Request for Expression of Interest and Announcement of a Vendor Conference for Support of the Design and Fabrication of a Central Solenoid Magnet System for ITER, an International Collaboration to Construct an Experimental Fusion Reactor

Active
ORNL-185Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract focuses on the design, fabrication, and assembly of the Central Solenoid (CS) Magnet System, a critical component of the international ITER fusion reactor project based in Cadarache, France. The CS Magnet System, a massive superconducting magnet consisting of seven modules and an external supporting structure, will be supplied by the United States, responsible for approximately 9% of ITER’s construction costs. This system uses advanced Nb3Sn-based conductors and, when fully assembled, will be about 18 meters tall, weigh around 900 metric tons, and generate magnetic fields exceeding 12 Tesla. The U.S. effort is coordinated by the US ITER Project Office, hosted at Oak Ridge National Laboratory, in partnership with other DOE labs and industry collaborators. The contract outlines an acquisition plan that includes design responsibility, procurement of long-lead materials, and phased contracting for module fabrication, structural components, and assembly tooling, emphasizing collaboration with industrial vendors through study contracts and Basic Ordering Agreements prior to major production contracts. A vendor conference was scheduled to provide potential suppliers with details on the CS system’s design and fabrication plan, project schedule, and procurement processes, encouraging industry participation and feedback. Registration for the event was required by March 26, 2010. The contract foresees issuing Requests for Proposal (RFPs) for major procurements starting with CS module fabrication in August 2010, with contract awards planned through 2013 for structures and assembly tooling following final design completion. The plan includes pre-purchasing significant quantities of high-strength stainless steel as government-furnished equipment to avoid delays. Through this phased and collaborative acquisition strategy, the contract seeks to ensure timely delivery of this technologically advanced subsystem crucial for ITER’s success in demonstrating the feasibility of fusion power.

General Info

U.S. contracts design, fabrication, assembly of ITER Central Solenoid magnet, emphasizing phased industrial collaboration.

Agency

N/A

NAICS

541330 - Engineering Services

Place of Performance

Not specified

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

2 updates
PhaseSources Sought
Posted

Sources Sought

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The notice description changed.

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyN/A
Contacts2 people available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
Contacts
Jeremy R. DuncanSubcontract Administrator

Full Description

Show more
UPDATE: EVENT REGISTRATION DEADLINE EXTENDED TO 03/26/2010 Introduction The Magnet Systems Team of the US ITER Project Office is responsible for delivering the Central Solenoid (CS) Magnet System to ITER, an international collaboration head-quartered in Cadarache, France. The project is being designed and built by the ITER partners: the European Union, India, Japan, the People's Republic of China, the Republic of Korea, the Russian Federation, and the United States. US project responsibilities will be accomplished through a collaboration of DOE laboratories, universities, and industry. The U.S. ITER Project Office is hosted by Oak Ridge National Laboratory with partner labs Princeton Plasma Physics Laboratory and Savannah River National Laboratory. From Latin for "the way", ITER has the goal of demonstrating the scientific and technological feasibility of extracting net power from a burning, fusion plasma. Achieving this burning plasma requires the resolution of complex physics issues and the integration of new and improved technologies. ITER is designed to be the premier scientific tool for exploring and testing expectations for plasma behavior in the burning-plasma regime, wherein the fusion process itself provides the dominant heat source to sustain the plasma temperature. The fusion power from this machine will be up to ten times greater than the total external power required for operating the machine and heating its plasma. As such, it will provide the scientific basis and plasma-control tools needed to move toward commercial power from fusion energy. The United States is an equal, non-host partner, responsible for about 9% of the construction cost of ITER. As such, it will contribute hardware components, personnel, cash, and contingency during the construction phase of the project. The CS magnet system will be a major part of the US-contributed hardware. Background The CS Magnet System is very large superconducting magnet system that will be comprised of a stack of 6 Modules and the External Structure that holds them all together and supports them during operation. A total of 7 CS modules will be manufactured, with one serving as a spare. All modules will be delivered to the ITER Site, Cadarache, France, along with the External Structure and special tooling for assembly. The CS Modules will be constructed from Nb3Sn-based, cable-in-conduit conductors supplied by the Japanese Team in lengths of either 600 or 900 meters each (and weights of about 11 or 16 metric tons, respectively). Each module will weigh approximately 110 metric tons when finished, and when assembled, the total system will be approximately 18 meters tall and weigh around 900 metric tons. When charged to full current of 45 kilo-amperes, the assembly will produce fields of over 12 Tesla and will store over 6 Giga-Joules of energy. Terminal-to-terminal operating voltages up to 14 kilo-volts are expected. The superconducting-magnet technologies embodied in the ITER CS Magnet System are essential to future fusion reactors but may also be regarded as enabling technologies for future large superconducting magnetic systems. The design of the CS Magnet System is presently in an advanced conceptual-design stage. The project is now ready to begin preliminary design. Acquisition Plan An acquisition plan has been developed. The main elements of the acquisition plan are as follows: - The US Domestic Agency (DA) is responsible for the design of the CS modules, structures, and assembly tooling and for the assembly procedures - Industrial vendors will be selected after final design to provide the CS structures and assembly tooling - Study contracts will be placed with potential industrial vendors for the CS structures and assembly tooling to assist the US DA design and planning efforts - Long lead materials for the CS structures will be procured by the US DA before the completion of final design and provided to the industrial vendors as government furnished equipment (GFE) - An industrial vendor will be selected as soon as possible to provide the CS module fabrication - The US DA will develop (with industry support) critical fabrication processes prior to award of the CS module fabrication contract and transfer this technology to the industrial vendor - Study contracts will be placed with potential industrial vendors for the CS modules as needed to assist the US DA design, manufacturing development, and planning efforts until the production contract is awarded Schedules for acquiring the CS modules, structures, and assembly are illustrated in the attached figures 1 and 2. A Look Forward at ITER CS Business Opportunities The purpose of this announcement is to identify prospective vendors to support this acquisition plan through assisting in CS design and planning activities, providing structural materials, and fabricating the CS modules, structures, and assembly tooling. To provide early information about the ITER CS design, fabrication, and future business opportunities, a vendor conference will be held on April 7, 2010 in Oak Ridge, TN. At this conference, the CS acquisition plan, along with details of the project schedule and the design and fabrication effort will be presented and discussed. Potential suppliers for CS modules, structures, assembly tooling, and bulk materials are encouraged to attend. Feedback from prospective vendors on the acquisition plan is sought. Registration for the vendor conference is required before March 26, 2010. Please register with Pat Smith, US ITER Contracts Assistant, by COB, March 26, 2010. (Pat Smith, 1055 Commerce Park, MS 6483, Oak Ridge, TN, 37831-6483, contact@example.gov, +1 (555) 000-0000). Registration by e-mail is preferred. Company name, number and names of potential attendees, and country of citizenship are required. Attendees that are not United States citizens must also provide their date of birth and country of birth. If you are unable to attend but are interested in future CS business opportunities, please contact Pat Smith. Procurement of the CS modules will begin with the release of a Request for Proposal (RFP) in August 2010 and contract award in March 2011. This will be a contract for a single vendor (or team) for the fabrication of the CS modules. Preliminary design will be in progress during the period of this solicitation. Manufacturing input into CS module design and planning efforts during this period will be arranged through individual study contracts or through Basic Ordering Agreements (BOA) with task orders for specific studies. Prospective suppliers for the CS modules are encouraged to participate in these study contracts, or BOAs, for providing manufacturing input. Procurement of the CS structures will begin following final design with the release of the RFP in May 2013 and contract award in October 2013. These will be contracts with one or more vendors for the fabrication of CS structures. The design of the CS structures may entail the use of hundreds of tons of high strength stainless steel. To avoid lengthy schedule delays, we plan to procure much of this material in advance and provide it to the structure fabricators as government furnished equipment (GFE). The RFP for this procurement will be released midway through final design in February 2012 with contract award in June 2012. The US DA is responsible for providing any special purpose assembly tooling needed to assemble the CS modules and structures into a single unit. Procurement of the CS assembly tooling will begin following final design with the release of the RFP in January 2013 and contract award in June 2013. These will be contracts with one or more vendors for the fabrication of CS assembly tooling. Procurement of the CS structures and assembly tooling will not occur until after final design is completed. As with the CS modules, manufacturing input into CS structures and assembly tooling design and planning efforts during this period will be arranged through individual study contracts or through Basic Ordering Agreements (BOAs) with task orders for specific studies. Prospective suppliers for the CS structures and assembly tooling are encouraged to participate in these study contracts or BOAs for providing manufacturing input. We thank you for your interest in the potential ITER CS business opportunities.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
SLED
Road Asset Management
Solicitation # FY27-ENGCP-002-6
The Bulloch County Board of Commissioners is soliciting Statements of Qualifications for project FY27-ENGCP-002-6, focused on Road Asset Management. The selected consultant will be responsible for collecting and analyzing field data, creating a road asset inventory, and developing a Capital Improvement Plan with an outlook extending to FY 35. The scope includes GIS database development, web-based mapping, and the identification of structural hazards and drainage failures to minimize safety risks and legal liability. All prime and sub-consultants must be GDOT Prequalified Contractors as of the submission deadline on November 20, 2026, at 3:00 PM EDT. Proposals are evaluated based on a composite scoring system that weights prime consultant experience and technical approach at 20% each, GIS capabilities at 20%, asset prioritization methodology at 15%, workload capacity at 15%, and past references at 10%. The highest-ranked consultant will be invited to negotiate a contract. Key requirements include a Principal-in-Charge with at least 10 years of industry experience and comprehensive insurance coverage, including professional malpractice and general liability of at least 1 million dollars per occurrence. Submissions are limited to ten pages, excluding mandatory forms and charts, and must include a Non-Collusion Affidavit and Bidder Declaration. Either party may terminate the resulting agreement with 30 days written notice.
Bulloch County Board of Commissioners

POSTED

about 5 hours ago

DEADLINE

in 22 days
View Details
NAICS: 541330
New
International
CoT RFP Event Q30-01-2026-27
Solicitation # Q30-01-2026-27
The City of Tshwane is soliciting a service provider for professional engineering services to support town planning subdivision application processes on city-owned properties. The scope of work is divided into three primary categories: Civil Services Reports, Geotechnical Investigations, and Route Determination Reports. All services must be led by a Professional Engineer registered with the Engineering Council of South Africa and must comply with the Gauteng Transport Infrastructure Act, National Building Regulations SANS 10400, and various SANS and SANRAL standards. The project follows a strict timeline, requiring an inception meeting within one month, draft reports within three months, final reports within five months, and project close-out within six months of appointment. The solicitation, numbered Q30-01-2026-27, closes on November 12, 2026, at 10:00. Awards are based on an 80/20 preferential point system in accordance with the Preferential Procurement Policy Framework Act and 2022 Regulations, with specific goals including points for women-owned, youth-owned, and disability-owned enterprises, as well as local economic participation. Evaluation occurs in four stages, starting with administrative responsiveness and a functionality score of at least 70 out of 100. Successful bidders must enter into a Service Level Agreement, with payment terms set at 30 days following the receipt of an invoice. Required submission documents include company registration, tax clearance or a CSD unique pin, and B-BBEE certification.
City of Tshwane

POSTED

about 7 hours ago

DEADLINE

in 13 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS