Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Nebraska was posted on October 8, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Request for Quotes - North Downtown Streetscape Revitalization

Closed
403State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an infrastructure initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes site preparation activities such as land surveying, site clearing, subsurface investigation, and shoring; pipeline and utility installation involving tunneling, boring, jacking, and cathodic protection; and surface improvements including asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting. Required materials and services also encompass ready mix supply, precast concrete, and the implementation of storm water pollution prevention measures. This solicitation is open to qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. Responsive bidders must possess a valid California Contractor's license, provide acceptable insurance, and be capable of providing bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Bidders are encouraged to demonstrate an ability to maintain labor harmony, noting that Kiewit is a signatory to several collective bargaining agreements. Quotes must be submitted via the Building Connected system by the deadline of November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

about 3 hours ago

DEADLINE

in 21 days
NAICS: 237310
New
SLED
Environmental Trust Department, Owhi Flats 2026
Solicitation # Owhi-Flats-RFB-2026.pdf
The Confederated Tribes of the Colville Reservation Environmental Trust Department is soliciting bids for the Owhi Flats 2026 watershed restoration project located within the Little Nespelem RMU. This firm-fixed-price construction contract involves decommissioning six road segments totaling 17,393 feet and installing two tank traps to improve water quality, enhance riparian habitat, and reduce road density impacts on wildlife. The scope of work includes decompacting road surfaces, applying straw mulch and woody debris, removing all non-natural materials such as culverts for approved disposal, and seeding surfaces back to natural vegetation. All work must adhere to Best Management Practices and specific Tribal Law and Order Codes regarding forest practices, water quality, hydraulic practices, fire management, and industrial safety. Selection will be awarded to the lowest responsive and responsible bidder who demonstrates specific experience in road decommissioning, stream crossings, and bank stabilization. Bidders must provide proof of at least 1,000,000 dollars in liability insurance and submit a complete bid packet including a work plan, equipment list, and Sams.gov registration. This solicitation is subject to Indian Preference and Tribal Employment Rights Ordinance (TERO) regulations, requiring a minimum of 51 percent of seasonal or temporary employees to be of Indian preference. Additionally, a 5 percent employment rights fee applies to contracts of 5,000 dollars or more. Sealed proposals must be received by 2 P.M. on October 29, 2026.
Confederated Tribes of the Colville Reservation

POSTED

about 8 hours ago

DEADLINE

in about 22 hours
NAICS: 237310
New
SLED
Silverbell Road Roadway Improvements - El Camino del Cerro to Goret Road
Solicitation # 270146
The Silverbell Road Roadway Improvements project, solicitation number 270146, is a major infrastructure initiative by the City of Tucson's Department of Transportation and Mobility. The project involves the reconstruction and widening of 3.27 miles of roadway, specifically 2.63 miles of Silverbell Road from 0.25 miles north of El Camino Del Cerro to 0.2 miles north of Goret Road, 0.50 mile of El Camino Del Cerro, and 0.14 mile of Sweetwater Drive. The scope of work includes the construction of four roadway lanes with medians, curbs, sidewalks, a multi-use path, traffic signals, street lighting, landscaping, irrigation, drainage facilities, and extensive utility work. The estimated price range for the project exceeds 10 million dollars. The contract is divided into two primary phases: a 730-calendar day construction phase and a subsequent 730-calendar day landscape establishment period. Bids are evaluated based on responsiveness and responsibility, with the award granted to the lowest responsive and responsible bidder. Key requirements include a bid security of 10 percent of the total offer and a 5 percent Small Business Enterprise participation goal. The project must adhere to various standards, including the 2015 Pima Association of Governments specifications and HUD guidelines for federally funded programs. Additionally, contractors must comply with stringent data protection and cybersecurity frameworks, ADA requirements, and environmental restrictions regarding herbicide use in protected washes.
Transportation & Mobility

POSTED

about 9 hours ago

DEADLINE

in 23 days
NAICS: 237310
New
SLED
Transit Area Asphalt Resurfacing
Solicitation # 26-044
The Transit Area Asphalt Resurfacing project, solicitation number 26-044, is a municipal construction contract for the City of Turlock, California, with an engineer's estimate of 233,000.00 dollars. The scope of work involves the cold milling and removal of a two-inch asphalt concrete layer, scarifying the native subgrade to 95 percent relative compaction, and applying a new asphalt concrete overlay across approximately 28,400 square feet of pavement at an active Transit Corporation Yard. The project concludes with the installation of permanent thermoplastic striping for bus parking stalls, which must be performed seven calendar days after paving to allow for proper curing. Due to the facility's role in daily CNG bus fueling, the project is subject to strict operational constraints, requiring work to be phased within tight weekend-only windows. The contract will be awarded to the lowest responsive and responsible bidder possessing either a Class A General Engineering or Class C-12 Earthwork and Paving contractor license. Required securities include bid and indemnity bonds of at least 10 percent of the bid amount, and performance and payment bonds equal to 100 percent of the contract price. All work must adhere to California prevailing wage rates for Stanislaus County and City of Turlock Standard Specifications. Performance is tightly scheduled, with substantial completion required within ten days of the Notice to Proceed.
Municipal Services-Engineering

POSTED

about 10 hours ago

DEADLINE

in 7 days
NAICS: 237310
New
SLED
Pedestrian Crossing Safety Improvements (FHWA)
Solicitation # 2025-041
The Pedestrian Crossing Safety Improvements project, solicitation number 2025-041, is a public works contract issued by the Seattle Department of Transportation with an estimated value between 3,250,000 and 3,350,000 dollars. The scope of work involves comprehensive infrastructure and safety enhancements across multiple locations in Washington, including 15th Ave S and Lander St, 33rd Ave S and Myrtle Pl, and several intersections along Rainier Ave S and Beacon Ave S. Key deliverables include the removal and restoration of sidewalks and pavement, installation of pedestrian islands, curbs, curb ramps, drainage structures, and the implementation of RRFB and traffic signals, signing, and channelization. The project also specifically includes electrical and rebar installation. The contract must be physically completed within 120 working days from the Notice to Proceed. Award will be granted to the lowest responsive bidder who meets mandatory and supplemental responsibility criteria, with a tie-breaker preference for the highest use of recycled materials. Compliance requirements are extensive, including a 13 percent Federal Small Business Enterprise goal, adherence to Buy America mandates, and compliance with Federal and State prevailing wage rates. Bidders must provide a bid guaranty of five percent of the total bid and are required to be registered with the federal System for Award Management. Submissions are primarily handled through the OpenGov portal, and the project adheres to the Americans with Disabilities Act and various City of Seattle and APWA general standard provisions.
Public Works

POSTED

about 11 hours ago

DEADLINE

in 8 days

AI Contract Overview

Show more

The City of Fremont, Nebraska, is seeking a qualified firm to collaborate with city staff on the development, design, bidding, and construction administration for the North Downtown Streetscape Revitalization Project. This initiative encompasses several key areas, including portions of North Broad Street East, North Main Street West, East 8th Street North and South, and East 8th Street South, focusing on sidewalk improvements from 9th to 8th Streets, as well as enhancements along Main Street to Military Avenue. The project aims to upgrade the streetscape with features such as landscaping, sidewalks, accessible curb ramps, bump outs, decorative pavement, street lighting, bike racks, bollards, benches, parking and curb improvements, columns, fencing, traffic calming measures, signage, and three prominent archways at designated intersections. The contract solicitation, titled "Request for Quotes - North Downtown Streetscape Revitalization," was posted on October 8, 2025, with a deadline for responses set for November 7, 2025. The project has an estimated value ranging from two to five million dollars and falls under NAICS code 237310, which pertains to highway, street, and bridge construction. Interested firms can find additional details and submit their proposals through the city’s bidding portal. The project emphasizes comprehensive streetscape enhancements to improve aesthetics, accessibility, and traffic flow within the downtown area, contributing to the community’s revitalization efforts.

General Info

Documents

15

Attachment A - City Job Class Specifications and Salary Ranges

PDF, High priority: read this firstspecifications
High

City of Santa Monica Temporary Staffing Services RFP 2024

PDF, High priority: read this firstrfp
High

City of Santa Monica Temporary Staffing Services RFP Feb 21 2024

PDF, High priority: read this firstrfp
High

Cowlitz County: 2024 Unit Price Guardrail Installation and Repair Project

PDF, High priority: read this firstitb
High

Cowlitz County Project No. 2216 - 2024 Unit Price Guardrail Installation and Repair

PDF, High priority: read this firstifb
High

Cowlitz County Project No. 2216 - 2024 Unit Price Guardrail Installation and Repair

PDF, High priority: read this firstifb
High

ITB403 Bid Schedule for Work Zone Trucks

XLSX, High priority: read this firstbid-schedule
High

ITB 403 Work Zone Safety Trucks - Idaho DOT

DOCX, High priority: read this firstitb
High

ITB 403 Work Zone Safety Trucks Idaho DOT

DOCX, High priority: read this firstitb
High

Professional Services Agreement - City of Santa Monica and ABC Corporation

DOCX, High priority: read this firstcontract-document
High

Proposer RFP Checklist

PDF, High priority: read this first1 page · checklist
High

State of Idaho Contract Terms and Conditions ITB403 2024

PDF, High priority: read this firstcontract-terms-and-conditions
High

ITB 403 Work Zone Safety Trucks Signature Page

DOCX, Low prioritysignature-page
Low

Professional Services Agreement Insurance Requirements Template

DOCX, Low priority3 pages · other
Low

Solicitation Instructions Idaho Division of Purchasing Jan 2017

PDF, Low priority6 pages · other
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

5 updates
PhaseClosed
Posted

Solicitation

Notice updated

Response deadline changed from Jun 21, 2016 to Sep 26, 2024. The notice title changed. The notice description changed. The point of contact changed.

Notice updated

Response deadline changed from Sep 26, 2024 to Aug 19, 2024. The notice title changed. The notice description changed. The point of contact changed.

Notice updated

Response deadline changed from Aug 19, 2024 to Sep 30, 2024. The notice title changed. The notice description changed. The point of contact changed.

Notice updated

Response deadline changed from Sep 30, 2024 to Jan 30, 2025. The notice title changed. NAICS code added: 441110. The notice description changed. The point of contact changed.

Notice updated

Response deadline changed from Jan 30, 2025 to Nov 7, 2025. The notice title changed. NAICS code changed from 441110 to 237310. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyNebraska → City of Fremont
ContactsNo contacts available
OfficeN/A
Organization / AgencyNebraska → City of Fremont
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Intent: The City of Fremont, Nebraska is seeking a qualified firm to work with City staff to develop, design, bid, and provide construction administration services for a plan for the North Downtown Streetscape Revitalization Project. Background The project will be the following areas:N Broad Street East including Sidewalk from 9th Street to 8th Street, N Main Street West including Sidewalk from 9th Street to 8th Street,E 8th Street North and South including Sidewalk from Broad Street to Main Street East 8th Street South including Sidewalk from Main Street to D Street. N Main Street East and West including Sidewalk from Main to Military  The project will construct streetscape improvements including landscaping, sidewalks/trails, accessible curb ramps, bump outs, decorative pavement, street lighting, bike racks, bollards, benches, parking/curb and gutter, columns, fencing, traffic calming features, signage, and three archways: Park Ave and 8th Street, gateway to the amphitheater at Military Ave and Main Street, and 6th Street and Broad Street.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS