This Solicitation opportunity from Department Of Defense was posted on June 26, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Request for White Paper_Landing Gear Test Facility (LGTF) Drop Tower Modernization Prototype Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The Government is seeking white papers from qualified industry parties to explore innovative, turnkey solutions for the complete redesign, fabrication, and installation of a new carriage and variable weight system for Drop Towers 2, 3, and 4 at the Landing Gear Test Facility on Wright-Patterson Air Force Base in Ohio. This Request for White Paper is a market research action intended solely to assess industrial capabilities, refine technical requirements, and identify potential vendors for a future Request for Project Proposal, with no commitment to award a contract at this stage. Respondents must demonstrate a comprehensible and feasible technical approach that leverages existing tower infrastructure, including guide rails, control systems, and Data Acquisition architecture, while ensuring seamless integration without modification. Key deliverables include a complete system design package with a finalized Process and Instrumentation Diagram and functional digital model, an Interface Control Document, and a comprehensive As-Built Technical Data Package containing engineering drawings, material specifications, design calculations, and Operation & Maintenance manuals, alongside a life-cycle analysis with a recommended spare parts list and a Rough Order of Magnitude cost estimate for the entire project. Performance must adhere to OSHA, ANSI, and applicable MIL-STDs for machinery and lifting devices, with final acceptance contingent upon a government-witnessed Site Acceptance Test verifying weight range and increment requirements. All respondents must be registered in SAM, possess a valid CAGE code and UEI, and meet stringent cybersecurity and export control requirements, including current CMMC Level 2 self-assessment in the Supplier Performance Risk System and active certification in the Joint Certification Program due to the Controlled Unclassified Information designation of the Statement of Objectives, which must be requested separately from the Agreements Officer. Submissions are limited to 20 pages in PDF format and must be emailed to Brooke Vandeman by the revised deadline of July 15, 2026, and must include detailed corporate experience with heavy-load mechanical systems, a notional schedule predicated on a FY26 award, risk assessments, and justification for compliance with 10 U.S.C. § 4022 through participation by nontraditional defense contractors, small businesses, or non-Federal cost share. The Government may invite select respondents for further concept presentations, and all proposals must reflect a clear path to a fully integrated, safely operable, and sustainably maintained system, with the ultimate goal of enabling future procurement actions based on market insights gained from this white paper submission process.
General Info
Agency
NAICS
Place of Performance
Wright Patterson AFB, OH, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
*Amendment 01 to RWP issued to extend white paper submission due date from 1 July 2026 to 15 July 2026.
The Government is seeking White Papers from interested parties with the engineering and manufacturing capability to execute the complete redesign, fabrication, and installation of a new carriage and variable weight system for the Landing Gear Test Facility (LGTF) Drop Towers 2, 3, and 4 located on Wright-Patterson Air Force Base (AFB) in Ohio.
The primary goal of this Request for White Paper (RWP) is to identify potential solutions and innovative industrial approaches to meet the technical objectives detailed in the attached Statement of Objectives (SOO), Attachment 1. The focus of the white paper should be on a comprehensive, turnkey approach that ensures the successful integration, safe operation, and long-term sustainment of the final system. The Government will use the submitted White Papers to assess industry capabilities, refine project requirements, and select vendors for a potential future Request for Project Proposal (RPP).
More opportunities from Department Of Defense → FA9101 Aedc Pkp Procrmnt Branch
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS
