Request for Proposals (RFP) - Advanced Metering Infrastructure System
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The City of Zebulon is soliciting proposals for a single contract to furnish and install approximately 841 water meters ranging from 3/4 inch to 6 inches, along with a comprehensive Advanced Metering Infrastructure (AMI) system. The specific meter quantities include 775 of 3/4 inch, 18 of 1 inch, 18 of 1.5 inch, 20 of 2 inch, 7 of 4 inch, and 3 of 6 inch meters. The scope of work encompasses all installation labor, materials, training, and the integration of billing software to manage and collect live time metering data. The project is expected to be completed within 180 consecutive calendar days and is funded in whole or in part by the Georgia Environmental Finance Authority Drinking Water State Revolving Loan Fund. Eligible proponents must be the actual meter manufacturer or a designated supplier for the territory, and the installation contractor must be licensed by the State of Georgia. Proposals are due by October 23rd at 10:00 a.m. at Zebulon City Hall and must include a bid bond or certified cashier's check for at least 5% of the proposed contract amount. The successful contractor will be required to provide performance and payment bonds equal to 100% of the contract price. Additionally, the selected provider must comply with 41 CFR 60-4 regarding affirmative action and the Georgia Security and Immigration Compliance Act, including the use of E-Verify.
General Info
Agency
NAICS
Place of Performance
GA, USASet-Aside
Timeline
Response Deadline
Organization & Contact Information
Full Description
The work to be completed shall consist of furnishing and installing approximately 841 water meters from ¾" to 6" (775-¾", 18-1", 18-1½", 20-2",7-4", 3-6") in the City of Zebulon. The work includes all installation labor, materials or related appurtenances regarding replacement of existing meters. The work to be completed also includes the installation of an advanced metering infrastructure (AMI) system, which includes installation labor, materials, training, billing software integration, and all related appurtenances regarding the AMI system.
The Work will be awarded in one (1) Contract with an expected contract time of 180 consecutive calendar days.
The RFP package may be obtained from Carter & Sloope, Inc., 6310 Peake Road, Macon, Georgia 31210, Phone: 478-477-3923 by sending the proponent's name, address, phone number, email, and c/o name to macon_admin@cartersloope.com. All RFP packages will be sent via email as a PDF. Only proponents who are on file as having requested the RFP package will be allowed to submit on the project.
Similar Contracts
Same NAICS industry code
More opportunities from Georgia → City of Zebulon
Same awarding agency
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
