Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Ohio was posted on August 10, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Renovation at JFK High School - Welding Lab

Closed
ITB-21448State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, located in California with a specific performance area in Riverside or Los Angeles, focuses on basin improvements under NAICS code 236220. The solicitation was posted on October 19, 2026, with a response deadline of November 4, 2026. This opportunity is specifically set aside for Disadvantaged Business Enterprises (DBE) as defined by the Department of Transportation. To secure project financing, the Inland Empire Utilities Agency requires strict adherence to expanded DBE Good Faith Effort (GFE) guidelines. Bidders must provide proof of utilizing SBA and MBDA services and demonstrate that solicitations were posted in an online publication for 30 consecutive days and in a newspaper for at least one day prior to the bid opening. Failure to include this documentation within the bid package will result in the proposal being deemed non-responsive. While outreach documentation may be submitted up to three business days after the closing date, all other mandatory GFE requirements must be met by the opening date to ensure compliance.
RT CONTRACTOR CORP

POSTED

about 8 hours ago

DEADLINE

in 15 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the development of a 12,920 square foot multi-story steel frame laboratory and office facility, as well as an optional 17,978 square foot laboratory facility. Construction features include shallow foundations, metal standing seam roofs, and exterior walls composed of masonry and metal panels. The scope of work encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, and the installation of underground stormwater retention and utility systems. Additionally, the project requires the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide array of trades, including demolition, abatement, concrete, masonry, structural and miscellaneous metals, millwork, roofing, drywall, flooring, painting, elevator installation, fire protection, plumbing, mechanical, electrical, sitework, and crane services. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid invitations and documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 8 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of a new 2.0 million gallons per day facility located on the northeast end of Walnut Avenue in Greenfield, California. The project scope is divided into four distinct phases: site preparation involving soil stabilization and utility relocation; construction of the plant including a packaged Membrane Bioreactor treatment plant, headworks, UV disinfection, and SCADA systems; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension. The total duration for the project is 915 calendar days, with a critical requirement to maintain existing plant services and regulatory compliance throughout the first two phases. Managed by C. Overaa & Co., the solicitation is open to various small and disadvantaged business enterprises, including DBE, SDVOSB, and WOSB. A significant local hiring goal requires that 50 percent of the total construction workforce be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic system for invoicing and payments and are required to accept the standard Overaa agreement without modification. Key milestones include a mandatory pre-bid meeting on October 5, 2026, with bid submission deadlines listed as either October 28 or November 10, 2026.
C. Overaa & Co.

POSTED

about 8 hours ago

DEADLINE

in 21 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
This solicitation issued by J & J Contractors, Inc. seeks pricing for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. The project has a duration of 1828 calendar days and involves the construction of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes comprehensive site work such as clearing, rock excavation, grading, and wetland mitigation, as well as the construction of an Ordnance Operations building, a Truck Inspection area, and a Sentry building. Demolition of 18 existing magazines and buildings 524 and 393 is also required. Technical requirements encompass a wide range of trades including demolition, abatement, concrete, structural steel, roofing, electrical, plumbing, and mechanical systems. Specialized construction features include rigid inclusions, load transfer mats, grounding and lightning protection, and intrusion detection systems. The project also involves installing primary and secondary electrical distribution, telecommunications infrastructure, access roads, and landscaping. This opportunity is set aside for various small business categories, and interested parties must contact the primary point of contact by the October 31, 2026, deadline to receive bid documents.
J & J Contractors, Inc

POSTED

about 8 hours ago

DEADLINE

in 11 days

AI Contract Overview

Show more

The Cleveland Metropolitan School District has issued Invitation for Bid ITB-21448 for the renovation of the welding laboratory at JFK High School, located at 15111 Miles Ave., Cleveland, Ohio. The project involves converting four existing spaces, including two art classrooms and two office spaces (Rooms 125, 126, 127, and 156), into a state-of-the-art facility to support the Metallurgy pathway. This Career and Technical Education program focuses on high-demand skills in Gas Metal Arc Welding, Shielded Metal Arc Welding, Gas Tungsten Arc Welding, and Flux Cored Arc Welding. The scope of work encompasses comprehensive construction services, including electrical, mechanical, plumbing, structural, technology, carpentry, drywall, and casework installations. Bids must be submitted electronically via the district's e-Procurement Portal by 2:00 pm on September 9, 2026. To be considered responsive, submissions must include a transmittal cover letter on business letterhead, a bid cost form with state certification, completed district forms, and a bid guaranty consisting of a bid bond or a certified check for 10 percent of the total bid amount. The contract will be awarded to the lowest responsive and responsible bidder. The selected contractor must provide significant insurance coverage, including 2 million dollars for both Commercial General Liability and Automobile Liability, and must adhere to Davis-Bacon Act requirements and certified payroll reporting. Additionally, all on-site personnel must pass background checks and wear identification badges.

General Info

JFK High School renovates second welding lab for Metallurgy pathway with modern welding training in Cleveland.

Documents

24

102800 Toilet, Bath, and Laundry Accessories - JFK High School Welding Lab Build-Out

PDF, High priority: read this firstspecifications
High

2601-2 Addendum 06 - JFK High School Welding Lab Build-Out

PDF, High priority: read this firstamendment
High

A-621 Door Schedule

PDF, High priority: read this firstsow
High

Construction Bid Sheet - John F. Kennedy High School Welding Lab Renovation

PDF, High priority: read this firstrfq
High

E-101 First Floor Lighting Plan

PDF, High priority: read this firstspecifications
High

E-511 Power Details and Diagrams

PDF, High priority: read this firstspecifications
High

E-601 Electrical One Line Diagram - Normal Distribution

PDF, High priority: read this firstspecifications
High

ITB-21448 Renovation at JFK High School - Welding Lab

PDF, High priority: read this firstitb
High

ITB-21448 Renovation at JFK High School - Welding Lab

PDF, High priority: read this first21 pages · itb
High

ITB-21448 Renovation at JFK High School Welding Lab

PDF, High priority: read this first21 pages · itb
High

ITB 21448 - Renovation at JFK High School Welding Lab

PDF, High priority: read this first21 pages · itb
High

JFK High School Welding Lab Build-Out - Table of Contents

PDF, High priority: read this firstsow
High

JFKHS Welding Lab Bid Sheet

DOCX, High priority: read this first1 page · rfq
High

P-501 Plumbing Details, Schedules and Isometrics

PDF, High priority: read this firstspecifications
High

Project 26012 First Floor Power Plan - Enlarged

PDF, High priority: read this firstspecifications
High

A-101 First Floor Plan

PDF, Low priorityspecifications
Low

Disqualifying Offenses for Licensed Employees 2025

PDF, Low priorityother
Low

Firestone Roof Limited Warranty No. 700387214

PDF, Low prioritywarranty
Low

AD-101_-_DEMOLITION_FIRST_FLOOR_PLAN.pdf

PDF

Architectural.zip

ZIP

E-701_-_ELECTRICAL_SCHEDULES.pdf

PDF

Mechanical.zip

ZIP

Plumbing.zip

ZIP

Structural.zip

ZIP

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyOhio → Capital Projects
Contacts2 people available
OfficeCleveland, OH, 44114, USA
Organization / AgencyOhio → Capital Projects
Office AddressCleveland, OH, 44114, USA
Contacts
Hollie DellisantiExecutive Director of Architectural Services
Leigh PrattPurchasing Analyst

Full Description

Show more
JFKHS was constructed in 2020. The new welding lab will be the second in the district. The Welding Fabrication concentration within the Metallurgy pathway prepares students for highdemand careers in metalworking, manufacturing, and construction. Through courses such as Gas Metal Arc Welding, Shielded Metal Arc Welding, Gas Tungsten Arc Welding, and Flux Cored Arc Welding, this hands-on CTE program teaches the essential skills of welding and fabrication, combining technical precision with craftsmanship to create and repair metal structures and components. METALLURGY PATHWAY • Gas Metal Arc Welding: Students will use the Gas Metal Arc Welding process (GMAW) to safely join various types of metal. • Shielded Metal Arc Welding: Focuses on stick welding techniques, teaching students how to join and repair metals using electric current and electrodes. • Gas Tungsten Arc Welding: Covers TIG welding, a precise method used for high-quality welds on metals like aluminum and stainless steel. • Flux Cored Arc Welding: Students will be able to use the Flux Cored Arc Welding process (FCAW) to safely join various types of metal.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS