This Sources Sought opportunity from Department Of Defense was posted on April 15, 2013. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Replace Natural Gas Line Along 8th Street

Closed
FA8601-13-B-0005Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237120
New
Federal
DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan
Solicitation # W912HV26RA009
Solicitation W912HV26RA009, titled DESC2103C - Bulk Fuel Storage Tanks Phase II, is a construction project at Yokota Air Base, Japan, issued by the USACE Japan Engineer District. The project involves the construction of one 100,000-barrel cut-and-cover JP-8 storage tank featuring a reinforced concrete pump house with four 600-gpm issue vertical turbine pumps and one 50-gpm water draw-off pump. The scope includes the installation of a product saver tank, piping, valves, and vaults connecting to an existing filter separator building, as well as the integration of an automatic tank gauging system and control systems into the existing PLC and HMI infrastructure. The estimated project magnitude is between 7.5 and 15 billion Yen, with a performance period of 1,020 calendar days after the Notice to Proceed. This solicitation is restricted to local sources in Japan and utilizes the Lowest Price Technically Acceptable (LPTA) source selection process. To be eligible, offerors must be rated as acceptable in construction experience, system supplier subcontractor experience, and past performance. Specifically, prime contractors must demonstrate experience with fuel facility construction exceeding 1 billion JPY within the last 20 years. Proposals are due by January 25, 2027, and must be submitted via PIEE. The contract includes a priority rating of DO-C2 and specifies liquidated damages of 615,000 Yen per calendar day of delay. Compliance with EM 385-1-1 March 2024 safety procedures and the submission of a Contractor Quality Control Plan are mandatory requirements.
W2SN Endist Japan

POSTED

about 23 hours ago

DEADLINE

in 3 months
NAICS: 237120
New
SLED
Kiefer Landfill Gas Utilization Project
Solicitation # PLER2024-00137
Kiefer Landfill Generating III, LLC is proposing to develop a renewable natural gas facility at the Kiefer Landfill in Sacramento County with a production capacity of 8,000 standard cubic feet per minute. The project will capture and process landfill gas to remove moisture and impurities, upgrading it to pipeline-quality methane that meets air quality standards. A new pipeline will be constructed to transport the purified gas to existing Pacific Gas & Electric infrastructure, with two proposed routes both beginning at the landfill and traveling northwest along Kiefer Boulevard before turning north along Sunrise Boulevard to terminate near the intersection of Sunrise Boulevard and Douglas Road. Depending on the selected route, the pipeline will connect to PG&E’s system via either a compressor station or a metering and regulating station located near designated property parcels on Douglas Road. The pipeline alignment is planned to utilize public rights-of-way and existing private easements to minimize land use impacts. The project is being managed under Sacramento County’s oversight, with environmental coordination handled by Julie Newton, and key stakeholders including applicant Andrew Petric of NextEra Energy and Project Manager Kathalyn Tung of MBaker International. The initiative is part of broader efforts to advance renewable energy by converting landfill emissions into usable natural gas, supporting regional decarbonization goals. The facility and pipeline will be sited entirely within Sacramento County, with the final interconnection point targeting PG&E’s distribution or transmission system in the 95683 zip code area. The project was posted as a forecast on June 11, 2026, and is currently undergoing environmental review under California’s CEQA process, with no set-aside or NAICS classifications provided at this stage.
Sacramento County

POSTED

4 days ago

DEADLINE

N/A
NAICS: 237120
New
SLED
Threemile Slough Pipeline Crossings Remediation and Decommissioning ProjectThe Threemile Slough Pipeline Crossings Remediation and Decommissioning Project, led by the California State Lands Commission for Pacific Gas and Electric Company, involves the remediation of active natural gas pipelines L-131Y and L-131Z to address shallow burial depths and the decommissioning and removal of two previously abandoned pipelines. Located in Rio Vista, Sacramento County, the project scope encompasses area preparation, pipeline remediation and removal, and post-construction restoration. Work is scheduled for a three-month window from August 1 through October 31, 2026, to protect special-status fish species, with a possible extension to November 30 upon authorization from the National Marine Fisheries Service. The project is subject to extensive environmental and regulatory oversight, including the California Environmental Quality Act, the Clean Water Act, and the Rivers and Harbors Act. Key compliance requirements include the identification of 3.51 acres of federal jurisdictional waters, the management of asbestos-containing materials through certified testing and approved disposal, and the implementation of a Mitigation Monitoring Program to address impacts on air quality, biological resources, and cultural sites. Safety and operational standards mandate adherence to Cal/OSHA regulations, the Lempert-Keene-Seastrand Oil Spill Prevention and Response Act, and technical standards from ASME, NACE, and ANSI. Hazardous materials must be stored in dedicated staging areas with secondary containment capable of holding 110 percent of the largest container's volume.
California State Lands Commission

POSTED

4 days ago

DEADLINE

N/A
NAICS: 237120
SLED
D-2027-03 (INSTALLATION AND ABANDONMENT OF NATURAL GAS MAIN, SERVICES AND ALL APPURTENANCES AND RELATED PAVING)
Solicitation # 36009
Philadelphia Gas Works is seeking sealed bids from qualified contractors for the installation and abandonment of natural gas mains, services, and all appurtenances, including related paving restoration, for a project located within the city of Philadelphia at 5800 Lindbergh Blvd and 2300-2500 S 58th St. The scope of work involves excavating, replacing, upgrading, and abandoning underground gas distribution systems in accordance with PGW Distribution Standards and PennDOT specifications for pavement and traffic markings. The contract will be awarded to the lowest responsive and responsible bidder based on price, performance history, financial standing, and compliance with DBE participation goals. Bids are due by October 29, 2026, at 12:00 PM and must be submitted via the pgw.procureware.com portal as searchable PDF files. The contractor is required to provide performance and payment bonds for 100 percent of the contract amount and maintain comprehensive insurance coverage, including a 20 million dollar umbrella liability policy and specific pollution liability if hazardous waste is handled. Administrative requirements include electronic invoicing via PayMode, submission of certified payroll forms, and a five percent retainage until substantial completion. Contractors must also adhere to strict safety standards, including OSHA compliance, drug and alcohol programs, and the notification of the Pennsylvania One Call System prior to excavation. Final acceptance of the work is determined by the date finished on the authorized representative's report.
Philadelphia Gas Works

POSTED

12 days ago

DEADLINE

in 9 days
NAICS: 237120
SLED
D-2027-04 (INSTALLATION AND ABANDONMENT OF NATURAL GAS MAIN, SERVICES AND ALL APPURTENANCES AND RELATED PAVING)
Solicitation # 36010
Philadelphia Gas Works is seeking sealed bids from qualified contractors for the installation, replacement, and abandonment of natural gas mains, services, and all associated appurtenances, including related paving restoration. The project is specifically located at 4500-4700 Chestnut Street within the city of Philadelphia. The scope of work includes all excavation and upgrading of the underground gas distribution system, with a requirement that all mains be tested at a minimum pressure of 90 psig with air for 24 hours. Contractors are responsible for restoring all paving removed during the project and must adhere to strict operational requirements, such as reopening closed streets daily and using Jersey barriers near SEPTA station entrances. The contract will be awarded to the lowest responsive and responsible bidder based on price, technical and operational capability, financial standing, and a history of meeting DBE participation goals. Bidders must submit a complete package via the procurement portal by October 29, 2026, including a price list, demographic survey, certificate of non-indebtedness, and a performance schedule. Required security includes a performance bond equal to 100 percent of the contract amount and a payment bond. The project is subject to prevailing wage rates and requires compliance with federal and local anti-discrimination laws. All invoicing must be handled electronically through the specified PGW accounts payable process.
Philadelphia Gas Works

POSTED

12 days ago

DEADLINE

in 9 days

General Info

NAICS

237120 - Oil and Gas Pipeline and Related Structures Construction

Place of Performance

Wright-Patterson AFB, OH, 45433, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA8601 Aflcmc Pzio
Contacts1 person available
OfficeWRIGHT PATTERSON AFB, OH, 45433-5344, USA
Office AddressWRIGHT PATTERSON AFB, OH, 45433-5344, USA
Contacts
Gabrielle Sherer

Full Description

Show more
The Air Force is seeking sources for a potential 100 percent set-aside for Small Business, HUBZone, Economically Disadvantaged Woman Owned Small Business (EDWOSB), or Service Disabled Veteran Owned Small Business (SDVOSB) concerns. IF ADEQUATE RESPONSES ARE NOT RECEIVED, THE ACQUISITION MAY BE SOLICITED ON AN UNRESTRICTED BASIS. This is a sources sought for planing purposes only. Replace 2800' of 3", 4", and 6" poly gas line. This is a 40 psi natural gas supply. Requires experience in installing natural gas lines. Work requires coordination with affected occupants and scheduled work to include maintenance and office activities. The Air Force intends to award a contract with a 120 day period of performance. The estimated magnitude of the entire contract is between $250,000 and $500,000. NAICS Code: 237120 Size Standard: $33.5M Prime contractors who are Small Business, HUBZone, EDWOSB, or SDVOSB and who intend to submit a bid for this solicitation are highly encouraged to submit the follwoing by 3:00 p.m. (local Dayton time) on 30 April 2013 to: AFLCMC/PZIOCA, ATTN: Gabrielle Sherer, via Fax: 937-257-2825 or E-mail: gabrielle.sherer@wpafb.af.mil. Responses should include the following: (1) a positive statement of your intention to submit a bid for this solicitation as a Prime Contractor (2) date of HUBZone certification; and/or (3) documentation of SDVOSB status; and/or (4) EDWOSB must provide information IAW Federal Acquisition Regulation 19.1503; and (5) listing of capabilities and/or experience in work similar in type and scope to include contract numbers, project titles, dollar amounts, points of contact with their phone numbers, and an explanation of the relevancy of the project (limit to 5 single-sided pages); (6) documentation from surety or their agent of your capability to be bonded for bid, performance and payment bonds for this project; (7) If you are a HUBZone considering a joint venture that has not been formalized, you will need to specify the firm(s) you intend to partner with and how you plan to officially form the joint venture. Firms interested should provide the above documentation. Fax or e-mail responses will be accepted. All of the above must be submitted in sufficient detail for a decision to be made on the availability of interested Small Business, HUBZone, EDWOSB, or SDVOSB concerns. Responses shall be limited to 5 pages. Please include your DUNS Number or CAGE Code on your response. Failure to submit all information requested would result in a contractor being considered "non-responsive" in this requirement. A decision on whether this will be pursued as a set-aside or an unrestricted basis will be posted as a modification in Federal Business Opportunities. Be advised that all correspondence sent via e-mail shall contain a subject line that reads, "PROJECT 100016". If sending attachments by e-mail, ensure only .pdf, .doc, or .xls documents are sent. The e-mail filters at Wright-Patterson AFB are designed to filter e-mails without subject lines or with suspicious subject lines or content. Therefore, if this subject line is not included, or if a .zip or .exe files is attached, it may be deleted by the e-mail filters.

More opportunities from Department Of Defense → FA8601 Aflcmc Pzio

Same awarding agency

NAICS: 334516
New
Federal
Off-Axis Parabolic Mirrors
Solicitation # FA860127Q0003
The Air Force Life Cycle Management Center, acting on behalf of the Air Force Institute of Technology, is conducting market research via a Sources Sought notice to identify capable sources for the manufacture and delivery of 66 customized off-axis parabolic mirrors and associated protected-gold coating services. These precision optical components are required for the Extreme Light Laboratory to support ultra-intense laser experiments. The mirrors must feature a fused-silica substrate, a 30 mm diameter, and a parabolic focus at 45 degrees. Technical specifications require an optical surface roughness of less than 1 nm RMS, a 20-10 scratch/dig specification, and polished backsides. The protected-gold coating must provide an average reflectivity of at least 97 percent at a wavelength of 780 plus or minus 40 nm with a 45-degree angle of incidence. The selected contractor will be responsible for all labor, materials, quality assurance testing, and documentation, including certificates of conformance and surface-measurement data. Delivery to Wright-Patterson Air Force Base must be completed within 98 calendar days after receipt of order, and the products must be warranted against defects for two years. Payment is structured as 100 percent after delivery with 30 days net terms. Interested parties under NAICS code 334516 must submit a capability package by October 23, 2026. This notice is for market research purposes only and does not constitute a solicitation or a commitment to award a contract.
Analytical Laboratory Instrument Manufacturing

POSTED

6 days ago

DEADLINE

in 3 days
View Details
NAICS: 334516
New
Federal
Sources Sought_Midwave Camera
Solicitation # FA860127Q0011
The Air Force Life Cycle Management Center, Installation Contracting Division, is conducting market research to identify potential sources capable of providing a 1.5-5 micron midwave camera and associated accessories for the Air Force Institute of Technology at Wright-Patterson Air Force Base, Ohio. This sources sought notice is for market research purposes only and is not a request for proposals. The government is seeking capabilities packages from all interested sources, including various small business categories, under NAICS code 334516. Interested firms must submit a concise capabilities package of no more than five pages by October 29, 2026, at 3:00 PM Eastern Time to the designated points of contact. The scope of work includes the delivery of the camera system, calibration of the instrument and lens, and the provision of a protective case. The contractor will be responsible for all transportation, loading, and onsite setup, with a required delivery timeline of no more than 90 days after contract award. Technical specifications include an operating temperature range of -10 C to 45 C and a two-year warranty against defects in material and workmanship. Payment is structured as 100% upon completion of all requirements on a net 30 basis, with invoicing processed through Wide Area Work Flow. The government is evaluating the potential for a small business set-aside and requires respondents to provide detailed information regarding their socio-economic status, ownership, and compliance with FAR clause 52.219-14 regarding limitations on subcontracting.
Analytical Laboratory Instrument Manufacturing

POSTED

6 days ago

DEADLINE

in 9 days
View Details
NAICS: 236220
New
Federal
SABER FY 27-32
Solicitation # FA860126R0019
The United States Air Force is soliciting proposals for the Simplified Acquisition of Base Engineering Requirements (SABER) FY27-32, a 100% 8(a) small business set-aside IDIQ contract. The selected contractor will provide all management, labor, materials, equipment, and design capabilities to execute over 100 simultaneous projects involving maintenance, repair, and minor construction of real property at Wright-Patterson Air Force Base, Ohio. The scope includes work on buildings, roads, roofs, and utilities, as well as hazardous waste remediation and design-build services from concept to 100 percent design. The contract has a maximum ceiling of 160 million dollars, which increases to 175 million dollars if the option for extended services is exercised. Performance is expected to begin within 10 days of award and spans a total period of 1,825 calendar days. Award will be based on the Lowest Price Technically Acceptable (LPTA) process. Proposals must first pass compliance gates, including a requirement for the prime contractor to be a US-owned and operated company. Technical evaluations are conducted on a pass/fail basis, focusing on the management approach and project planning and execution. Pricing is structured using RS Means line items and coefficients. Proposals must be submitted electronically via the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module. Key requirements include adherence to Davis-Bacon Act wage determinations for Montgomery and Greene Counties, compliance with NIST SP 800-171 cybersecurity standards, and the provision of a minimum one-year warranty on all construction work.
Commercial and Institutional Building Construction

POSTED

6 days ago

DEADLINE

in 3 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS