Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on September 19, 2009. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Repair Multiple Fire Suppression Systems

Awarded
FA4417-09-R-0037Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity is specifically set aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation, with a response deadline of November 4, 2026. The project falls under NAICS code 236220 and focuses on basin improvements within the Riverside or Los Angeles project areas. A critical component of this solicitation is strict adherence to six Good Faith Effort (GFE) requirements designed to ensure DBE participation and secure project financing. Bidders must provide proof of GFE #2, which requires posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for one day, as well as proof of GFE #5, involving the utilization of the Small Business Administration (SBA) and the Minority Business Development Agency (MBDA). Failure to submit documentation for these two specific efforts within the bid package will result in the proposal being deemed non-responsive. Additionally, outreach documentation for GFE #1 may be submitted up to three business days after the bid closing date.
RT CONTRACTOR CORP

POSTED

about 6 hours ago

DEADLINE

in 15 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the development of a 12,920 square foot multi-story steel frame laboratory and office facility, as well as an optional 17,978 square foot laboratory facility. Construction features include shallow foundations, metal standing seam roofs, and exterior walls composed of masonry and metal panels. The scope of work encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, and the installation of underground stormwater retention and utility systems. Additionally, the project requires the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide array of trades, including demolition, abatement, concrete, masonry, structural and miscellaneous metals, millwork, roofing, drywall, flooring, painting, elevator installation, fire protection, plumbing, mechanical, electrical, sitework, and crane services. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid invitations and documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 6 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of a new 2.0 million gallons per day facility located on the northeast end of Walnut Avenue in Greenfield, California. The project scope is divided into four distinct phases: site preparation involving soil stabilization and utility relocation; construction of the plant including a packaged Membrane Bioreactor treatment plant, headworks, UV disinfection, and SCADA systems; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension. The total duration for the project is 915 calendar days, with a critical requirement to maintain existing plant services and regulatory compliance throughout the first two phases. Managed by C. Overaa & Co., the solicitation is open to various small and disadvantaged business enterprises, including DBE, SDVOSB, and WOSB. A significant local hiring goal requires that 50 percent of the total construction workforce be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic system for invoicing and payments and are required to accept the standard Overaa agreement without modification. Key milestones include a mandatory pre-bid meeting on October 5, 2026, with bid submission deadlines listed as either October 28 or November 10, 2026.
C. Overaa & Co.

POSTED

about 6 hours ago

DEADLINE

in 21 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
This solicitation issued by J & J Contractors, Inc. seeks pricing for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. The project has a duration of 1828 calendar days and involves the construction of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes comprehensive site work such as clearing, rock excavation, grading, and wetland mitigation, as well as the construction of an Ordnance Operations building, a Truck Inspection area, and a Sentry building. Demolition of 18 existing magazines and buildings 524 and 393 is also required. Technical requirements encompass a wide range of trades including demolition, abatement, concrete, structural steel, roofing, electrical, plumbing, and mechanical systems. Specialized construction features include rigid inclusions, load transfer mats, grounding and lightning protection, and intrusion detection systems. The project also involves installing primary and secondary electrical distribution, telecommunications infrastructure, access roads, and landscaping. This opportunity is set aside for various small business categories, and interested parties must contact the primary point of contact by the October 31, 2026, deadline to receive bid documents.
J & J Contractors, Inc

POSTED

about 6 hours ago

DEADLINE

in 11 days

AI Contract Overview

Show more

This project involves correcting fire suppression and fire alarm deficiencies across several base hangars at Hurlburt Field, Florida, to ensure compliance with ETL 98-8 and UFC 3-600-02 standards. The scope of work includes replacing overhead sprinkler heads, fire alarm devices, and under wing oscillating monitors, as well as installing new hangar door switches and a high expansion foam system in one hangar. Additionally, the contractor will replace diesel driven fire pumps with electric driven pumps, modify associated piping, install mass notification systems, and perform structural modifications including raising a ceiling and installing new walls and doors. This is a HUBZone set-aside, single-award, Firm-Fixed-Price contract with an estimated value between 1 million and 5 million dollars. The performance period is 320 calendar days, and the award will be determined based on a Price Performance Trade-Off to ensure the best value to the government. Prospective bidders must be registered in the Central Contractor Registration Database and provide bid bonds with their proposals, followed by payment and performance bonds within ten days of the award.

General Info

Contract Value

$1,204,360.5

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

Hurlburt Field AFB, HURLBURT FIELD, FL, 32544, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

10 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

Response deadline time changed from 10:00 PM UTC to 9:00 PM UTC on Aug 18, 2009. The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA4417 1 Socons
Contacts2 people available
OfficeHURLBURT FIELD, FL, 32544-5810, USA
Office AddressHURLBURT FIELD, FL, 32544-5810, USA
Contacts
Gail E SpeirContract Specialist
Monique PelletierContracting Officer

Full Description

Show more
Work consists of, but is not limited to the following: The contractor shall furnish all labor, materials, tools, supervision, equipment, and perform all operations necessary to accomplish all work complete in place, as shown on the drawings, specified in the specification, or as needed to correct fire suppression and fire alarm deficiencies in several base hangars to comply with ETL 98-8 and perform maintenance and testing in accordance with UFC 3-600-02. The work to be performed includes, but is not limited to, removing and reinstalling bird netting as required to replace overhead sprinkler heads and other fire suppression system components and piping; removing, replacing and installing new fire alarm devices; replacing overhead sprinkler heads; installing new hangar door switches; modifying power connects to existing hangar doors; replacing existing under wing oscillating monitors with multiple fixed wing nozzles; replacing diesel driven fire pumps at one hangar with new electric driven pumps; modifying existing fire pump piping; installing new fire alarms and mass notification; installing level controls and monitoring equipment at water storage tanks; installing high expansion foam system in one hangar; and raising ceiling and installing new walls and doors in one hangar. The work shall be fully complete in accordance with the contract documents. Hurlburt Field is an Air Force installation that is located in the Florida Panhandle mid-way between Panama City, Florida and Pensacola, Florida. This acquisition is a HUBZone set aside. The North American Industry Classification System (NAICS) code for this project is 236220 with a size standard of $33.5M.. This contract will be a - Price Performance Trade-Off contract; award will be made based on the - Best Value to the Government in accordance with FAR 15.101. The Government reserves the right to award a contract to other than the low proposed price. Performance period is 320 calendar days. The estimated magnitude for this project is between $1,000,000.00 and $5,000,000.00. Bid bonds will be required with the proposal. Payment and performance bonds will be required within ten days of contract award. The work is required in support of the 1st Special Operations Civil Engineer Squadron. A site visit will be scheduled approximately 15 days from the solicitation issue date. The contract will be a single award, Firm-Fixed-Price type contract. Prospective contractors must be registered in the Central Contractor Registration Database prior to award of a government contract. Offerors are further advised that failure to register in the DOD Central Registration Database will render your firm ineligible for award. Registration requires applicants to have a DUNS number. Recommend registering immediately in order to be eligible for timely award. This solicitation will be available ONLY via the Internet at the following address: http://www.fbo.gov. For information on how to register your company on FBO, to view or receive updates and notifications to the solicitation, please reference the FBO Vendor Guide located on the FBO website home page. NO paper copies will be furnished.

More opportunities from Department Of Defense → FA4417 1 Socons

Same awarding agency

NAICS: 238210
Federal
Utility Disconnection and CappingThe contract requires the safe disconnection and capping of all utility lines—including electrical, water, gas, and sewer—that serve the building prior to its demolition. This work must be performed in strict compliance with safety standards to prevent hazards during and after the disconnection process, ensuring no residual pressure, power, or flow remains in any system. All procedures must follow industry best practices and regulatory requirements to protect workers, the environment, and surrounding infrastructure. The work is classified under NAICS code 238210, which pertains to plumbing, heating, and air-conditioning contractors, indicating the specialized nature of the tasks involved. This is a total small business set-aside subcontract, meaning only entities certified as small businesses under the SBA’s guidelines are eligible to bid. The contract was posted on May 5, 2026, and the place of performance is located in the zip code 32544 under the oversight of the Department of Defense, specifically the FA4417 1 Socons office. The nature of the work requires precision and expertise in utility system shutdown protocols, and all activities must be completed within a timeframe that aligns with the broader demolition schedule. Though no point of contact is listed, potential bidders can access further details through the provided SAM.gov link.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

6 months ago

DEADLINE

N/A
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS