Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Pennsylvania was posted on June 26, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Request for Proposal Security Camera System Upgrade & Installation

Closed
Centre County Recycle & Refuse Authority, PAState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The Centre County Recycling & Refuse Authority is seeking qualified vendors to supply and install a comprehensive security camera and video management system across its facilities, aiming to modernize surveillance infrastructure and enhance operational safety. The project requires replacing and expanding camera systems at four key locations: the Main Building, Transfer Station/Building C, Scale House, and Building E—the Recycling Plant. This includes upgrading to a 64-channel NVR at the Main Building, installing high-resolution and specialized cameras such as PTZ, 360°, 180°, license plate recognition (LPR), and thermal models, and ensuring wired connectivity via PoE with newly installed network switches and CAT6 cabling where needed. All equipment must support at least 30 days of high-quality video retention and include software features like motion detection, automated alerts, and remote viewing access. NDAA Section 889 compliance is mandatory for every component, from cameras to NVRs and networking hardware, with approved equal systems accepted only if fully documented and deemed equivalent by the Engineer. Vendors must submit detailed proposals via Penn Bid by July 24, 2026, including a company overview, technical specifications, compliance documentation for any proposed alternatives, itemized pricing covering equipment, installation, training and maintenance, warranty terms, and a feasible project timeline with completion no later than October 31, 2026. Substitutions not included in the original bid may be rejected. Evaluation will prioritize technical compliance, vendor experience with similar security system installations, the reasonableness of the proposed schedule, and the quality of post-installation support. An optional pre-bid site meeting is scheduled for July 8, 2026, at the Authority’s headquarters in Bellefonte, PA, and all inquiries must be directed to Patrick R. Burke of Entech Engineering, Inc. Proposals must fully adhere to Pennsylvania municipal procurement regulations, and only complete submissions will be considered.

General Info

Supply and install compliant security camera system with 30-day retention at four facilities by October 31, 2026.

Agency

Pennsylvania → Centre CountyView Agency

NAICS

561621 - Security Systems Services (except Locksmiths)View NAICS

Place of Performance

Centre County, PA, USA

Set-Aside

NONE

Documents

(3)

Centre County Recycling and Refuse Authority Security Camera System Upgrade - Addendum No. 2

PDF7 pagesamendment

CCRRA Security Camera System Upgrade RFP

PDF12 pagesrfp

CCRRA - Security Camera Upgrades - Addenda 1.zip

ZIP

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyPennsylvania → Centre County
Contacts1 person available
OfficeCentre County, PA, USA
Organization / Agency
Pennsylvania → Centre County
View Agency Profile
Office AddressCentre County, PA, USA

Interested Companies (72)

Show more
X-Pert Communications
Stellar-1 Communications
Centerburg, Ohio
IDIS Americas
coppell, TX

See All 72 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
1. Introduction The Centre County Recycling & Refuse Authority (Authority or CCRRA) invites qualified vendors to submit proposals via Penn Bid for the supply and installation of a comprehensive security camera and video management system. The referenced system is intended as a basis of design, and approved equal systems will be considered by the Engineer. This initiative is intended to strengthen safety protocols, enhance surveillance capabilities, and modernize existing infrastructure across all Authority facilities. 2. Project Objectives The Authority seeks to achieve the following goals through this engagement: • Enhance security monitoring coverage of critical operational areas. • Improve fire prevention and overall site safety. • Establish a multi-tier video management platform providing a minimum of thirty (30) days of accessible, high-quality recorded footage. 3. Scope of Work 3.1 Main Building • Replace the existing 32-channel Network Video Recorder (NVR) with one (1) 64 channel NVR to accommodate all site cameras. • Replace the following exterior cameras: • One (1) PTZ camera • One (1) 360° camera • One (1) 180° camera • One (1) license plate recognition (LPR) camera • Utilize the existing point-to-point (PT-to-PT) link on the main building, which services three (3) light poles located near the public recycling bins. 1 • Install four (4) cameras along the front drive, consisting of: one (1) PTZ, one (1) LPR, one (1) 360°, and one (1) 180° camera — with two cameras mounted on a single pole, one positioned over the recycling area, and one facing the front of the main building. • Each light pole includes a NEMA-rated enclosure with an integrated network switch. 3.2 Transfer Station / Building C • Install one (1) new 8MP varifocal/zoomable camera overlooking the lower lot, replacing an existing camera that is over ten (10) years old. • Within the transfer building: • Replace three (3) existing thermal cameras. • Install one (1) new thermal camera near the loading bay. • Replace one (1) non-thermal, low-resolution camera with one (1) 8MP turret camera. • Install one (1) additional thermal camera on the opposite wall of the transfer station. • Install one (1) 24-port network switch. 3.3 Scale House • Remove the existing rooftop camera and replace it with one (1) four-lens 360° camera mounted at the building corner. • Replace the existing inbound LPR camera mounted on the post at the Scale House. • On the outbound scale post, remove one (1) of the two existing cameras and replace with one (1) license plate recognition (LPR) camera. • Install one (1) new varifocal/zoomable camera on the rear of the Scale House, providing coverage of the shop building on the hill. • Install one (1) 8-port network switch. (Note: The client has confirmed that new fiber infrastructure is already available at the Scale House.) • Run all new CAT6 cables as required. 3.4 Building E – Recycling Plant • Existing infrastructure consists of CAT6 cabling throughout. 2 3 • Install one (1) 24-port network switch. Replace nine (9) existing thermal cameras. • Replace two (2) existing turret cameras currently positioned to overlook machinery. • Add thermal camera to loading bay #5. • Replace 1 – 8MP varifocal lens camera to overlook processing loading bays. • Supply Ubiquiti remote TV viewer. 4. Technical Specifications All proposed equipment shall meet or exceed the following specifications: Basis of Design and Approved Equals: References to a specific manufacturer, product line, or configuration are intended to establish the minimum basis of design, performance, compatibility, and functional requirements only. Proposed equal systems shall be submitted with the bid/proposal, including manufacturer names, model numbers, product data sheets, a compliance matrix, NDAA compliance documentation, and a list of any deviations from the specified requirements. Acceptance of any proposed equal shall be as determined by the Engineer. Category Specification Basis-of-Design Camera System 3 × Turret 8MP Fixed; 3 × LPR; 1 × 12MP Fisheye; 1 × 5MP PTZ Active Deterrence; 15 × Thermal; 1 × 5MP multi-Sensor 360°; 1 × Panoramic Dual Sensor; 3 × 8MP Varifocal Turret Field of View 180°, 360°, varifocal lens, and LPR configurations as specified Connectivity Wired, Power over Ethernet (PoE) Recording System NVR-based with a minimum of thirty (30) days of storage retention Software Features Motion detection, automated alert notifications, remote viewing access Category Specification Compliance Full adherence to applicable industry standards and regulations. All proposed video management system (VMS) components, cameras, network video recorders (NVRs), and associated networking equipment shall be NDAA Section 889 compliant. 5. Proposal Submission Requirements Vendors responding to this RFP shall provide the following documentation: Procurement Compliance: All proposals shall be prepared and submitted in accordance with applicable Pennsylvania municipal procurement requirements and the requirements of this RFP. Bidders are responsible for submitting complete information for any proposed equal with their bid/proposal; substitutions or proposed equals not submitted with the bid/proposal may be rejected as non-responsive, at the discretion of the Authority and Engineer. 1. Company Overview — Summary of organizational background and demonstrated experience with comparable projects. 2. Technical Proposal — Detailed product specifications and documentation confirming compliance with stated requirements. 3. Approved Equal Documentation - If proposing a system other than the basis-of design system, provide complete documentation with the bid/proposal demonstrating that the proposed system meets or exceeds the specified requirements. The Engineer shall determine whether proposed equals are acceptable. 4. Pricing Breakdown — Itemized costs inclusive of equipment, installation, end-user training, and ongoing maintenance fees. 5. Warranty & Support Terms — Description of warranty coverage and post installation support offerings. 6. Project Timeline — Estimated schedule from purchase order issuance through full system commissioning. 4 5 6. Evaluation Criteria Proposals will be evaluated on the following basis: Criterion Consideration Technical Compliance Degree to which the proposal meets all specified technical requirements. Vendor Experience & Reputation Demonstrated history with security system projects of similar scope. Project Timeline Reasonableness and feasibility of the proposed implementation schedule. Preferred substantial completion no later than 10/31/2026. Support & Warranty Terms Quality and comprehensiveness of post-installation service offerings. 7. Key Dates Milestone Date RFP Issuance June 26,2026 Optional Pre-Bid Meeting Deadline for Vendor Questions July 8, 2026 (10:00 AM) July 17, 2026 (Noon) Proposal Submission Deadline July 24, 2026 (Noon) Evaluation & Vendor Selection July 28, 2026 8. Optional Pre-Bid Meeting Bidders are encouraged, but not required, to attend a pre-bid meeting on-site to familiarize themselves with the project location on Wednesday, July 8, at 10:00 AM. The meeting will be held in the Authority’s Board Room located at 253 Transfer Road, Bellefonte, PA 16823. 9. Contact Information All inquiries and proposal submissions should be directed to: Patrick R. Burke, P.E. Senior Project Manager Entech Engineering, Inc. pburke@entecheng.com 570-274-0294

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS