Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on October 7, 2014. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Request for Information - Potential Temp Construction Camp Facilities at Clear AFS, AK

Closed
W911KB-15-S-RFI0Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity, categorized under NAICS code 236220, specifically calls for bids from Disadvantaged Business Enterprise (DBE) subcontractors. The solicitation was posted on October 20, 2026, with a response deadline of November 4, 2026. The project area for subcontracting opportunities is identified as Riverside or Los Angeles. Compliance with strict Disadvantaged Business Enterprise requirements is mandatory to secure project financing, and failure to meet these standards will result in a bid being deemed non-responsive. Bidders must demonstrate Good Faith Efforts (GFE), including proof of posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for at least one day prior to the bid opening. Additionally, bidders must provide proof of utilizing the Small Business Administration and the Minority Business Development Agency within their bid package. While outreach documentation may be submitted up to three business days after the bid closing, the publicity and agency assistance proofs must be included at the time of submission.
RT CONTRACTOR CORP

POSTED

about 13 hours ago

DEADLINE

in 14 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. This scope encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, telecommunications, and the installation of underground stormwater retention and utility systems. An additional option for the P1016 facility includes a 17,978 square foot laboratory with similar structural specifications and the demolition of an existing 548 square meter engineering facility. The solicitation is open to various small business designations, including SDB, WOSB, HUBZone, and VOSB. Bidders must adhere to Davis Bacon Wage Rates, and the project is exempt from sales tax. Pricing is requested across a wide array of trades, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection, among others. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 13 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of an upgraded 2.0 million gallons per day wastewater treatment plant located at 41901 Walnut Avenue in Greenfield, California. The project, managed by C. Overaa & Co., has a total duration of 915 calendar days and is divided into four distinct phases: site preparation including soil stabilization and facility relocation; construction of a packaged Membrane Bioreactor treatment plant, headworks, UV disinfection, and SCADA systems; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension for water and sewer services. A critical requirement of the project is maintaining the existing plant in service during the first two phases while ensuring compliance with General Order/NOA standards. This solicitation is open to small businesses, including certified veteran, women, and disadvantaged business enterprises, with a specific local hiring goal requiring 50 percent of the construction workforce to be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic invoicing system and are responsible for associated service fees. Bids are due by November 10, 2026, following a mandatory pre-bid meeting held on October 5, 2026. Award acceptance is conditioned upon the subcontractor's full agreement to Overaa standard terms, including potential 100 percent performance and labor bonds and specific workers compensation insurance waiver of subrogation endorsements.
C. Overaa & Co.

POSTED

about 13 hours ago

DEADLINE

in 20 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the construction of an Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. Technical requirements encompass a wide range of trades, including demolition, abatement, structural steel, electrical, plumbing, and mechanical work. Key site features include rigid inclusions, load transfer mats, grounding and lightning protection, intrusion detection systems, and extensive site preparation involving rock excavation and wetland mitigation. The project also requires the installation of primary and secondary electrical distribution, telecommunications infrastructure, access roads, and landscaping. This opportunity is set aside for various small business categories, and interested parties must contact Rahul Maheshwari to receive bid documents before the October 31, 2026 deadline.
J & J Contractors, Inc

POSTED

about 13 hours ago

DEADLINE

in 10 days

General Info

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

Clear Air Force Station (AFS), AK, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

special-notice

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W2SN Endist Alaska
Contacts2 people available
OfficeANCHORAGE, AK, 99506-0898, USA
Office AddressANCHORAGE, AK, 99506-0898, USA
Contacts
Kathy WooldridgeContract Specialist
Aldone GrahamContracting Officer

Full Description

Show more
SPECIAL NOTICE REQUEST FOR INFORMATION (RFI) Potential Temporary Construction Camp Facilities at Clear AFS, Alaska THIS IS NOT A REQUEST FOR PROPOSAL, REQUEST FOR QUOTE, OR INVITATION FOR BID. THERE WILL NOT BE A SOLICITATION, SPECIFICATIONS, OR DRAWINGS AVAILABLE AT THIS TIME. 1. Introduction: The U.S. Army Corps of Engineers (USACE), Alaska District is issuing this Request for Information (RFI) to obtain responses from members of the construction community interested in constructing and operating temporary construction camp facilities in the vicinity of Clear Air Force Station (AFS), Alaska. USACE intends to use the information provided for planning purposes and to help make strategic decisions regarding this potential procurement. USACE will not reimburse RFI respondents for any expenses associated with responding to this RFI, though USACE sincerely appreciates respondents' efforts and input. The USACE Alaska District may issue a Request for Proposals (RFP) at some point in the future, however, this RFI is not to be construed as a commitment by the Government, nor will the Government pay for any information provided. 2. Opportunity / Background: The Government is seeking industry input regarding the potential to design/construct and operate temporary construction camp facilities in the vicinity of Clear AFS, Alaska, potentially during the period of 2016 through 2020. Clear AFS is located approximately 80 miles southwest of Fairbanks, Alaska in the Tanana Valley and has a sub-arctic continental climate characterized by long cold winters and short mild summers. Temperature extremes can vary from a high of almost 100 degrees Fahrenheit in the summer to -60 degrees Fahrenheit in the winter. This potential construction camp requirement is still in the advanced planning stage; initial indications are that the camp must support a temporary construction and technical workforce population of approximately 350-persons during 2018 through 2020. The potential plan is for the full implementation of the camp to take place in phases with the initial phase of the man camp being executed in 2016, if future funding is made available. The initial element of work would include the design of the full camp and the construction of requisite on-site potable water and septic utilities along with the kitchen/dining, laundry, and recreation modules. It would also include the construction of the initial sleeping modules to accommodate 150-PN. The remaining 200-sleeping modules to accommodate the full camp build-out would be delivered in phases as required to support the ramp-up off the vendor population. It is assumed that the temporary construction camp would be of modular design, and that all of the facilities and utilities would be designed to efficiently accommodate sub-arctic conditions with a planned life of five (5) years. The current planning strategy calls for the camp facilities to be located on cleared portion of Clear AFS within a designated partitioned area that is outside of the installation's security boundaries. The area has been cleared for multiple decades; however, considerations for arctic conditions, including challenging foundation soils should be considered. The camp would require the development of on-site utilities including potable water, sewerage, commercial power, and communications. Potable water would be provided by the development of a temporary well and a looped pipe distribution system designed and constructed for sub-arctic conditions, including pre-heat. The water system would be sized to support fire hydrants delivering the water flow rates and quantity required by fire code. Sewerage collection and treatment would be through pipe collection into an on-site septic system designed for the specific soil and temperature regimes found at the site. All onsite utility development would be accomplished through permit with applicable regulators. All relocatable facilities would be industry-standard structures as utilized in medium-sized temporary camps in sub-arctic environments and not custom-designed facilities tailored specifically for this program. They would require full Life/Safety Code Compliance including adequate egress and must be designed/manufactured to meet site conditions, including thermal requirements and all loading requirements for conditions at Clear AFS. When placed in the operational location, the relocatable facilities would be founded upon a foundation system compatible with soil bearing capacities and the structural design of the relocatable assemblies. The use of gang latrine/showers within sleeping facilities would be acceptable. In addition, the use of separate centralized latrine/shower facilities would be acceptable. The latrine and shower capabilities are to support worker hygiene requirements with adequate shower, sink, and toilet and urinal fixtures to support a maximum field population of 350-PN. Water would be required to be heated to applicable use requirements by "on-demand" type appliances. Facilities would need to have adequate ventilation and lighting and would be required to be heated. For all man camp facilities, wired smoke/fire detectors would be required with a fire alarm system compatible with the system used at Clear AFS. The Government is currently considering two (2) separate strategies for the fulfillment of this potential requirement: 1) A Government construction contract(s) (potentially Design/Build) with a separate service contract to operate and maintain the camp and related utilities. Operation would include management, housekeeping, maintenance, and operation of food services and laundry services. Fully supported and operated by a service contact, all maintenance, utilities, and security would be the responsibility of the man-camp vendor contract personnel. Clear AFS personnel would provide emergency first response if required; however policing beyond the vendor provided security would be provided by Alaska State Troopers, or 2) A turn-key vendor option, wherein the vendor provides and operates the man-camp under a performance-based scenario. 3. Statement of Limitations: a. USACE represents that this RFI, submissions from respondents to this RFI, and any relationship between USACE and respondents arising from or connected or related to this RFI, are subject to the specific limitations and representations expressed below, as well as the terms contained elsewhere in this RFI. By responding to this RFI, respondents are deemed to accept and agree to this Statement of Limitations. By submitting a response to this RFI and without the need for any further documentation, the respondent acknowledges and accepts USACE's rights as set forth in the RFI, including this Statement of Limitations. b. USACE reserves the right, in its sole discretion, without liability, to use any or all of the RFI responses in its planning efforts, and to develop and operate the temporary construction camp, in whole or in part, outside of this RFI process. USACE reserves the right to retain all the materials and information, and the ideas and suggestions therein, submitted in response to this RFI. All such material, information, ideas, and suggestions will become the property of USACE. c. This RFI will not be construed in any manner to create an obligation on the part of USACE to enter into any agreement, nor to implement any of the actions contemplated herein, nor to serve as the basis for any claim whatsoever for reimbursement for any costs associated with the preparation of responses submitted to the RFI. d. The submission of an RFI response is not required to participate in any potential future RFP issued by USACE. e. To the best of USACE's knowledge, the information provided herein is accurate. However, USACE makes no representations or warranties whatsoever with respect to this RFI or the site, including representations and warranties as to the accuracy of any information or assumptions contained in this RFI or otherwise furnished to respondents by USACE, site and environmental conditions on the property or the suitability of the site, or any portion thereof, for any specific uses or development. f. This RFI is issued solely for information and planning purposes and does not constitute a solicitation. Responses to this notice are not an offer and cannot be accepted by USACE to form a binding contract. g. Respondents submitting business information pursuant to this RFI should consult 32 C.F.R. and other implementing regulations concerning the release of such information to third parties under the Freedom of Information Act. All information submitted by respondents that they consider confidential and not releasable to third parties outside of USACE, and its employees, agents, consultants, and representatives, must be clearly and conspicuously so marked. 4. Submission of Responses: All interested parties should submit a cover sheet, company description, including business size and the completed numbered items below, in the specified format with appropriate supporting information clearly marked "Response to RFI - Potential Temporary Construction Camp Facilities at Clear AFS, Alaska" no later than 02:00 PM, Alaska Time on 14 October 2014, to the following Point of Contact: Kathy Wooldridge US Army Corps of Engineers, Alaska District kathy.wooldridge@usace.army.mil Responses must be submitted via email to kathy.wooldridge@usace.army.mil or via fax to 907-753-2544. 5. Response Format: a. Cover Sheet, including: - Company Name - Company Address - Name and Contact Information for Company Representative including: - Telephone Numbers - E-mail Address - Signature of Representative b. Brief company description: business size under NAICS 236220; years in business; type of entity; followed by response to RFI items in numerical order and by any additional materials. Please limit submission to five (5) pages for discussion of the items below; pages must be numbered. You may attach supplementary materials outside of the page limitation. USACE Request for Information (RFI) "Potential Temporary Construction Camp Facilities at Clear AFS, Alaska" 1. Provide a discussion of your specific technical approach for design/construction of the potential temporary man-camp facilities at Clear AFS, identifying planning and scheduling, and any possible constraints/obstacles and assumptions. 2. Indicate your firm's ability to provide services for operation of the man-camp, to include housekeeping, maintenance, utilities, security, food and laundry services. 3. Provide your firm's specific capabilities and any past performance of design/construction of similar types of facilities, particularly in a sub-arctic environment. 4. Provide any additional information you feel is relevant.

More opportunities from Department Of Defense → W2SN Endist Alaska

Same awarding agency

NAICS: 237990
New
Federal
Lowell Creek Tunnel Repairs, Seward, Alaska
Solicitation # W911KB27BA005
The Department of Defense, through the Alaska District of the U.S. Army Corps of Engineers, is issuing a presolicitation notice for the Lowell Creek Tunnel Repairs in Seward, Alaska. This project involves repairing worn areas and installing new center rails within a 2,100-foot, horseshoe-shaped tunnel that diverts Lowell Creek through Bear Mountain into Resurrection Bay. The scope of work includes structural repairs to the intake transmission tunnel and outlet, the construction of a concrete channel, and the use of abrasion-resistant concrete featuring silica fume and fly ash or slag for alkali-silica reactivity mitigation. The contractor will be responsible for providing all labor, equipment, materials, and supervision, including managing tunnel dewatering and winter construction challenges and implementing a temporary flood management plan. The project will be awarded as a firm-fixed-price contract under NAICS code 237990, with an estimated construction magnitude between 10 million and 25 million dollars. The solicitation is expected to be available via SAM.gov on or after November 3, 2026, with an anticipated award date in December 2026. The period of performance is estimated at 1,000 calendar days. Bids will be accepted electronically through the PIEE Solicitation Module under solicitation number W911KB27BA005. All offerors must be registered in SAM.gov, and the contract will adhere to Construction Wage Rates.
Other Heavy and Civil Engineering Construction

POSTED

1 day ago

DEADLINE

N/A
View Details
NAICS: 236220
New
Federal
Market Intelligence for EIE483 and EIE484
Solicitation # W911KB27RWP11
The U.S. Army Corps of Engineers, Alaska District, is seeking market intelligence via a Request for Information for two Military Construction projects at Eielson Air Force Base, Alaska. The first project, EIE483, involves the design and construction of a Joint Mobility Center Expansion, including a Deployment Processing Facility, hazardous materials storage, and exterior covered storage canopies, with an estimated magnitude of 249.2 million dollars. The second project, EIE484, consists of constructing a 225-bed permanent party dormitory with an estimated magnitude of 305 million dollars. Both projects are planned for a period of performance from FY27 through FY31, with design starting in FY27 and construction beginning in FY28 for the dormitory and FY29 for the mobility center. The government intends to utilize Other Transaction Agreements under 10 U.S.C. 2808a, with a planned two-phase approach consisting of design and pre-construction services followed by final design and construction. Potential delivery methods under consideration include Progressive Design-Build or Construction Manager at Risk. This RFI is strictly voluntary and is being used to assess industry capabilities, budget realism, and preferred acquisition strategies. Interested parties must submit the Market Intelligence Questionnaire by October 29, 2026, at 14:00 Alaska Time. The projects fall under NAICS code 236220 for Commercial and Institutional Building Construction, with a small business size standard of 45 million dollars.
Commercial and Institutional Building Construction

POSTED

6 days ago

DEADLINE

in 9 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS