Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Homeland Security was posted on December 6, 2011. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Repair Basement Wall

Closed
HSCG30-12-P-PCV011Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 423320
New
SLED
IFB 161298 - Delivered Aggregate Petersburg Res
Solicitation # 161298
The Virginia Department of Transportation is soliciting bids under IFB 161298 for qualified firms to furnish, deliver, and stockpile various types of aggregate on an as-needed, on-call basis. The contract supports the Petersburg Residency of the Richmond District, with deliveries required at the Church Road, McKenney, Prince George, Nottoway, Dinwiddie Bridge, and Jennings Ordinary Area Headquarters. The nonrenewable contract period is set for one year, beginning December 20, 2026. All materials must be priced F.O.B. destination and measured in short tons, adhering to Section 109 of the 2020 Road and Bridge Specifications. Delivery acceptance occurs Monday through Friday from 7:00 AM to 3:00 PM, and contractors must maintain adequate stock to ensure prompt service, including during inclement weather. Awards will be made on a line-item basis to the lowest responsive and responsible bidder. Bidders must submit their proposals via the eVA portal by November 5, 2026, at 9:00 AM EST, using the official state form and including required attachments such as the VA State Corporation Commission Form, Quarry Source of Material, and Normal and Emergency Contacts. A Small Business Subcontracting Plan is mandatory for bidders not certified as small businesses by the DSBSD. Payment is processed via check, ACH, EDI, or P-Card within 30 days of a valid invoice. The contract is governed by the laws of the Commonwealth of Virginia and incorporates the Commonwealth of Virginia Vendors Manual.
Virginia Department of Transportation

POSTED

about 9 hours ago

DEADLINE

in 16 days
NAICS: 423320
SLED
Supply or Supply and Deliver Rock Material
Solicitation # 27-PW-27
Yavapai County Public Works is soliciting bids under solicitation 27-PW-27 for the supply and optional delivery of various rock materials, including driveway rock, drain rock, and various diameter rocks ranging from one inch to three feet minus, as well as ABC-type material. The contract is awarded to the lowest responsible and responsive bidder, with the possibility of a single or multiple awards subject to the approval of the County Board of Supervisors. Materials must conform to MAG Section 701 and be sourced from approved providers to ensure they are durable, hard, and resistant to abrasion. Acceptance is based on visual inspection of stockpiles by the County, with additional sampling by an engineer as needed. The contract term begins December 1, 2026, for one year, with the option for four additional one-year extensions. Pricing is based on plant pick-up per ton and delivery rates per mile, provided as F.O.B. Destination. Payment terms are net 45 days following the submission of detailed invoices and a current IRS W-9. Contractors must comply with Arizona State Executive Orders regarding non-discrimination, the Americans with Disabilities Act, and all OSHA and EPA regulations. Additionally, awarded contractors are required to register for the County's Electronic Funds Transfer program within one month of the effective date to avoid payment suspension.
Public Works

POSTED

7 days ago

DEADLINE

in 9 days

General Info

NAICS

423320 - Brick, Stone, and Related Construction Material Merchant Wholesalers

Place of Performance

734 BLACKTHORN DR., CHEBOYGAN, MI, 18618, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Combined Synopsis

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Homeland Security → Base CLEVELAND(00030)
Contacts2 people available
OfficeCLEVELAND, OH, 44199, USA
Office AddressCLEVELAND, OH, 44199, USA
Contacts
SCOTT S. HUTTONSTOREKEEPER FIRST CLASS

Full Description

Show more
USCG CHEBOYGAN HOUSING 734 BLACKTHORN DR. CEU Cleveland Work Order 33-12-3003 - Cheboygan Housing Basement Leak PART 1 PROJECT DESCRIPTION 1.1 The Coast Guard requires a contractor fully qualified within the field of Excavation, Pipefitting, and Foundation Repair. Contractor is to provide all labor, materials and equipment necessary to repair crack on the foundation below the Northwest Basement Window of unit 734 Blackthorn. PART 2 SCHEDULING 2.1 All work will be conducted on Monday through Friday between the hours of 7:30 a.m. through 4:00 p.m. PART 3 SURFACE PREPARATION 3.1 Contractor is required to contact Miss Dig Prior to any excavation work to mark potential electrical and or gas lines in vicinity. . Contractor is to excavate existing grass and earth from below NW window at unit 734 Blackthorn all the way down to the foundation floor. Grass and Earth should be removed as to not cave in on workers. French drain runoff water system is in vicinity of the area being dug. Contractor is to remove existing French drain system during excavation. Removal of existing window well will be required to seal the crack. 3.2 Exterior wall and cracked surface is to be cleaned using pressure washer or other suitable method as to remove any contaminates from foundation wall before attempting to seal. Interior wall is to be cleaned using best source possible. Contractor is to then use hydraulic cement or a repair material that is better or equivalent to fill both the interior and exterior of the crack on the foundation wall. Once foundation crack has been sealed and set, contractor is to us a troll mastic system / Foundation coating to cover exposed foundation due to excavation operations. Foundation coating should cover past foundation crack facing east and west at a minimum of 2 feet to ensure a proper seal has been applied. Contractor is to then use either PVC, Heavy gauge plastic, or a material best suited for a foundation water barrier. A termination bar or similar is to be installed at the top of the chosen material. Once the material has been installed, a second coat of foundation coating is to be applied to all sheeting edges of the material to completely seal the repaired foundation crack. Contractor is to then install new window well to extend past frost/freeze level of ground. 3.3 French Drainage system using 3 inch drain lines as a minimum is to be installed back into excavated area with drain leading away from foundation. If current roadway drainage system lines in close vicinity are accessible this will be the preferred method of drainage for the system to be repaired upon re-installation. Basement window well is to have a drain line and cover plate installed and tied into either the new French Drain or the roadway drainage. Contractor will conduct Drainage test to ensure all connections are satisfactory prior to backfilling under inspection / review of a Coast Guard Representative. 3.4 Contractor is to fill excavated area and window well with like earth and slope grade away from house so that standing water will not pool next to the foundation. Contractor is to ensure backfill has been packed down to ensure no future sink holes or grade deteriorations. As a minimum, 1 foot outside of window well is to be Black Dirt / Top Soil fill. 3.5 Contractor will be required to replace grass, and repair any damages to grounds or surrounding property. Due to the timeframe of this project, sod will be the preferred choice of ground cover installation. If sod is unavailable, grass seed is to be used and covered with straw to prevent predation from animals. PART 4 MATERIALS 4.1 Government furnished materials: The Coast Guard will not provide any materials. The contractor shall supply all materials. 4.2 Contractor Supplied Materials: The contractor shall provide all materials necessary for a timely completion of the job. PART 5 APPLICATION 5.1 Follow all State and Local Construction Codes. PART 6 CLEAN UP 6.1 Contractor shall ensure all areas where equipment and work is being conducted are left in a clean and orderly condition. 6.2 Upon completion a local Coast Guard representative will inspect all work and cleanup of the area. PART 7 CONTRACTOR PERFORMANCE SPECIFICATIONS 7.1 All work shall be accomplished in a professional manner and in strict adherence to current manufacturer standards and recommendations. 7.2 Contractor shall adhere to current codes, ordinances and OSHA safety regulations at all times. PART 8 QUALITY ASSURANCE 8.1 Any work that does not meet the approval of the U.S Coast Guard contracting representative shall be immediately corrected. Unsatisfactory work shall be redone at the contractor expense. PART 9 LIABLITY INSURANCE 9.1 It is the responsibility of the contractor to provide their own liability insurance for contractor and employees. In no case will the Coast Guard assume liability for bodily injury or property damage to the contractor and/or employees. COST Estimated cost is $10,000.00 SOURCE OF SUPPLY To be determined by BSD Cleveland.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS