This Solicitation opportunity from California was posted on April 27, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Replace sign panels.
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
This contract, solicited under number 07-0W5504 by the California Department of Transportation, calls for the replacement of sign panels along a specified segment from 0.1 mile north of Haskell Avenue undercrossing to Las Virgenes Road overcrossing in Los Angeles County. The work involves the installation, maintenance, and removal of temporary traffic control systems including standardized signage such as 144”x60” “TRAFFIC FINES DOUBLED” panels, retroreflective orange signs, pavement markings, cones, portable radar speed feedback systems, and attenuators, all in strict compliance with Caltrans Standard Specifications, MUTCD standards, and relevant California Codes. The contract explicitly requires adherence to environmental regulations including lead compliance, asbestos surveys under NESHAP and SC AQMD Rule 1403, and submission of Environmental Product Declarations for materials. Performance may not begin before July 1, 2026, and is contingent upon the enactment of the 2026–2027 state budget, with potential termination if funding fails to materialize. Project closures are prohibited during the 2028 Olympic and Paralympic Games to ensure continued public access. The contract mandates substantial participation by certified Small Business Enterprises (SBEs) and Disadvantaged Business Enterprises (DVBEs), with specific goals requiring detailed documentation including signed commitment forms, price quotes, and official confirmation forms submitted within four business days after bid opening. Contractors claiming SBE participation must demonstrate a commercially useful function and are prohibited from double-dipping by using the same SBE to satisfy both participation goals and preference benefits. Certified payroll must be submitted electronically via LCPtracker Pro, and all samples requiring temperature control must be packed in ZIPLOCK bags with ice, ice packs, or dry ice and labeled with unique tracking IDs matching Chain of Custody records. All proposals must be submitted electronically through Caltrans’ e-bidding portal, with physical submissions as a fallback to the Office Engineer in Sacramento. The estimated contract value ranges from $619,064 to $959,886 based on submitted bids, with payment processed through Caltrans’ DBE system and strict withholding of up to $10,000 or 10% of SBE work value until final utilization reports are submitted. No formal COR, COTR, or PCO is named, and the evaluation method is unspecified, though award appears cost-driven with no stated trade-off or technical
General Info
Contract Value
$0Place of Performance
Los Angeles, CA, USASet-Aside
Award Issued Date
Timeline
Submission Closed
Organization & Contact Information
Full Description
More opportunities from California Department of Transportation
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
