2602088-0, issued by the Georgia Department of Transportation (GADOT), involves the widening and reconstruction of 0.284 miles of SR 124 (Braselton Hwy) at Hamilton Mill Road and Hamilton Mill Parkway in Gwinnett, Georgia. The project scope requires the contractor to provide all machinery, tools, and materials necessary to add an additional lane, with a scheduled completion date of July 31, 2028. Key deliverables include an ITS Project Management Plan, staging and temporary traffic control plans, and as-built plans. The work must adhere to the 2021 Standard Specifications and 2024 Supplemental Specifications, with specific technical requirements for micropiles, asphalt mix designs, and ITS hardware. The contract is subject to various federal and state regulations, including the Davis-Bacon Act for labor standards, the Buy America preference for steel and iron, and the Americans with Disabilities Act (ADA). Compliance with nondiscrimination and equal opportunity laws is mandatory, and contractors must certify they are not debarred or suspended via SAM.gov. While the required Disadvantaged Business Enterprise (DBE) goal is set at 0%, the contract maintains strict inspection and acceptance criteria, with final acceptance contingent upon the receipt and transfer of all warranties to GADOT. Proposals must be submitted using the Proposal Schedule of Items and remain valid for thirty calendar days following the opening date.
GADOT

POSTED

about 3 hours ago

DEADLINE

in about 10 hours
NAICS: 237310
New
SLED
Call 009 B1CBA2601755-0
Solicitation # B1CBA2601755-0
Solicitation B1CBA2601755-0, issued by the Georgia Department of Transportation (GDOT), is for a construction project in Fulton County involving 3.087 miles of milling and plant mix resurfacing on SR 70, extending from east of the Cedar Branch Creek bridge to east of SR 154. The scope of work includes traffic control, recycled asphalt concrete patching and superpave, tack coat application, asphalt pavement milling, and the installation of white and yellow wet weather thermoplastic traffic stripes and various raised pavement markers. The complete contract is scheduled for completion by July 31, 2027, with a bid opening date of August 21, 2026. The contract is subject to stringent federal and state regulations, including the Davis-Bacon Act for labor standards, 49 CFR Part 26 for Disadvantaged Business Enterprise (DBE) participation, and Title VI of the Civil Rights Act of 1964. Bidders must submit a Request For Eligibility To Bid by noon the day preceding the letting to be eligible. Award eligibility is based on bidder responsibility and responsiveness, with a requirement to submit supporting documentation within three working days following the bid opening. Compliance with these certifications and the submission of weekly certified payrolls are mandatory, as breaches of these stipulations may result in the withholding of progress or final payments.
GADOT

POSTED

about 3 hours ago

DEADLINE

in about 6 hours
NAICS: 237310
New
SLED
Call 012 B1CBA2602578-0
Solicitation # B1CBA2602578-0
The Georgia Department of Transportation (GDOT) is soliciting proposals for project M006688, which involves 4.390 miles of milling, inlay, and plant mix resurfacing on SR 31, extending from the south end of the I-16/SR 404 bridge to SR 26 in Laurens County. The scope of work includes extensive pavement activities such as recycled asphalt concrete patching and Superpave application, as well as the installation of various thermoplastic and reflective pavement markings and raised markers. Additionally, the contract incorporates Intelligent Transportation Systems (ITS) specifications, requiring the delivery of NEMA TS 4 compliant LED display matrices, IP-based CCTV cameras, wireless communication systems, and mobile Environmental Sensor Stations (ESS). The contract is scheduled for completion by July 31, 2027, with a specific 60-calendar day timeframe associated with the completion of paving operations. Compliance with federal and state regulations is mandatory, including the Davis-Bacon Act, the Americans with Disabilities Act, and Georgia's E-Verify requirements. Quality standards are strictly enforced, requiring ISO 9001 or Six Sigma certification and third-party laboratory testing for ITS equipment. Acceptance is contingent upon a field test and a minimum 30-day burn-in period. Bidders must submit eligibility forms to the GDOT Office of Construction Bidding Administration by 12:00 p.m. the day preceding the August 21, 2026, letting date to avoid being rendered non-responsive.
GADOT

POSTED

about 3 hours ago

DEADLINE

in about 6 hours
NAICS: 237310
New
SLED
Call 005 B1CBA2602556-0
Solicitation # B1CBA2602556-0
The Georgia Department of Transportation is soliciting bids for the construction of a roundabout at the intersection of US 41/SR 247 and Anthony Road (CR 5104 and CR 5481) in Bibb County, with a contract completion deadline of March 31, 2029. The project involves comprehensive roadway construction including grading, base and pavement installation with recycled asphalt concrete, curb and gutter placement, storm drainage systems, sanitary sewer and force main modifications, temporary and permanent traffic control, and installation of various traffic control devices including thermoplastic striping and raised pavement markers. Advanced transportation systems are also part of the scope, requiring installation of ESS environmental and pavement sensors, a wireless communications network supporting PtP, PtMP, and repeater configurations, and a sliding gate system with EAG mechanical components. All materials must meet strict specifications, including delivery in labeled 50-pound containers, proper preservation and handling of reinforcement steel, and end-cap protection for cable ends. The project adheres to multiple regulatory standards, including USDA, ASTM, AWWA, ANSI, GDOT Utility Accommodation Policy, and Georgia EPD guidelines, with precise acceptance criteria for micropiles, ride quality, and bridge bearing elevations. Contract compliance is governed by federal and state requirements including Davis-Bacon prevailing wage regulations, Buy America mandates for all permanently installed materials, and strict non-discrimination provisions under Title VI of the Civil Rights Act, ADA, and equal employment opportunity laws. The contractor must submit a 5% proposal guaranty and a state-approved contract bond to ensure work completion and material quality. DBE participation requirements apply if a goal is set, necessitating submission of proposed DBE participants with the bid. Prompt payment clauses mandate that subcontractors be paid within ten calendar days of the prime contractor’s receipt of payment, and all bids must include certifications addressing debarment status, lobbying activity, boycott of Israel prohibitions under Georgia law, non-collusion, and sexual harassment prevention. Payment for materials is tied to e-Ticket documentation, and as-built plans, GPS coordinates, and an ITS Project Management Plan must be submitted within 30 days of installation completion. Bids must be submitted by August 21, 2026, to the Georgia DOT bidding office in Atlanta, and failure to satisfy any certification or regulatory requirement renders a bid non-responsive.
GADOT

POSTED

about 3 hours ago

DEADLINE

in about 10 hours

AI Contract Overview

Show more

La Municipalité de Morin-Heights invite les soumissionnaires à présenter des offres pour le remplacement des tabliers de ponts en bois sur son territoire, avec une échéance fixed à l’été 2026. Les soumissions, en deux exemplaires sous enveloppes opaques et scellées marquées « Remplacement de tabliers de ponts en bois 2026 », doivent être déposées physiquement à l’hôtel de ville ou via le site SEAO, avec une garantie de soumission de 10 % sous forme de chèque visé ou de cautionnement, ce dernier étant obligatoire pour les soumissions déposées en ligne. L’ouverture des soumissions aura lieu publiquement le 1er juin 2026 à 11h00, après la date limite de dépôt fixée à 10h45 du même jour. Toute entreprise soumissionnaire est tenue de fournir une déclaration solennelle assermentée par un commissaire à l’assermentation, signée et initialisée par le soumissionnaire, sous peine de rejet automatique de son offre. La municipalité se réserve le droit de ne pas accepter la soumission la plus basse ou toute autre soumission, sans aucune obligation envers les soumissionnaires. Toute demande de clarification doit être adressée par écrit à l’adresse courriel spécifiée. L’appel d’offres est identifié sous le numéro 20144388 et relève du code NAICS 237310, bien que l’organisme soit une municipalité locale, l’information publique le classifie à tort sous l’entité fédérale.

General Info

Morin-Heights seeks sealed bids for wooden bridge deck replacement by June 1, 2026, 10:45 AM.

Agency

Government of Canada → Municipalité de Morin-Heights .View Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Laurentides, CAN

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → Municipalité de Morin-Heights .
Contacts1 person available
OfficeN/A
Organization / Agency
Government of Canada → Municipalité de Morin-Heights .
View Agency Profile
Office AddressN/A
Contacts
Aubé PierreContracting Authority

Full Description

Show more
La Municipalité de Morin-Heights demande des soumissions pour le remplacement des tabliers de ponts en bois situés sur le territoire de la Municipalité de Morin-Heights, à l’été 2026. Les soumissions, en deux copies, sous enveloppes opaques et scellée, portant la mention « Remplacement de tabliers de ponts en bois 2026 » seront reçues au plus tard à 10h45, le 1er juin 2026, selon la façon suivante : Physiquement à l’Hôtel de Ville de Morin‑Heights, 567, chemin du Village, Morin‑Heights, Québec, J0R 1H0 avec chèque visé de 10%, représentant le dépôt de soumission, incluant les taxes. Une garantie sous forme de cautionnement peut également être acceptée. Ou Via le site internet de SEAO. Dans ce cas, seules les soumissions avec garantie de soumission sou forme de cautionnement seront acceptées. Les soumissionnaires pourront choisir l’une ou l’autre des méthodes de remise de la soumission Les soumissions, présentées dans des enveloppes scellées, devront parvenir à l’adresse indiquée ci-dessous avant l’heure prévue, où elles seront ouvertes publiquement. Me Geneviève Beaudry-Boudreault Hôtel de Ville, 567, ch. du Village, Morin-Heights, Québec, J0R 1H0 'Remplacement de tabliers de ponts en bois 2026' - Appel d'offres 2026-11 Ouverture des soumissions le: Lundi, 1er juin 2026 à 11h00 *Lors du dépôt de sa soumission, l’entreprise ou le fournisseur s’engage à produire par écrit une Déclaration solennelle du soumissionnaire et doit la faire assermenter par un commissaire à l’assermentation. Il est entendu que le défaut (i) de fournir la Déclaration solennelle du soumissionnaire (déclaration d’intégrité) selon l’article 13 de la Loi sur les contrats des organismes municipaux (LRQ, ch. 65.01) ou (ii) l’absence des initiales et de la signature du soumissionnaire sur celle-ci entraînera le rejet de la soumission. La Municipalité ne s’engage à accepter ni la plus basse, ni aucune des soumissions reçues et cela sans encourir aucune obligation quelconque envers le ou les soumissionnaires. Pour toutes questions relatives à cet appel d’offre et à son devis, veuillez les adresser, par écrit, à l’adresse courriel suivante : appeldoffres@morinheights.com Le Service du Greffe