Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Rengstorff Avenue Grade Separation Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Rengstorff Avenue Grade Separation Project, managed by the Peninsula Corridor Joint Powers Board in Mountain View, California, aims to enhance public safety and traffic circulation by eliminating the at-grade railroad crossing at Rengstorff Avenue. The project involves lowering Rengstorff Avenue and its intersection with Central Expressway to approximately 22 feet below ground level and constructing a 120-foot-long rail bridge to carry Caltrain tracks over the roadway. To accommodate these changes, the two existing Caltrain tracks will be slightly realigned to the south. As part of the infrastructure changes, the existing intersections of Leland Avenue and Crisanto Avenue with Rengstorff Avenue will be closed. Access will be maintained via a new connector roadway for Leland Avenue, including a replacement parking lot for the La Plaza Market. Crisanto Avenue will be converted into a cul-de-sac, and a new pedestrian overcrossing with ADA-compliant ramps will be installed to ensure continued east-west connectivity. Additionally, the project will incorporate cycle tracks, landscaped buffers, new bike lanes on Central Expressway, and various retaining walls to support the excavation.

General Info

Rengstorff Avenue project replaces at-grade rail crossing with a bridge and road realignment.

Agency

California → Peninsula Corridor Joint Powers Board

NAICS

N/A

Place of Performance

Caltrain corridor and Central Expressway; Rengstorff Avenue, Mountain View, CA

Set-Aside

NONE

Documents

(1)

Caltrain NOE Rengstorff Avenue Grade Separation Project 2026 OCR

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Peninsula Corridor Joint Powers Board
Contacts1 person available
OfficeN/A
Organization / Agency
California → Peninsula Corridor Joint Powers Board
Office AddressN/A
Contacts
Michael TauchenDeputy Director, Environmental Compliance

Full Description

Show more
The Rengstorff Avenue Grade Separation Project spans a t-shaped area formed by Rengstorff Avenue and the Caltrain corridor. Along the Caltrain corridor and the adjacent Central expressway, the Project extends from a point north of Escuela Avenue to a point approximately adjacent to Ortega Avenue, and along Rengstorff Avenue the Project extends approximately 650 feet to the north and approximately 600 feet to the south of the rail corridor. Rengstorff Avenue is a critical north-south route between U.S. Highway 101 and El Camino Real that also serves as a gateway to the technology companies located near the bay to the north of the railroad tracks. The purpose of and need for the Project is to: (1) improve public safety by eliminating the existing at-grade railroad crossing at Rengstorff Avenue; and (2) improve traffic circulation and emergency response time, and to reduce queuing caused by the frequent rail traffic. The Project will involve lowering Rengstorff Avenue and its intersection with Central Expressway (County Route G6), which runs parallel to and north of the Caltrain tracks. The low point of Rengstorff Avenue under the railroad tracks will be approximately 22 feet below existing ground level. The Project will reconstruct and slightly realign the two existing Caltrain tracks by approximately five feet to the south, but the two tracks will remain at their current elevation. A 120-foot-long rail bridge will be constructed to carry the tracks over the lowered Rengstorff Avenue. The existing Leland Avenue and Crisanto Avenue intersections with Rengstorff Avenue, on the south side of the Caltrain train tracks, will be closed due to the proposed lowering of Rengstorff Avenue. A connector roadway will be constructed to maintain access between Rengstorff Avenue and Leland Avenue immediately south of its current location. The Leland Avenue connector roadway will be located along west side of Rengstorff Avenue and connect with Rengstorff Avenue approximately 270 feet south of the existing intersection. A new parking lot will be provided along the Leland Avenue connector roadway to provide 1:1 replacement of existing parking at the La Plaza Market parking lot that is impacted by the project. Crisanto Avenue will be terminated with a cul-de-sac east of Rengstorff Avenue. A new pedestrian overcrossing will be constructed across the lowered Rengstorff Avenue at Crisanto Avenue to maintain east/west pedestrian/bicycle access between Crisanto Avenue and Leland Avenue that would otherwise cross the existing intersection. Stairs and Americans with Disabilities Act (ADA) compliant ramps will connect the pedestrian overcrossing with Rengstorff Avenue. Rengstorff Avenue will include cycle tracks and a landscaped buffer between the roadway and flanking sidewalks. Designated bike lanes would be added to Central Expressway approaching the Rengstorff Avenue intersection. The Project will include several retaining walls and landscaped terraces to provide support for excavation along the lowered portion of roadways.