Request for Bids For Housing Demolition Services Related to the 2021 Community Development Block Grant- Neighborhood Revitalization (CDBG-NR) Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The contract requires the complete demolition of a residential structure located at 1715 Old Mount Olive Hwy in Dudley, NC, including all associated structures such as the front concrete porch, brick steps, treated deck, concrete driveway measuring approximately 66 feet by 12 feet with a thickness of 3 to 4 inches, and a small concrete sidewalk near the front porch. All debris and garbage surrounding the property must be removed, alongside the complete elimination of seven bushes located in the front and sides of the house. The site must be graded, cleaned, and leveled, with sufficient fill dirt brought in to address disturbed areas and ensure proper drainage, with the cost of the dirt included in the lump-sum bid. The site must be re-seeded and covered with hay to stabilize the soil. All aspects of the project are turnkey, encompassing disposal costs including landfill tipping fees, labor, materials, permits, insurance, and all other associated expenses. The contractor must provide documentation such as landfill tickets, paid invoices for subcontractors, and proof of payment for all third-party services rendered. Asbestos removal is a mandatory and critical component of the project, requiring full compliance with North Carolina Health Hazards Control Unit and federal regulations. All asbestos-containing materials identified in the attached report must be removed by a licensed asbestos contractor or a properly accredited subcontractor before any demolition occurs. Licenses for asbestos supervisors and workers must be submitted to the County prior to starting work. A clearance letter from the County asbestos inspector is required after removal, with the County covering the cost of the first inspection; any failed inspections and subsequent re-inspections must be paid for by the contractor, who must provide paid receipts before receiving final payment. The asbestos removal subcontractor must carry General Liability and Workers’ Compensation insurance matching the contractor’s minimum levels. All asbestos waste must be documented using NC Asbestos Waste Shipment Records for materials containing 1% or more asbestos, and any required asbestos removal or demolition permits must be obtained and submitted before work begins. The chain link fences and any storage or outbuildings are to remain undisturbed, and all work must align with the attached survey and instructions. Bids are due by August 27, 2026, and the solicitation is issued by the County of Wayne under the 2021 CDBG-NR program.
General Info
Agency
NAICS
Place of Performance
NC, USSet-Aside
Documents
(1)AI Contract Breakdown
Uniform Contract FormatWhat is UCF?
Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.
Timeline
Response Deadline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
More opportunities from North Carolina → County of Wayne
Same awarding agency
