Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Delaware was posted on July 22, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Replacement of Bridge 1-185 on Oak Ridge Road: Precast Concrete Frame Installation and Approach Roadway Reconstruction

Closed
T201407106State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238120
New
International
Cabot Tower Signal Mast Replacement, Signal Hill National Historic Site
Solicitation # 5P468-26-0234/A
Parks Canada Agency is soliciting bids for the removal and in-kind replacement of the 6m wooden signal mast and associated rooftop equipment repairs at the Cabot Tower, located within the Signal Hill National Historic Site in St. John's, Newfoundland and Labrador. The project requires the contractor to remove the existing mast, measure it, and install an identical replacement to ensure existing equipment can be reattached. All work must comply with the National Parks Act, the 2025 National Building Code of Canada, and provincial occupational health and safety laws. The project is scheduled to be completed no later than March 31, 2027, with work specifically timed for the off-season when the tower is closed to the public. The contract will be awarded based on a weighted evaluation consisting of 90 percent price and 10 percent for an Indigenous Participation Plan, which must include firm guarantees for Indigenous labor and business involvement. Bids must be submitted via email to [email hidden] or by fax to [phone hidden], with a final closing deadline of November 3, 2026. Submissions must be divided into two separate volumes for qualifications and pricing. Key operational requirements include maintaining a Health and Safety Plan on-site, providing security personnel after hours, and adhering to strict staging limitations due to the restricted space at the historic site.
Parks Canada Agency

POSTED

about 18 hours ago

DEADLINE

in 5 days
NAICS: 238120
New
International
Provision of Structural Repairs and Planned Maintenance to Blackpool Tower Winter 2026/7 and Summer 2027
Solicitation # ocds-h6vhtk-078f6c
Blackpool Borough Council is seeking a qualified Remedial Works Supplier to provide structural repairs and planned maintenance for Blackpool Tower, with an estimated total value of 4,000,000 GBP including VAT. The project is divided into three phases: a Winter Works package from November 2026 to March 2027 during operational closure, a Summer Works package from April 2027 to November 2027 during the operating season, and ongoing ad-hoc maintenance beyond November 2027 based on annual surveys. The initial period of performance runs from November 30, 2026, to November 29, 2027, with a possible one-year extension to November 29, 2028. The contract is an open competition with award criteria weighted at 50 percent Quality, 40 percent Price, and 10 percent Social Value. Mandatory requirements include IRATA level 3 qualified supervisors, IRATA level 1 or 2 technicians, and project managers who are Chartered Members of the Institution of Civil Engineers or Institution of Structural Engineers. Suppliers must maintain insurance coverage of 10 million GBP for Employer's Liability and Public Liability, and 5 million GBP for Professional Indemnity. All work must adhere to strict technical and safety standards, including BS EN 1090 Execution Class 3 for steel structures, CDM 2015, and the Work at Height Regulations 2005. The deadline for tender submissions is November 20, 2026.
Blackpool Borough Council

POSTED

1 day ago

DEADLINE

in 22 days

AI Contract Overview

Show more

The project involves replacing Bridge 1-185 on Oak Ridge Road with a new precast concrete frame to address issues caused by significant corrosion and section loss in the existing corrugated metal pipes, which have led to inadequate hydraulics and flooding of nearby properties. The work includes not only the installation of the new bridge structure but also minor reconstruction of the approach roadway, installation of guardrails as needed, and placement of riprap in the stream to prevent scour. The replacement will be carried out under a roadway closure with a detour in place, ensuring safety and minimal disruption. The contractor is expected to follow the plans, notes, and details provided, and perform incidental construction as directed by the Engineer. The contract, issued by the Delaware Department of Transportation, has a project value estimated between $500,000 and $1,500,000, with a solicitation posted on July 22, 2025, and a response deadline of August 19, 2025. The project falls under NAICS code 238120, indicating specialized work in structural and highway construction. The project aims to improve hydraulic capacity, prevent flooding, and ensure the structural integrity of the crossing, addressing longstanding issues with the existing infrastructure.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

The notice title changed. NAICS code changed from 238120 to 237310. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDelaware Department of Transportation
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
REPLACEMENT OF BRIDGE 1-185 ON OAK RIDGE ROAD - This project involves the replacement of one existing corrugated metal pipe with a precast concrete frame. Additional work includes minor reconstruction of the approach roadway, installation of guardrail as needed, and placement of riprap in the stream to prevent scour. The work will be performed under detour with roadway closure. There is significant corrosion at the waterline with 100% section loss at several locations throughout the pipes. The existing pipes are hydraulically inadequate and have caused flooding of adjacent property owners. This issue was brought to the attention of the Bridge Section, which inspected and inventoried the existing structure and then programmed the bridge for replacement. Follow other incidental construction in accordance with the location, notes and details shown on the plans, and as directed by the Engineer.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS