Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

REPAIRS TO POL PIER, F-427

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This project involves comprehensive structural and electrical repairs to POL Pier F-427, managed by Navfac Far East for the Department of the Navy. The structural scope focuses on restoring the integrity of the pier through the replacement of corroded steel pipe railings, ladders, and hangers, as well as extensive concrete remediation. This includes repairing pile encasements with exposed reinforcement, fixing delaminations in the concrete deck soffits and curbs, and addressing spalls at Bent 2 on the trestle. Additionally, the project requires upgrading the personnel shelter and replacing three wooden platform assemblies, including all associated metal and wooden support structures, decks, stairs, and handrails. The electrical and utility components of the contract involve significant upgrades to the pier's power and lighting systems. Work includes replacing the electrical panel, conduit, and wiring for rectifiers 35 through 40, and the removal and re-installation of rectifiers 35 through 43. The scope also covers the installation of ten mooring cleats and one 100-pound capacity bollard. Further improvements include the replacement of damaged conduit and wiring, as well as the installation of a new light pole complete with grounding and updated electrical connections.

General Info

Structural and electrical repairs to POL Pier F-427 for the Department of the Navy.

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Navy → Navfac Far East
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
The scope of work of the project are (1) Replace corroded steel pipe railings (2) Repair pile encasements with exposed reinforcement (3) Repair delaminations in pile encasements, concrete deck soffits and concrete curb. (4) Repair spalls at Bent 2 on the trestle, and in concrete deck soffit. (5) Replace severely corroded and missing hangers (6) Replace corroded ladders. (7)Upgrade POL Pier personnel shelter. (8) Replace existing three wooden platform assemblies for electrical panel and rectifiers including all metal and wooden support structures, deteriorated timber decks, wooden stair and handrails; (9) Replace existing electrical panel, conduit and wirings for rectifier #s 35, 36, 37, 38, 39 and 40; (10) Remove and re-install existing rectifier #s 35, 36, 37, 38, 39, 40, 41, 42 and 43, including 10-each mooring cleats and 1-each 100-lb capacity bollard. 11.) Replacement of corroded / damaged conduit & wires. 12.) Replacement of light pole, to include new wiring, conduit and grounding. SE revised to include the scope of QC9021: REPLACE OLD WIRINGS, CONDUITS AND LIGHT POLES, F-427 and QC2073: REPLACE WOODEN PLATFORMS, ELECTRICAL SYSTEM AND MOORING CLEATS AT POL PIER F-427 as per email dated 07/09/2025

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
C26863031 CASWELL MEMORIAL STATE PARK - Campground and Day Use Improvements
Solicitation # C26863031
The California Department of Parks and Recreation is soliciting bids for contract C26863031 to upgrade the campground and day use areas at Caswell Memorial State Park in San Joaquin County. This lump sum project, with an engineer's estimate between 4.2 million and 5.8 million dollars, requires the contractor to provide all labor, materials, and equipment to perform work including asphalt demolition, clear and grub operations, and AC overlay. The project must be completed within 365 calendar days from the notice to proceed, with a maximum of 30 days allocated for punch list items and final completion. Eligible bidders must hold a Class A and/or B license and be registered with the Department of Industrial Relations per SB 854. Award is based on the low price method, though incentives are provided for Disabled Veteran Business Enterprise participation exceeding the mandatory 6 percent goal, subject to a 100,000 dollar cap. Certified small businesses may also receive a 5 percent preference. Bids must be submitted electronically in PDF format to the designated email address by the specified deadline. The contractor is responsible for adhering to local prevailing wage rates, ADA compliance, and strict material storage and labeling standards. Quality control will be managed through on-site inspections, required testing logs, and the use of approved mockups to establish aesthetic and workmanship standards.
California Department of Parks & Recreation

POSTED

about 3 hours ago

DEADLINE

in 27 days
View Details
NAICS: 237990
New
SLED
Seminole Boat Ramp
Solicitation # 26-0075-MA
The City of Clearwater is soliciting bids for the Seminole Boat Ramp Restoration project in Clearwater, Florida. The scope of work involves the comprehensive repair and reconstruction of eight launching ramps across four bays, designed to accommodate vessels exceeding 35 feet and weighing over 10 tons. Key project activities include the demolition of existing concrete structures, dredging and grading of native soils, placement of various gravel fills, and the installation of new concrete ramps using either a precast slab system or pour-in-place solution. Additionally, the contractor is responsible for the temporary relocation and re-anchoring of floating docks to ensure ADA-compliant travel, the installation of articulated concrete mattresses for scour protection, and the implementation of strict environmental controls, including turbidity curtains and stormwater pollution prevention plans. Bidders must be pre-qualified in Marine Construction for at least 750,000 dollars and provide a bid security deposit equal to 10 percent of their maximum bid price. The project must be completed within 180 calendar days from the Notice to Proceed, with a hard deadline for full public restoration by February 15, 2027. To minimize public disruption, the contract limits the simultaneous closure of all four ramps to a maximum of 45 calendar days. Performance will be verified through third-party topographic surveys, with acceptance based on post-grading soundings compared to the design template. Progress payments will be prorated monthly based on the physical percentage of project completion.
Public Works

POSTED

about 6 hours ago

DEADLINE

in 21 days
View Details

More opportunities from Department Of The Navy → Navfac Far East

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS