Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on January 10, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Repair Drainage and Outfalls

Closed
A045136Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the installation of 16,435 linear feet of 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station. Key deliverables include the construction of a new wet well and valve vault, the installation of pumps, a generator, odor control equipment, mechanical and electrical systems, and the demolition of existing pumps and piping. The project also encompasses site improvements such as stormwater facilities, fencing, and various paving and restoration activities. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with specific requirements for the submission of a Good Faith Efforts Form and Table A to meet MBE/WBE participation goals of 10.9 percent for the EPA and 10 percent for the State of North Carolina. Performance and payment bonds, as well as proof of insurance, are required. The project is managed by Willis Engineers, and the contractor will be subject to liquidated damages of 1,000 dollars per day for failure to achieve substantial completion. Payment is processed via Applications for Payment, with funds becoming due 30 days after presentation to the owner. All work must adhere to strict quality standards, including AWWA Specification C-600 for pipelines and NEMA standards for motors.
Don Moorhead Construction, Inc.

POSTED

about 5 hours ago

DEADLINE

in 21 days

General Info

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

Malmstrom AFB, MT, 59402, USA

Set-Aside

SBA

Documents

2

FA4626-XX-X-XXXX Repair Drainage and Outfalls Construction Drawings

PDF, High priority: read this firstspecifications
High

FA4626-XX-X-XXXX Repair Drainage and Outfalls (NZAS 11-1014)

PDF, High priority: read this firstspecifications
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA4626 341 Cons Lgc
Contacts2 people available
OfficeMALMSTROM AFB, MT, 59402-6863, USA
Office AddressMALMSTROM AFB, MT, 59402-6863, USA

Full Description

Show more
This project consists of replacement and repair of storm drainage related facilities at stormwater outfalls number 1, 2, 3, 4, and 6. Items of work include remove and replace 194 LF 60 culverts, 89 LF 30 culverts, and 42 LF 42 culverts, bore and jack 83 LF 36 culvert, open cut 37 LF 36 RCP culvert, open cut 45 LF 30 RCP culvert, remove and replace a concrete flow control structure, remove and replace concrete headwalls, install steel access platforms, install miscellaneous concrete structures, install 3 EA 60 sluice gates, remove and replace 9 motorized sluice gate actuators and controls, install riprap bank protection, install outside area lighting, extend buried power to outfall 4, and directional drill power circuit under a roadway. Associated tasks required to complete the work include complying with wetlands protection requirements, traffic control, pavement removal and replacement, exploratory excavation, utility crossings, and site restoration. These improvements are located on Malmstrom Air Force Base, Montana. This is not a solicitation as the Government intends to use this information for business type decisions on the final solicitation product. The Government is looking to identify interested small business concerns, to include 8(a), HUBZone, Woman Owned Small Business (WOSB), and Service-Disabled Veteran Owned Business (SDVOSB) to serve in the capacity of a - Prime contractor and have the capability to accomplish the requirements identified above. All responses must also include a statement that the company holds all required certifications and licenses to perform this type of work or can obtain them prior to award of a contract especially in the State of Montana.

More opportunities from Department Of Defense → FA4626 341 Cons Lgc

Same awarding agency

NAICS: 562111
New
Federal
FY27 Base Refuse
Solicitation # MALMSTROM_BASE_REFUSE
The 341st Contracting Squadron at Malmstrom Air Force Base, Montana, is conducting market research via a Sources Sought notice to identify capable commercial vendors for base-wide integrated solid waste management collection and recycling services. This requirements contract, categorized under NAICS code 562111, involves the weekly collection and disposal of municipal solid waste and recycling, the provision of 10-yard containers for concrete and asphalt debris, and the management of waste containers for special events. The government is specifically seeking to determine if the acquisition can be set aside for small businesses, with a strong emphasis on 8(a), HUBZone, SDVOSB, and WOSB concerns. The contractor will be responsible for providing all necessary personnel, equipment, and supervision, and must obtain a Class D motor carrier certificate per Montana state law. Key performance requirements include responding to unscheduled pickups within one business day and adhering to strict safety and regulatory standards, including OSHA and FAR 52.222-50 regarding combating trafficking in persons. Performance will be monitored by the Contracting Officer or Representative through task validation, report reviews, and customer complaint investigations. Interested vendors must submit a capability statement outlining their business size status and operational experience by October 26, 2026.
Solid Waste Collection

POSTED

about 23 hours ago

DEADLINE

in 6 days
View Details
NAICS: 236220
Federal
Vertical Construction Multiple Award Contract (MAC)
Solicitation # FA4626-26-R-0007
The Vertical Construction Multiple Award Contract (MAC) is an indefinite-delivery indefinite-quantity (IDIQ) vehicle established by the 341st Contracting Squadron to provide design-bid-build and design-build services for military renovation and construction projects. The scope primarily supports Malmstrom Air Force Base, including its Launch Facilities, Missile Alert Facilities, and Weapons Storage Area in Montana. Work includes the repair, renovation, alteration, and demolition of vertical structures and critical building systems such as HVAC, plumbing, electrical, and fire suppression. The contract is a total small business set-aside under NAICS code 236220, with an estimated overall ceiling of 99,999,999.99 and an aggregate capacity not exceeding 50,000,000. The government intends to award approximately eight contracts with individual task order values ranging from 2,000 to 3,000,000. The contract structure consists of a five-year initial ordering period with a two-year option, allowing for a total potential duration of seven years. An initial seed project is planned for the DSN/CSN Repair Bldg. 1082 HVAC project at Malmstrom AFB, which involves developing conceptual courses of action for backup cooling and humidification, progressing to a 100 percent Type B design. The seed project has a performance period of 242 calendar days from the notice to proceed, with construction beginning after the acceptance of the 65 percent design. Inspection and acceptance will be conducted by the government at the destination sites within Montana.
Commercial and Institutional Building Construction

POSTED

about 2 months ago

DEADLINE

N/A
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS