This Solicitation opportunity from California was posted on May 29, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Request for Qualifications for Remaining Trade Contractors #MJ0097 - Student Housing Program
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
California Polytechnic State University, San Luis Obispo is seeking qualified Trade Contractors to participate in the design-assist and delegated-design aspects of their Student Housing Program, which aims to provide nearly 15,000 beds through a combination of new construction and renovation projects over a ten-year period. The program includes three new housing developments at North Mountain and K-2 parking sites, with preliminary project costs estimated between $175 million and $275 million each, and six existing residential halls slated for renovation, with costs ranging from $24 million to $31 million per project. The projects are planned to be executed in phases starting in January 2024, with a focus on minimizing disruption to campus life and ensuring continuous student housing availability. Interested Trade Contractors are invited to respond directly to The Whiting-Turner Contracting Company, which is managing the RFQ process, with responses due by June 14, 2024. The scope of work encompasses a broad range of trades, including structural, facade, interior finishes, mechanical, electrical, and site work, among others. The solicitation emphasizes collaboration through design-assist and delegated-design roles, allowing contractors to contribute to the project's planning and execution. This initiative is part of Cal Poly’s broader master plan to support student housing needs and enhance campus infrastructure, with detailed instructions on how to request RFQ documentation provided through the designated contact.
General Info
Agency
Place of Performance
CA, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
01G ¿ Man Lifts 01H ¿ Mobile Crane 02A - Demolition 04A - Masonry 05B ¿ Metal Decking 05C ¿ Misc. Metals 05E ¿ Ornamental Metals 06A ¿ Rough Carpentry 06B ¿ Finish Carpentry 07A ¿ Waterproofing & Traffic Coatings 07B ¿ Insulation 07D ¿ Roofing 07E ¿ Sheet Metal 07F ¿ Fireproofing 07H ¿ Joint Sealants 07L ¿ Firestopping 08A ¿ Doors & Hardware 08B ¿ Overhead Doors 08C ¿ Storefronts & Windows 08E ¿ Specialty Doors 08L ¿ Louvers & Vents 09A ¿ Framing, Drywall & Plaster 09B ¿ Tile & Stone 09C ¿ Acoustical Ceilings 09D ¿ Resilient Flooring & Carpeting 09E ¿ Specialty Flooring 09F ¿ Wall Coverings 09G ¿ Painting 09H ¿ Acoustic Treatment 09L ¿ Specialty Ceilings 09M ¿ Concrete Sealers 10A ¿ Signage & Graphics 10B ¿ Partitions & Accessories 10D ¿ Wall & Corner Guards 10E ¿ Lockers 11W ¿ Facade & Window Equipment 12B ¿ Window Coverings 14A ¿ Elevators 14B ¿ Trash & Recycling Chutes 25A ¿ Controls 27A ¿ Low Voltage 27B ¿ Audio-Video Systems 28A ¿ Security & Safety 32A ¿ Asphalt Paving 32B ¿ Site Concrete 32C ¿ Unit Paving 32D ¿ Pavement Markings 32G ¿ Fencing & Gates
SEE ATTACHED ANNOUNCEMENT FOR DETAILS OF HOW TO REQUEST THE RFQ DOCUMENTATION FROM WHITING-TURNER.
RESPONSES ARE TO BE PROVIDED DIRECTLY TO WHITING-TURNER ONLY
PROGRAM SCOPE: The 2035 Master Plan accounts for nearly 15,000 beds of student housing to accommodate the first and second year live-on requirements as well as maintaining housing for transfer and returning upper division students. To begin to meet this need, the University intends to design and construct three (3) new student housing projects at the current North Mountain and K-2 parking sites and renovate six (6) existing residential halls at the current South Maintain site.
Presently, the intent is to use a phased approach for three new construction projects and six renovation projects over the course of the ten-year Program, starting design in January 2024. Projects would be completed strategically to reduce the impact to campus life and allow for students to continue with no interruption.
Preliminary Design-Build cost estimates for the three new housing projects range from $175M to $275M each, with the six renovation projects ranging from $24M to $31M each.
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
