Request for White Paper_Landing Gear Test Facility (LGTF) Drop Tower Modernization Prototype Project

Closed
FA910126RWP_LGTFDropTowerFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The Government is seeking white papers from qualified industry parties to explore innovative, turnkey solutions for the complete redesign, fabrication, and installation of a new carriage and variable weight system for Drop Towers 2, 3, and 4 at the Landing Gear Test Facility on Wright-Patterson Air Force Base in Ohio. This Request for White Paper is a market research action intended solely to assess industrial capabilities, refine technical requirements, and identify potential vendors for a future Request for Project Proposal, with no commitment to award a contract at this stage. Respondents must demonstrate a comprehensible and feasible technical approach that leverages existing tower infrastructure, including guide rails, control systems, and Data Acquisition architecture, while ensuring seamless integration without modification. Key deliverables include a complete system design package with a finalized Process and Instrumentation Diagram and functional digital model, an Interface Control Document, and a comprehensive As-Built Technical Data Package containing engineering drawings, material specifications, design calculations, and Operation & Maintenance manuals, alongside a life-cycle analysis with a recommended spare parts list and a Rough Order of Magnitude cost estimate for the entire project. Performance must adhere to OSHA, ANSI, and applicable MIL-STDs for machinery and lifting devices, with final acceptance contingent upon a government-witnessed Site Acceptance Test verifying weight range and increment requirements. All respondents must be registered in SAM, possess a valid CAGE code and UEI, and meet stringent cybersecurity and export control requirements, including current CMMC Level 2 self-assessment in the Supplier Performance Risk System and active certification in the Joint Certification Program due to the Controlled Unclassified Information designation of the Statement of Objectives, which must be requested separately from the Agreements Officer. Submissions are limited to 20 pages in PDF format and must be emailed to Brooke Vandeman by the revised deadline of July 15, 2026, and must include detailed corporate experience with heavy-load mechanical systems, a notional schedule predicated on a FY26 award, risk assessments, and justification for compliance with 10 U.S.C. § 4022 through participation by nontraditional defense contractors, small businesses, or non-Federal cost share. The Government may invite select respondents for further concept presentations, and all proposals must reflect a clear path to a fully integrated, safely operable, and sustainably maintained system, with the ultimate goal of enabling future procurement actions based on market insights gained from this white paper submission process.

General Info

Government seeks engineering firms for turnkey redesign, fabrication, installation of landing gear test systems.

NAICS

336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing

Place of Performance

Wright Patterson AFB, OH, USA

Set-Aside

NONE

Documents

2

Request for White Paper LGTF Drop Tower Modernization

PDF, High priority: read this firstrequest-for-white-paper
High

Request for White Paper LGTF Drop Tower Modernization Amendment 01

PDF, High priority: read this firstrwp
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

Response deadline changed from Jul 1, 2026 to Jul 15, 2026. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA9101 Aedc Pkp Procrmnt Branch
Contacts2 people available
OfficeARNOLD AFB, TN, 37389-1332, USA
Office AddressARNOLD AFB, TN, 37389-1332, USA
Contacts
Brooke Vandeman

Full Description

Show more

*Amendment 01 to RWP issued to extend white paper submission due date from 1 July 2026 to 15 July 2026.


The Government is seeking White Papers from interested parties with the engineering and manufacturing capability to execute the complete redesign, fabrication, and installation of a new carriage and variable weight system for the Landing Gear Test Facility (LGTF) Drop Towers 2, 3, and 4 located on Wright-Patterson Air Force Base (AFB) in Ohio.


The primary goal of this Request for White Paper (RWP) is to identify potential solutions and innovative industrial approaches to meet the technical objectives detailed in the attached Statement of Objectives (SOO), Attachment 1. The focus of the white paper should be on a comprehensive, turnkey approach that ensures the successful integration, safe operation, and long-term sustainment of the final system. The Government will use the submitted White Papers to assess industry capabilities, refine project requirements, and select vendors for a potential future Request for Project Proposal (RPP).

More opportunities from Department Of Defense → FA9101 Aedc Pkp Procrmnt Branch

Same awarding agency

NAICS: 333517
New
Federal
CNC Small Wire EDM
Solicitation # FA9101CNCSmallWireEDM
The Department of the Air Force is issuing a Sources Sought Notice to identify capable small and large businesses for the procurement of a new, fully functional Small CNC Wire Electrical Discharge Machining (EDM) machine for the Arnold Engineering Development Complex (AEDC) at Arnold Air Force Base, Tennessee. The required equipment must support submerged and non-submerged machining, automatic wire threading and alignment, and U-V taper cutting, with minimum axis travel of 15.5 inches for X, 11.5 inches for Y, 8.5 inches for Z, and plus or minus 2.4 inches for U and V. The machine must be compatible with a 480V, 3PH, 60 HZ electrical system and be built to NFPA 79 standards. Delivery is required within 90 days of order receipt, with the contractor providing assembly, startup, and functional testing based on ISO/ANSI standards at the AEDC Model Shop. The government requires a minimum 24-month warranty after installation and a 10-year accuracy guarantee on the linear drive system. Additionally, the contractor must provide two days of formal on-site operator training for up to five people and two days of maintenance training for up to five workers. Service support requirements include a 36-hour on-site repair response time and a 48-hour delivery window for repair parts. Interested respondents under NAICS code 333517 must submit company information, SAM UEI and CAGE codes, a compliance matrix, product literature, and past performance data to the contracting office by November 2, 2026.
Machine Tool Manufacturing

POSTED

1 day ago

DEADLINE

in 5 days
View Details
NAICS: 333994
New
Federal
New Heat Treat Equipment
Solicitation # FA9101NHT
The Air Force Test Center’s Installation Contracting Division is conducting market research through a Sources Sought Notice to identify capable small and large businesses for the turnkey procurement, delivery, installation, and commissioning of a new Surface Combustion Allcase Batch Integral Quench Furnace Line. Located at Holloman Air Force Base in Building 1185, the project includes the installation of a Uni-DRAW Temper Furnace and a Spray/Dunk Wash Unit. The selected contractor will be responsible for all specialized engineering, rigging, and labor, ensuring the system is fully operational and compliant with NFPA 86, AMS 2750, OSHA 29 CFR 1910, and NEC/NFPA 70 standards. The performance timeline involves a 4 to 6 week kickoff and drawing phase, followed by a manufacturing lead time of approximately 52 to 78 weeks. On-site installation is expected to take 4 to 6 weeks, with an additional 2 to 3 weeks for commissioning and handover. Formal acceptance requires a successful three-cycle production demonstration and the sign-off of an Engineering Release Form. Additionally, the contractor must provide a two-year extended warranty and comprehensive on-site training for operators and maintenance personnel. Interested respondents must submit their company information, UEI number, technical solutions, budgetary estimates, and delivery timelines by November 2, 2026.
Industrial Process Furnace and Oven Manufacturing

POSTED

3 days ago

DEADLINE

in 5 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS