This Solicitation opportunity from United States Government Publishing Office was posted on March 11, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
National Archives and Records Administration (NARA) 4TH FLOOR Renovation Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The National Archives and Records Administration (NARA) 4th Floor Renovation Project involves comprehensive interior construction and renovation work on partial space located on the 4th floor of Building A at the Government Publishing Office's main campus in Washington, DC. The project requires full demolition, structural modifications, and installation of mechanical, electrical, plumbing, and fire protection systems, along with architectural finishes in accordance with detailed Architectural and Engineering (A&E) design specifications. The renovation covers approximately 33,514 square feet and includes mixed occupancy types such as storage, mechanical, electrical, and business spaces. Compliance with various codes and standards—such as the 2017 DC Building Code, International Building Code (IBC), multiple NFPA standards, ADA requirements, OSHA regulations, and specific federal guidelines—is mandatory. The contractor is responsible for furnishing labor, materials, equipment, supervision, and full execution of the work, including protection of existing building systems and handling hazardous materials when encountered. The solicitation (040ADV-26-R-0016), issued by the United States Government Publishing Office Acquisition Services, is soliciting firm fixed-price sealed bids due by May 12, 2026, with performance expected to be completed within 540 calendar days after notice to proceed, roughly spanning 18 months. Key contract requirements include strict quality assurance/control, warranties including a one-year workmanship warranty and a twenty-year warranty on No Detectable Lead (NDL) systems, and compliance with a comprehensive Statement of Work. Special contract conditions mandate the designation of key personnel such as a project manager, superintendent, and safety and quality control leads, all subject to qualifications. Security protocols require contractor personnel to wear GPO Visitor badges and have escorted access. Hazardous materials abatement financial responsibilities rest fully with the contractor, along with immediate notification of any such discoveries. Logistics include delivery of materials to the GPO loading dock at 44 H Street NW, Washington DC, with the contractor accountable for transporting goods to the work site. The contractor must submit progress reports, testing documentation, as-built drawings, and permitting documentation. The Government will conduct all final inspections onsite with acceptance contingent upon satisfactory completion and punch list closure, supervised by the Contracting Officer’s Representative. Notably, the contract documentation does not formally include FAR clauses, evaluation factors for award, socioeconomic representations, or contract value estimates, focusing primarily on performance-based requirements and technical compliance.
General Info
Place of Performance
Washington, DC, 20401, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
The Agency Support Operations Business Unit for the Government Publishing Office (GPO) requires the construction and renovation of the National Archives and Records Administration (NARA) office occupying partial space on the 4th floor of Building A at the agency’s main campus, located in Washington DC. The successful offeror will develop a complete proposal utilizing a detailed Statement of Work (SOW) and government-provided drawings.
The Contractor will provide the labor, material, equipment, and supervision required for the construction and renovation aligned with the Architectural and Engineering (A&E) Design Specifications. This project includes demolition, structural modifications, installation of mechanical, electrical, and plumbing (MEP) systems, fire protection measures, and interior finishes to enhance functionality and compliance with all applicable regulations and standards.
More opportunities from United States Government Publishing Office → Acquisition Services
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
