Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

REPAIRS TO BILLETING BQ STORAGE, F-355

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Department Of The Navy → Navfac Far EastView Agency

NAICS

N/A

Place of Performance

USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Navy → Navfac Far East
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of The Navy → Navfac Far East
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Project will replace metal roof panels, zee purlins; repair exterior wall panels, corroded exterior double sliding doors and fire alarm control panel/alarm system. Additional scope of works include the following: 1] Replace the entire roof and wall panels, ridge cap, roof ventilators, portion of zee purlins and girts, roof edge and corner flashings and trims, stainless gutter and downspouts, sliding metal door assemblies and accessories/ hardware, plexi-glass windows including expanded metal window grilles with angle framings, louvers ay, door ay, door and window type a/c stainless canopy, vinyl floor tiles and cove base, ceiling system, 2] Replace crossmain and branch line piping including fittings, pipe support/hanger, brackets and all required accessories, 3] Replace sprinkler system riser assembly including valves, fittings, and all required accessories, 4] Remove and replace the affected electrical items on propose refurbishing works; (32-ea) ceiling mounted fluorescent lighting fixtures, (2-ea) lighting switches including wires, conduits, fitting, hanger, support and hardware, (2-ea) panelboards, (1-ea) safety switch & (1-ea) pull box.