Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from North Carolina was posted on July 1, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Request for Qualifications for Progressive Design-Build Services for Commercial Burn Building

Closed
269-2026-250State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity is specifically set aside for Disadvantaged Business Enterprises (DBE) as defined by the Department of Transportation, falling under NAICS code 236220. The solicitation was posted on October 26, 2026, with a response deadline of November 4, 2026. A critical component of this contract is strict adherence to Disadvantaged Business Enterprise Good Faith Effort (GFE) requirements to secure project financing. Bidders must demonstrate comprehensive outreach and recruitment activities, including posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for at least one day prior to the bid opening. Additionally, bidders must provide proof of utilizing the Small Business Administration and the Minority Business Development Agency. Failure to submit proof of these specific public notices and agency utilizations within the bid package will result in the proposal being deemed non-responsive. Documentation for general outreach may be submitted up to three business days after the bid closing date.
RT CONTRACTOR CORP

POSTED

about 6 hours ago

DEADLINE

in 7 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the creation of a 12,920 square foot multi-story steel frame laboratory and office facility featuring shallow foundations, a metal standing seam roof, and exterior walls composed of masonry and metal panels. Comprehensive site improvements are required, including landscaping, parking, exterior lighting, telecommunications, and the installation of underground stormwater retention and utility systems. An additional option includes the construction of a 17,978 square foot laboratory facility and the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide range of scopes, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection, among others. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 6 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is a request for a single lump sum contract to perform multi-floor water damage restoration in Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. Operated by Adams and Associates, Inc. for the U.S. Department of Labor, the project follows a fire sprinkler discharge that impacted the first, second, and third floors. The scope of work includes architectural repairs such as drywall replacement, painting, ceiling tile and flooring installation, rubber wall base installation, electrical repairs, and the replacement of vanities and cabinets to restore the facility to its original condition. The total period of performance is 105 days, with substantial completion required within 90 days and final completion within an additional 15 days. This is an SBA set-aside opportunity open to small businesses, including certified veteran-owned, service-disabled veteran-owned, women-owned, and HUBZone small businesses. Award will be based on best value, evaluated through price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Bidders must attend a mandatory site visit on November 3, 2026, and submit proposals by November 17, 2026. Requirements include a valid Massachusetts Contractor's License, proof of specific automobile liability insurance naming Adams and Associates, Inc. as an additional insured, and compliance with Davis-Bacon Act wage determinations, OSHA, EPA, ADA, and NFPA-101 life safety codes. Payment terms are Net 30.
Grafton Job Corps

POSTED

about 6 hours ago

DEADLINE

in 20 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the construction of an Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. Technical requirements encompass a wide range of trades including demolition, abatement, structural steel, electrical, plumbing, and mechanical work. Key site features include rigid inclusions, load transfer mats, grounding and lightning protection, and intrusion detection systems. Site preparation involves rock excavation, grading, and mitigation for impacted wetlands, as well as the installation of access roads, paving, and telecommunications infrastructure. This opportunity is set aside for various small business categories, and interested parties must contact Rahul Maheshwari to receive bid documents before the October 31, 2026 deadline.
J & J Contractors, Inc

POSTED

about 6 hours ago

DEADLINE

in 3 days

AI Contract Overview

Show more

The City of Charlotte is soliciting Progressive Design-Build services for the construction of a new commercial burn facility at 1770 Shopton Road, Charlotte, North Carolina, through Solicitation Number 269-2026-250, with a proposal deadline of August 11, 2026. The project, classified under NAICS code 236220, involves a two-phase approach: Phase 1 focuses on design development through the Schematic Design stage to establish a Guaranteed Maximum Price (GMP) and secure necessary site development and building permits, while Phase 2 encompasses full construction, commissioning, start-up testing, and warranty services following execution of the GMP agreement. The total project budget is estimated at $13 million, with the design-build contract component alone projected between $7.5 million and $13 million. The contract will be governed by the DBIA Document No. 535, 2022 Edition, with all legal matters subject to North Carolina state law and exclusive venue in Mecklenburg County courts. The Design-Builder must collaborate closely with the City and its Advisor to define final layout and facility requirements, delivering comprehensive design documentation, construction documents, as-built records, and project manuals in compliance with the Owner’s Project Criteria and Scope of Services outlined in the attached exhibits. The evaluation process emphasizes technical merit over price, using a weighted scoring system out of 100 points across five criteria: understanding of the project and methodology (25 points), relevant experience in pricing and GMP development (25 points), qualifications and availability of key personnel (20 points), minority, women, and small business enterprise (MWSBE) participation plan (15 points), and quality and clarity of submission (10 points). Shortlisting is based on written Statement of Qualifications (SOQ) scores, with final selection determined solely by interview performance. Respondents must demonstrate a structured MWSBE inclusion strategy, submit comprehensive documentation including insurance requirements, non-discrimination certifications, and byrd anti-lobbying compliance, and provide a notarized surety letter verifying bonding capacity with a minimum A.M. Best rating of A-. Payment is structured monthly, with applications due on the 25th of each month following the Notice to Proceed, and payment issued within 30 days of receipt of a properly documented request. The Design-Builder is required to track subconsultant payments through the City’s InclusionCL

General Info

Charlotte seeks qualified firm for design-build burn facility at 1770 Shopton Road, due August 11, 2026.

Documents

6

City of Charlotte Sustainable Facilities Policy April 2024

PDF, High priority: read this firstpolicy
High

Preliminary Geotechnical Engineering Report - Commercial Burn Building Charlotte NC

PDF, High priority: read this firstgeotechnical-report
High

RFQ 269-2026-250 Progressive Design-Build Services for Commercial Burn Building

PDF, High priority: read this firstrfq
High

RFQ 269-2026-250 Progressive Design-Build Services for Commercial Burn Building

PDF, High priority: read this firstrfq
High

Annual Groundwater Monitoring and PFAS Assessment Report CLT-716

PDF, Low priorityreport
Low

Topo Survey - Shallow Soil Risk Calculator Results

PDF, Low priorityother
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyNorth Carolina → City Of Charlotte
ContactsNo contacts available
OfficeNC, USA
Office AddressNC, USA
ContactsNo contact information available

Full Description

Show more
The City of Charlotte (City) is seeking Progressive Design-Build services to design and construct a new burn facility at 1770 Shopton Rd., Charlotte, NC 28217

More opportunities from North Carolina → City Of Charlotte

Same awarding agency

NAICS: 237110
New
SLED
Storm Water Repair and Improvement FY2027-D-PR
Solicitation # FY27-ITBCon-34
The McAlpine Creek 54 inch Sanitary Sewer Rehabilitation Project Phase 3, solicitation number FY27-ITBCon-34, is a construction effort by the City of Charlotte in North Carolina to rehabilitate approximately 7,932 feet of 54 inch sanitary sewer pipe. The primary method of repair is UV cured Cured-In-Place Pipe (CIPP), with liner thicknesses ranging from 10 mm to 15 mm. The scope of work also includes the rehabilitation of associated manholes, cleaning and televising of various siphon diameters, the internal reconnection of five service laterals, temporary bypass using a diversion structure, and 30 square yards of asphalt restoration on a greenway. All work must adhere to Charlotte Water Standard Specifications and Details, with specific asphalt restoration following County details. The solicitation was posted on October 13, 2026, with a response deadline of November 10, 2026. A Small Business Enterprise (SBE) goal of 2.00 percent has been established for the project. Bidders must submit a CBI Utilization Form, and those not meeting the SBE goal at bid opening have 24 hours to submit a finalized version. While the Bonfire Procurement Portal is used for communication, construction bids must be submitted according to the Invitation to Bid instructions and not through the portal. Access to the project site inside the plant fence requires prior approval from designated personnel. The project is identified by project number PRM-40-26-284 and falls under NAICS code 237110.
Water and Sewer Line and Related Structures Construction

POSTED

1 day ago

DEADLINE

in 22 days
View Details
NAICS: 337215
SLED
Tool Storage Lockers for Rail
Solicitation # 269- 2027-2120
The City of Charlotte is soliciting bids under solicitation number 269-2027-2120 for the purchase and installation of approximately 15 tool storage lockers to support rail operations. These lockers are designed to provide secure, organized storage for critical equipment used in mechanical shops, field response, and maintenance-of-way activities, ensuring compliance with FRA, OSHA, and internal safety standards. Each locker must be between 72 to 75 inches tall, 28 to 33 inches wide, and 25 to 28 inches deep, featuring 18 to 20 window doors/compartments with a host, keypad, and badge access via proximity reader. The scope includes installation at two locations and the provision of software training. This is an indefinite quantity, unit price contract where the award will be granted to the lowest responsive and responsible bidder based on factors such as vendor experience, quality, delivery, and workmanship. All products must be new, the latest model, and shipped FOB Destination with no allowed shipping charges. Bidders must certify their responsibility regarding debarment and criminal history, and they are encouraged to commit to utilizing City Certified Small Business Enterprises. Submissions must be made electronically via the Bonfire Procurement Portal by November 23, 2026, using the required bid response forms. The contract is subject to the availability of appropriated funds and requires the vendor to provide insurance certificates meeting the city's specified requirements.
Showcase, Partition, Shelving, and Locker Manufacturing

POSTED

8 days ago

DEADLINE

in 27 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS