Renovate 20052 & 30219
Active
FA8601-11-B-0004FederalContract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
General Info
Place of Performance
WPAFB, OH, 45433, USASet-Aside
SBA
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
2 updates
PhasePresolicitation
Organization & Contact Information
Show more
AgencyDepartment Of Defense → FA8601 Aflcmc Pzio
Contacts2 people available
OfficeWRIGHT PATTERSON AFB, OH, 45433-5344, USA
Organization / AgencyDepartment Of Defense → FA8601 Aflcmc Pzio
Office AddressWRIGHT PATTERSON AFB, OH, 45433-5344, USA
Contacts
Full Description
Show more
***NOTICE: The procurement method for this effort hase changed from IFB to RFP. As a result, all future activity relating to this procurement action will take place on the package with solicitation #, FA8601-11-R-0116. That package is currently classified as a "Solicitation". All parties desiring to receive future communication regarding this procurement action should add themselves to the Interested Parties list for that procurement action.*** Synopsis/ Presolicitation: FA8601-11-R-0116 Sources Sought notice published under Projects ZHTV100034, ZHTV100061, ZHTV100062, ZHTV100063 on 20 May 2011 This notice is posted in accordance with FAR 5.2 and 36.213-2. This RESTRICTED ACQUISITION is set aside for prime contractors who are certified Small Business concerns. In order to qualify for this program, an offeror must be a Small Business concern for the below-cited NAICS code. The NAICS code is 236220 and the Size Standard is $33.5M. In accordance with FAR 4.1102 and DFARS 252.204-7004 "Required Central Contractor Registration," Contractor must be registered in CCR prior to award. Registration may be accomplished at http://www.ccr.gov. SOLICITATION NUMBER: FA8601-11-R-0116. The work involves four phases which include: Phase 1 - ZHTV100061: Work involves the comprehensive interior renovation and partial exterior restoration of a historic building. Exterior restoration includes original windows and main entry and limestone pediments. The interior renovation involves the gutting of 2nd and 3rd floors, while maintaining the operation of the 1st floor and its occupants, as well as the building entry and path of egress, stair towers and elevator. The project includes the replacement of the HVAC and plumbing systems for the majority of the building, while maintaining the existing HVAC and plumbing in an operational status for the remaining portion of the building. Some temporary HVAC will be required during the construction effort. The project also includes the replacement of most of the electrical distribution system, including panelboards. Phase 2 - ZHTV100034: Work involves the conversion of 1st floor administrative space into a pair of restrooms and break room, as well as the reconfiguration of the north end of the 1st floor and partial 2nd and 3rd floor spaces. Work also involves the conversion of non-secure work spaces into physical and acoustically secure work spaces. Phase 3 - ZHTV100062: Work involves the comprehensive interior renovation of a historic building. The interior renovation involves the partial gutting of 2nd floor area, while maintaining the operation of the 1st floor and its occupants, as well as the building entry and path of egress, stair towers and elevator. The project includes the replacement of the HVAC and plumbing systems for the majority of the building, while maintaining the existing HVAC and plumbing in an operational status for the remaining portion of the building. Some temporary HVAC will be required during the construction effort. The project also includes the replacement of most of the electrical distribution system, including panelboards. Phase 4 - ZHTV100063: Work involves the comprehensive interior renovation of a historic building. The interior renovation involves the gutting of 1st floor area, while maintaining the operation of the 1st floor and its occupants, as well as the building entry and path of egress, stair towers and elevator. The project includes the replacement of the HVAC and plumbing systems for the majority of the building, while maintaining the existing HVAC and plumbing in an operational status for the remaining portion of the building. Some temporary HVAC will be required during the construction effort. The project also includes the replacement of most of the electrical distribution system, including panelboards. Total Estimated Completion time for this entire project is 451 Calendar Days, including: Phase 1 - ZHTV100061: Both phases start on Day 1 and allow 240 Calendar Days Phase 3 - ZHTV 100062: for Construction (Complete Day 240) Then Allow 30 Calendar Days for AFAA (Bldg 20052 and Bldg 10280) to move into Fac 30219 (Complete Day 270) Phase 2 - ZHTV100034: Start on Day 271 and allow 180 Calendar Days for Construction (Complete Day 451) Phase 4 - ZHTV100063: Start on Day 271 and allow 180 days for Construction (Complete Day 451) Total Contract: 451 Calendar Days The estimated magnitude of the entire contract is between $1,000,000 and $5,000,000. NOTES: 1. The solicitation with the official specifications and drawings will be available on the World Wide Web on or about 18 August 2011, at http://www.fbo.gov , The tentative date for receipt of bids is 19 September 2011. The period of performance is 451 days. 2. Hard copies of the solicitation will not be provided. You may, however, download and print the file from the web site www.fbo.gov. 3. There is no fee for this solicitation. 4. A registration page will be attached to the web site. You are not required to register. However, when you register, you will receive notice of any amendments and/or addenda that may be issued to the solicitation. If you have not registered, it will be your responsibility to check the web site for any changes to the solicitation. 5. You shall provide a signed copy of the SF 1442 at the time and place specified in the solicitation for receipt of bids. There will be a public opening. Sealed envelopes containing bids shall be marked to show the offeror's name and address, the solicitation number, and the date and time bids are due. 6. Contractors shall be capable of securing bonding for the total proposed amount (base plus options). However, contractors shall only be responsible for providing bonding for the base amount plus the amount of any and all options exercised at the time of award. If an option is exercised after award, contractors shall be responsible for securing the additional bonding equal to the amount of the option. 7. Contractors that are Debarred, Suspended, or Proposed for Debarment are excluded from receiving contracts. Agencies also shall not consent to subcontract with these contractors. 9. The Government reserves the right to cancel this solicitation either before or after the closing date. This is a WPAFB Construction Contracting (PKOC) program. The current status is Synopsis/ Pre-Solicitation and it is a Category Z - Maintenance, repair, and alteration of real property program.
Similar Contracts
Same NAICS industry code
More opportunities from Department Of Defense → FA8601 Aflcmc Pzio
Same awarding agency
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
