This Solicitation opportunity from California was posted on June 22, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Replace bridge fender system and skirt modification.
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract pertains to the replacement of the bridge fender system and skirt modification on the west span of the San Francisco-Oakland Bay Bridge, specifically between 2.0 miles west of Yerba Buena Tunnel and the tunnel itself, within the City and County of San Francisco. The work involves fabrication, assembly, and installation of an upper fender system comprising rubber fender units of leg type, Fiber Reinforced Polymer (FRP) panels with stainless steel plates and UHMW polyethylene pads, anchors, and hardware to connect these components to pier concrete skirts. The project is governed by Caltrans Standard Specifications with supplemental Special Provisions that align with the main section headings and establish revised requirements for materials, construction methods, and testing. Key deliverables include shop drawings, certificates of compliance, safety data sheets, manufacturer instructions, and performance verification test reports for the rubber fender units, all subject to strict technical compliance. The contract mandates adherence to stringent quality standards, including design verification and witness panel testing for FRP walers, splice plates, and panels, with defined mechanical properties such as ultimate flexural strength, shear strength, tensile and compression modulus, and pin bearing resistance. Rubber fender units must meet minimum deflection and energy absorption thresholds under load testing. Welding must comply with AWS D1.6, and all concrete must conform to specific Caltrans sections, while hot mix asphalt follows Section 39-2. The contract includes Buy America/Build America compliance requirements, with penalties for failure to submit required documentation. Contractors must submit certified payroll records via LCPtracker Pro, adhere to DVBE and small business subcontracting preferences, and provide a qualified safety representative with Cal/OSHA credentials, three years of heavy construction experience, and valid first aid certification. Bidders are required to attend a mandatory pre-bid meeting and job site visit, with only two designated representatives permitted; failure to attend disqualifies a bid. Bids must be submitted electronically via Bid Express by 2:00 p.m. on August 5, 2026, with bidder’s security equal to at least 10% of the bid amount, and award will go to the lowest responsible bidder. Contractors must pay subcontractors within seven days of receiving progress payments and material suppliers within 30 days, with monthly reporting through the Department’s prompt payment monitoring system. Project administration is managed by Caltrans District 4 personnel, with weekly progress reporting, time adjustment tracking, and dispute resolution protocols requiring RFI submissions
General Info
Agency
NAICS
Place of Performance
San Francisco, CA, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
More opportunities from California Department of Transportation
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS
