Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Sources Sought CNC Small Wire EDM

Active
FA9101CNCSmallWireEDMFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

333517 - Machine Tool Manufacturing

Place of Performance

0, TN, 37389, USA

Set-Aside

NONE

Documents

2

CNC+Small+Wire+EDM+Spec.pdf

PDF

Sources+Sought+CNC+Small+Wire+EDM.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseSources Sought
Posted

Sources Sought

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA9101 Aedc Pkp Procrmnt Branch
Contacts2 people available
OfficeARNOLD AFB, TN, 37389-1332, USA
Office AddressARNOLD AFB, TN, 37389-1332, USA
Contacts

Full Description

Show more

This is a Sources Sought Notice to determine the availability and technical capability of small
and large businesses to meet the Government’s requirement for a new, fully functional Small
Computer Numerical Control (CNC) Wire Electrical Discharge Machining (EDM) machine for
the Arnold Engineering Development Complex (AEDC), Arnold AFB, Tennessee, IAW
Attachment 1 – Small CNC Wire EDM Technical Specification Sheet.

Similar Contracts

Same NAICS industry code

NAICS: 333517
New
Federal
Recuperator Press Modification Replacement
Solicitation # W911KF-25-S-C002-A0017
The Army Contracting Command-Anniston Army Depot is seeking innovative commercial solutions under solicitation W911KF-25-S-C002-A0017 to modify or replace a legacy 60-ton 4-cylinder hydraulic recuperator press located in Building 133. The required solution must serve as a restraining fixture capable of withstanding reaction loads of approximately 100,000 pounds when cores are pressurized to 250 psig. Key technical specifications include the ability to ramp loads from 0 to 20,000 lbs with a tolerance of +/- 25 lbs, reach a final pneumatic load of 250 psig with a tolerance of +/- 1 psig, and utilize a control system capable of storing at least 2,500 timestamped test reports. All equipment must adhere to commercial safety and manufacturing standards such as ISO, ANSI, UL, and CE. The government will utilize a merit-based evaluation focusing on technical and innovative merit and delivery and lifecycle sustainment, with price serving as a secondary factor to ensure fairness and funding availability. Critical compliance requirements include registration in the System for Award Maintenance and strict adherence to the Trade Agreements Act and DFARS 252.225-7001, requiring offerors to explicitly identify the country of origin for all equipment. The expected award is slated for FY27 with a performance period of 6 to 12 months. Written solutions are due by October 28, 2026, and must be submitted via email to the designated contracting officials.
W6QK Acc Anad

POSTED

5 days ago

DEADLINE

in about 23 hours
View Details
NAICS: 333517
New
SLED
CDCR-DRP DESKTOP MILL AND DESKTOP LATHE
Solicitation # 10846575-1
The California Department of Corrections and Rehabilitation, Division of Rehabilitative Programs, is soliciting quotes for the acquisition of ten Desktop CNC 3-Axis Mills and eight Desktop CNC Lathes. This equipment is designated for the Career Technical Education Manufacturing, Design and Engineering Program serving incarcerated individuals at the Central California Womens Facility and the Correctional Institution for Women. The scope of work includes the delivery of new, current-model machinery, installation on locking mobile and stationary toolboxes, and the provision of a five-year service contract and preventive maintenance plan. Additionally, the contractor must provide eight hours of initial onsite operational training per machine and annual refresher training for up to five instructors per institution for five years. The procurement follows a Value-Effective award methodology, with a weighted scoring system consisting of technical requirements at 60 percent, the deliverables table at 30 percent, and cost at 10 percent. Proposals must be submitted in two separate emails to the designated contact by November 3, 2026, with one email containing administrative and technical documents and the other containing the cost proposal. Bidders are required to provide various certifications, including California Civil Rights Laws and DVBE declarations, and must disclose any use of Generative AI in their deliverables. All equipment must be delivered F.O.B. Destination within 90 days of the agreement.
California Department of Corrections & Rehabilitation

POSTED

6 days ago

DEADLINE

in 7 days
View Details

More opportunities from Department Of Defense → FA9101 Aedc Pkp Procrmnt Branch

Same awarding agency

NAICS: 333994
New
Federal
New Heat Treat Equipment
Solicitation # FA9101NHT
The Air Force Test Center’s Installation Contracting Division is conducting market research through a Sources Sought Notice to identify capable small and large businesses for the turnkey procurement, delivery, installation, and commissioning of a new Surface Combustion Allcase Batch Integral Quench Furnace Line. Located at Holloman Air Force Base in Building 1185, the project includes the installation of a Uni-DRAW Temper Furnace and a Spray/Dunk Wash Unit. The selected contractor will be responsible for all specialized engineering, rigging, and labor, ensuring the system is fully operational and compliant with NFPA 86, AMS 2750, OSHA 29 CFR 1910, and NEC/NFPA 70 standards. The performance timeline involves a 4 to 6 week kickoff and drawing phase, followed by a manufacturing lead time of approximately 52 to 78 weeks. On-site installation is expected to take 4 to 6 weeks, with an additional 2 to 3 weeks for commissioning and handover. Formal acceptance requires a successful three-cycle production demonstration and the sign-off of an Engineering Release Form. Additionally, the contractor must provide a two-year extended warranty and comprehensive on-site training for operators and maintenance personnel. Interested respondents must submit their company information, UEI number, technical solutions, budgetary estimates, and delivery timelines by November 2, 2026.
Industrial Process Furnace and Oven Manufacturing

POSTED

1 day ago

DEADLINE

in 6 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS