Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Broad Agency Announcement N00024-19-R-4145 invites research and development proposals focused on advancing naval power and energy systems to support the future fleet, with an emphasis on integrated power and energy architectures, energy storage, power conversion, distribution, prime movers, rotating machinery, thermal management, and intelligent control systems. The announcement remains open until February 6, 2033, with white papers submitted at any time during that period being considered for selection. Only unclassified submissions are accepted via email to the designated technical point of contact, and offerors must demonstrate technical innovation aligned with the 2019 Naval Power and Energy Systems Technology Development Roadmap, particularly in areas that improve power density, energy efficiency, survivability, modularity, and cyber-secure control. The Navy is especially interested in technologies that enable flexible, scalable, and open-architecture systems capable of supporting high-energy weapons, advanced sensors, and unmanned platforms, with a strong preference for solutions that reduce life-cycle costs and carbon footprint. Proposals must be submitted as white papers first, limited to 25 pages, and must include a technical concept, naval relevance, past performance evidence, cost and schedule estimates, data rights assertions, and proof of an approved or正在审核的 accounting system. Selected respondents will be invited to submit full proposals under a separate Request for Proposal. Awards may be made as contracts, cooperative agreements, or other transaction agreements, primarily under Cost Plus Fixed Fee terms. The Naval Sea Systems Command retains full rights to select all, some, or none of the submissions, and no reimbursement is provided for proposal development. All submissions are treated as competition-sensitive, and proposals must not contain classified information unless explicitly flagged. The primary point of contact for administrative matters is Mr. William Jee, Procuring Contracting Officer, with technical inquiries directed to PMS 460. The BAA emphasizes model-based engineering, digital twin environments, and hardware-in-the-loop testing as key evaluation pathways, with the ultimate goal of transitioning high-TRL technologies into next-generation naval platforms through rapid prototyping and iterative development.

General Info

NAVSEA seeks innovative naval power system R&D proposals, deadline February 6, 2028, five-year CPFF contracts.

Agency

Department Of Defense → Navsea HqView Agency

NAICS

335311 - Power, Distribution, and Specialty Transformer ManufacturingView NAICS

Place of Performance

TBD, DC, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

6 updates
PhaseCombined Synopsis
Posted

Combined Synopsis

Amendment 1

Contract was updated

Amendment 2

Contract was updated

Amendment 3

Contract was updated

Amendment 4

Contract was updated

Amendment 5

Contract was updated

Amendment 6

Contract was updated

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navsea Hq
Contacts1 person available
OfficeWASHINGTON NAVY YARD, DC, 20376-5000, USA
Organization / Agency
Department Of Defense → Navsea Hq
View Agency Profile
Office AddressWASHINGTON NAVY YARD, DC, 20376-5000, USA
Contacts

Full Description

Show more

(MODIFICATION POSTED 05 AUGUST 2026)


This is a modification to Broad Agency Announcement (BAA) N00024-19-R-4145. The purpose of this modification is to update the Technical Point of Contact (POC). Effective immediately, the Technical POC is changed from Josh Cushenette to Jim Dempsey. All technical inquiries and correspondence should be directed to Mr. Dempsey at james.a.dempsey.civ@us.navy.mil.


-------------------------------------------------------------------------------------------------------------------


(PLEASE SEE LATEST BAA ANNOUNCEMENT WITHIN, POSTED 02 APRIL 2020)


This is a modification to the Broad Agency Announcement (BAA) N00024-19-R-4145 to extend the date for receipt of white papers and full proposals to 6 February 2033 and correct some administrative information.  Any white papers that have already been submitted do not need to be resubmitted.  Included in this modification to the BAA is revision to the Power Controls section to augment the desired technology interests.  Included in this modification to the BAA is the identification of an electronic mail submission address for white papers.  Included in this modification to the BAA is also a change to the identified Procuring Contracting Officer and Contract Specialist.  The NAVSEA Points of Contact (POC) are changed as follows: the Primary Point of Contact remains Mr. William Jee, Procuring Contracting Officer, william.j.jee.civ@us.navy.mil


 All other information contained in the prior announcements through Apr 02, 2020 remain unchanged.


-------------------------------------------------------------------------------------------------------------------


(PLEASE SEE LATEST BAA ANNOUNCEMENT WITHIN, POSTED 04 JUNE 2019)


I. ADMINISTRATIVE INFORMATION


This publication constitutes a Broad Agency Announcement (BAA), as contemplated in Federal Acquisition Regulation (FAR) 6.102(d)(2). A formal Request for Proposals (RFP), solicitation, and/or additional information regarding this announcement will not be issued or further announced. This announcement will remain open for approximately one year from the date of publication or until extended or replaced by a successor BAA. Initial responses to this announcement must be in the form of White Papers. Proposals shall be requested only from those offerors selected as a result of the scientific review of the White Papers made in accordance with the evaluation criteria specified herein. White Papers may be submitted any time during this period. Awards may take the form of contracts, cooperative agreements, or other transactions agreements.


The Naval Sea Systems Command (NAVSEA) will not issue paper copies of this announcement. NAVSEA reserves the right to select for proposal submission all, some, or none from among the white papers submitted in response to this announcement. For those who are requested to submit proposals, NAVSEA reserves the right to award all, some, or none of the proposals received under this BAA. NAVSEA provides no funding for direct reimbursement of white paper or proposal development costs. Technical and cost proposals (or any other material) submitted in response to this BAA will not be returned. It is the policy of NAVSEA to treat all white papers and proposals as competition sensitive information and to disclose their contents only for the purposes of evaluation.



White papers submitted under N00024-10-R-4215 that have not resulted in a request for a proposal are hereby considered closed-out and no further action will be taken on them. Unsuccessful offerors under N00024-10-R-4215 are encouraged to review this BAA for relevance and resubmit if the technology proposed meets the criteria below. Contract awards made under N00024-10-R-4215 and under this BAA will be announced following the announcement criteria set forth in the FAR.



II. GENERAL INFORMATION



1. AGENCY NAME
Naval Sea Systems Command (NAVSEA)
1333 Isaac Hull Ave SE
Washington, DC 20376



2. RESEARCH OPPORTUNITY TITLE


Research and Development of Naval Power and Energy Systems



3. RESPONSE DATE


This announcement will remain open through the response date indicated or until extended or replaced by a successor BAA. White Papers may be submitted any time during this period.



4. RESEARCH OPPORTUNITY DESCRIPTION



4.1 SUMMARY



NAVSEA, on behalf of the Electric Ships Office (PMS 460, organizationally a part of the Program Executive Office Ships) is interested in White Papers for long and short term Research and Development (R&D) projects that offer potential for advancement and improvements in current and future shipboard electric power and energy systems at the major component, subsystem and system level. The mission of PMS 460 is to develop and provide smaller, simpler, more affordable, and more capable ship power systems to the Navy by defining open architectures, developing common components, and focusing Navy, industry, and academia investments. PMS 460 will provide leadership of the developments identified as part of this BAA, will direct the transition of associated technologies developed by the Office of Naval Research (ONR), and will manage the technology portfolio represented by Program Element (PE) 0603573N (Advanced Surface Machinery Systems) for transition into existing and future Navy ships.



4.2 NAVAL POWER AND ENERGY SYSTEMS TECHNOLOGY DEVELOPMENT ROADMAP



Naval power and energy systems are described in detail in the 2019 Naval Power and Energy Systems Technology Development Roadmap (NPES TDR). The NPES TDR focuses and aligns the power system investments for the Navy, Defense Department, industry and academia to guide future research and development investments to enable the Navy to leverage these investments to meet its future needs more affordably. Included in the NPES TDR are specific recommendations and opportunities for near, mid and long term investments, with a renewed focus on energy management. These opportunities range from an energy magazine to support advanced weapons and sensors to the development of an Integrated Power and Energy System (IPES). The NPES TDR aligns electric power system developments with war fighter needs and enables capability-based budgeting. The NPES TDR is responding to the emerging needs of the Navy, and while the plan is specific in its recommendations, it is inherently flexible enough to adapt to the changing requirements and threats that may influence the 30-year ship acquisition plan. The first section of the roadmap establishes why NPES are a critical part of the kill chain based on the capabilities desired by the Navy in the near term, as well as supporting future platforms in the Navys 30-year shipbuilding plan. The second section of the roadmap presents power and energy requirements that are derived from mission systems necessary to support future warfighting needs. The third section describes required initiatives based on capabilities and the projected electrical requirements of the future ships.



4.3 FOCUS AREAS



The areas of focus for this BAA include, but are not limited to, the "FYDP/NEAR-TERM" activities as described throughout the NPES TDR; the analysis, development, risk reduction and demonstration of future shipboard (both manned and unmanned) electric power systems and components, emphasizing shipboard power generation, electric propulsion, power conversion, energy storage, distribution and control; power quality, continuity, and system stability; electric power system and component level modeling and simulation; energy storage technologies; electrical system survivability; and power system simplicity, upgradeability, flexibility, and ruggedness. The Integrated Power and Energy System (IPES) architecture provides the framework for partitioning the equipment and software into modules and defines functional elements and the power/control and information relationships between them. For power generation, high power distribution, propulsion, and large loads, the architecture includes Medium Voltage AC power (with emphasis on affordability), and Medium Voltage DC power (with emphasis on power density and fault management). For ship service electrical loads, the architecture includes zonal electrical distribution which may be either AC or DC, depending upon the specific application. Also of particular interest are technologies that result in significant energy efficiency, power density improvements and/or carbon footprint improvements over existing propulsion and power system technologies. The NPES TDR partitions the power system in to functional areas that include the following.



4.3.1 ENERGY STORAGE



Energy storage modules may support short duration to long duration energy storage applications, which utilize a combination of technologies to minimize power quality and continuity impacts across the system. For the short duration energy storage applications, the module should provide hold-up power to uninterruptible loads for fault clearing and transient isolation, as well as load leveling for pulse power loads. For the mid duration, the module should provide up to approximately 3MW (100 - 150 kW-hr) of standby power for pulse power loads while also providing continuity of operations for a subset of equipment between uninterruptible and full ships load (including emergency power generation starting in a dark ship condition). For long duration applications, energy storage modules should provide the required power as an emergency backup system or to provide increased stealth for specialty equipment. The required duration for this type of application may extend up to days or longer, and may be intermittent or continuous. A number of energy storage technologies for future ship applications are of interest to the Navy, including various electrochemical, capacitor-based, or rotating discussed below:



a. Capacitor: Electrochemical capacitor improvements continue to focus on improving energy density while maintaining inherently high-power density. Design improvements include development and integration of higher temperature films, advanced electrolytes, advanced electrode materials, and minimizing equivalent series resistance (ESR).



b. Rotating: The Navy has interest in the investment from the transportation industry in flywheel systems that can handle gyroscopic forces continues to support flywheel usage in commercial rail and ground transportation. Additional factors of interest to the Navy include safety, recharge/discharge rates, ship motion impacts, environmental impacts and control.



c. Electrochemical: Factors of interest to the Navy with respect to electrochemical energy storage include the ability to maintain state of charge when not in use; change in voltage versus state of charge; charge and discharge capability; the temporary or permanent loss of capacity due to repeated shallow discharges; the ability to shallow charge and discharge or partially charge intermittently during a discharge; battery life considerations such as service-life, cycle life, and shelf-life; off-gas properties that affect the level of ventilation and associated auxiliary systems; and safety enhancements to support qualification for use onboard US Navy ships.



Near term Navy interests are in the area of common and scalable hardware and software elements which enable advanced weapons and sensors and in understanding the sizing algorithms for how to optimize energy storage sizing against various competing system requirements (short duration/high power vs. long duration/low power, for example. The specific design issues to be considered include reliability, volumetric and gravimetric power and energy densities, differentiating between high levels of stored energy and high energy density. The relevant information required for characterizing technology performance include: Technology Readiness Level (TRL) of components and systems; production capability; safety evaluation and qualifications performed on relevant subsystems or components (any hazard analyses of systems designs as relevant to notional applications); other military application of the devices; energy storage management system approach; thermal characteristics, constraints, and cooling requirements; auxiliary requirements (load); device impedance (heat generation characteristics); and device efficiency (discharge/recharge).



4.3.2 POWER CONVERSION



Industry continues to drive towards increased power density, increased efficiency, higher switching frequencies, and refined topologies with associated control schemes. Innovation in power conversion from the development and implementation of wide-bandgap devices, such as Silicon Carbide (SiC), promise reduction in losses many times over Silicon. The use of high frequency transformers can provide galvanic isolation with reduced size and weight compared to traditional transformers. Advances in cooling methods will be required to handle larger heat loads associated with higher power operation.



A typical Navy power conversion module might consist of a solid state power converter and/or a transformer. Advanced topologies and technologies, such as the application of wide band gap devices, are of particular interest. Navy interests are in the area of innovative approaches to address converting high voltage AC/DC to 1000 VDC with power levels on the order of 3MW or larger. The specific design issues to be considered include modularity, open architecture (focusing on future power system flexibility and the ability of a conversion module within a ships power system to be replaced/ upgraded in support of lifecycle mission system upgrades), reliability, cost, and conversion efficiency. Areas of interest include more power-dense converters supporting advanced mission systems and prototyping of full scale conversion based on second generation wide-bandgap devices.



4.3.3 POWER DISTRIBUTION



Power distribution typically consists of bus duct/ bus pipe, cables, connections, switchgear and fault protection equipment, load centers, and other hardware necessary to deliver power from generators to loads. Industry has used medium voltage DC (MVDC) transmission as a method to reduce losses across long distances. Complementarily, Industry is developing MVDC circuit protection for use in MVDC transmission variants of approximately 50, 100, and 150 megawatts (MW) at transmission voltages of 20 to 50 kVDC. Analysis includes modeling and simulation to determine methods for assessing the benefits of DC vs AC undersea transmission and distribution systems for offshore oil and gas. Industry and academia continue to invest resources in advanced conductors that have applications in power distribution, power generation, and propulsion. Research is focused on using carbon nanotubes. The development of a room temperature, lightweight, low resistance conductor is of great interest to the Navy.



Areas of interest include development of an MVDC distribution system up to 12 kVDC to meet maximum load demands; design of an appropriate in-zone distribution system architecture; development of high speed 1 kVDC and 12 kVDC solid state circuit protection devices that are ship ready, and advanced conductors capable of supporting power distribution.



4.3.4 PRIME MOVERS (INCLUDING POWER GENERATION)



Power Generation converts fuel into electrical power. A typical power generation module might consist of a gas turbine or diesel engine (prime mover), a generator (see rotating machine discussion below), a rectifier (either active or passive), auxiliary support sub-modules and module controls. Other possible power generation technologies include propulsion derived ship service (PDSS), fuel cells, or other direct energy conversion concepts. Power generation concepts include 60 Hz wound rotor synchronous generator driven directly by a marine gas turbine (up to 30 MVA rating); commercially derived or militarized design variants of the above; and higher speed, higher frequency, high power density variants of the above with high speed or geared turbine drive. NPES DC technologies permit prime movers and other electrical sources (such as energy storage) to operate at different, non-60Hz electrical frequency speeds, improving survivability, resiliency, and operational availability. Energy storage that is fully integrated with the power generation can enable uninterrupted power to high priority loads, mission systems that reduce susceptibility, and damage control systems to enable enhanced recoverability.



The specific design issues to be considered include fuel efficiency, module level power density, machine insulation system characteristics, size, weight, cost, maintainability, availability, harmonic loading, voltage, power, system grounding approaches, fault protection, response to large dynamic (step) or pulse type loading originated from ship propulsion or directed energy/electromagnetic weapons, interface to main or ship service bus, autonomy, limited maintenance, and commercial availability. Navy interests are in the area of innovative approaches to power generation in the 5 to 30 MW range, utilizing gas turbines, diesel engines and other emerging power technologies that address challenges associated with achieving reduced fuel consumption, decreased life cycle and acquisition cost, support of ship integration, enable flexibility, enable power upgrades, and improved environmental compliance. Near term Navy interest includes 10-30 MW (nominally 25 MW) output power rating and the power generation source able to supply two independent electrical buses (where abnormal conditions, including pulsed/stochastic loads, on one bus do not impact the other bus) at 12 kVDC (while also considering 6kVDC, 18kVDC, and 1 kVDC). Enhanced fuel injection, higher operating temperatures and pressures, and optimized thermal management are critical for future prime movers. Advanced controls for increased efficiency, reduced maintenance, and increased reliability include implementation of digital controls; autonomous and unmanned power control; enhanced engine monitoring, diagnostics, and prognostics; and distributed controls. Advanced designs for increased efficiency include new applications of thermodynamic cycles such as Humphrey/Atkinson cycle for gas turbines and diesels and Miller cycle for diesel.



The Navy is interested in developing a knowledge bank of information on potential generator sets, generator electrical interface requirements, and the impacts of those requirements on generator set performance and size, as a logical next step from the Request for Information released under announcement N00024-16-R-4205. A long-term goal for this effort is to maximize military effectiveness through design choice and configuration option flexibility when developing next-generation distribution plants. The power generation source should fit within the length of a typical engine room (46 feet, including allowances for any needed maintenance and component removal). The power generation source is expected to have the ability to: control steady-state voltage-current characteristic for its interface; to maintain stability; and to adjust control set-points from system level controllers. For any proposed design approach, initial efforts would include conceptual design trade studies that inform the performance level that can be achieved. Trade studies may address Pulsed Load Capability (generator/rectifier design to increase pulse load capability, engine speed variation limits, and impact of cyclic pulse load on component life); Power Density (cost vs. benefits of high speed or high frequency, mounting on common skid, and advanced cooling concepts); Single vs. Dual Outputs (continuous vs. pulse rating for each output, voltage regulation with shared field, and control of load sharing); Efficiency (part load vs. full load optimization, flexible speed regulation, impact of intake and exhaust duct size/pressure drop on engine efficiency); Power Quality (voltage transient, voltage modulation for step, pulse loads, impact of voltage and current ripple requirements, and common mode current); PGM Controls (prime mover speed vs. generator field vs. rectifier active phase angle control, and pulse anticipation); Stability when operating in parallel with other sources; Short Circuit Requirements; and Dark Ship start capability (self-contained support auxiliaries). Trade studies may also address how rotational energy storage can be built into the design of the generator or added to the generator and what parameters need to be defined in order to exploit this capability. Development of advanced coatings and materials that support high temperature operations of a gas turbine is also of interest. Energy harvesting to convert heat energy and specifically low quality heat energy to electricity using solid state components is also of interest to the Navy.



4.3.5 ROTATING MACHINES (INCLUDING GENERATORS AND PROPULSION MOTORS)



Recent trends in electrical machines include neural networks; artificial intelligence; expert system; fiber communications and integrated electronics; new ceramic conducting and dielectric materials; and magnetic levitation. High Temperature Superconducting rotors have higher power density than their induction and synchronous rotor counterparts. Wind power generators eliminate excitation losses which can account for 30% of total generator losses. The offshore wind power industry is moving to larger power wind tower generators in the 10MW class. Advanced low resistance room temperature wire and HTS shows promise for these higher power levels because of low excitation losses and low weight due to reduction in stator and rotor iron. HTS motors may be up to 50% smaller and lighter than traditional iron-core and copper machines. They have reduced harmonic vibrations due to minimization of flux path iron and have mitigated thermal cycling failures due to precision control of temperature.



Propulsion motor concepts of interest to the Navy include Permanent Magnet Motors (radial air gap, axial air gap, or transverse flux), Induction Motors (wound rotor or squirrel cage), superconducting field type (homopolar DC or synchronous AC). The drivers and issues associated with these designs include acoustic signature, noise (requirements, limitations, modeling, sources, and mitigation methods), shock, vibration, thermal management, manufacturing infrastructure, machine insulation system characteristics, commercial commonality, platform commonality, cost, torque, power, weight, diameter, length, voltage, motor configuration, and ship arrangements constraints. Motor drives that may be explored include cyclo-converter (with variations in control and power device types), pulse width modulated converter/inverter (with many variations in topology), switching (hard switched, soft switched), and matrix converter (with variations in control, topology, cooling, power device type). Technologies for drives and rotating machines which allow the ability to operate as a motor and a generator to facilitate a PDSS installation or on a fully integrated power system to leverage the inherent energy storage in the ship's motion may be explored. Integrated motor/propulsor concepts may be considered either as aft-mounted main propulsion or as a forward propulsor capable of propelling a ship at a tactically useful speed. Areas of interest for future rotating machines include increased magnetic material flux carrying or flux generation capacity; improved electrical insulation material and insulation system dielectric strength; increased mechanical strength, increased thermal conductivity, and reduced sensitivity to temperature; improved structural materials and design concepts that accept higher torsional and electromagnetically induced stress; innovative and aggressive cooling to allow improved thermal management and increased current loading; increased electrical conductor current carrying capacity and loss reduction.



4.3.6 COOLING AND THERMAL MANAGEMENT



As the demand and complexity of high energy loads increases, so does the demand and complexity of thermal management solutions. Assessing and optimizing the effectiveness of a thermal management system requires the analysis of thermal energy acquisition, thermal energy transport, and thermal energy rejection, storage, and conversion. The design of the thermal management system aims to transfer the thermal energy loads at the sources to the sinks in the most efficient manner.



Areas of interest to the Navy with respect to cooling and thermal management include the application of two phased cooling and other advanced cooling techniques to power electronics and other NPES components and innovative approaches to manage overall ship thermal management issues including advanced thermal architectures, thermal energy storage systems, increases in efficiency, and advanced control philosophies.



4.3.7 POWER CONTROLS



Controls manage power and energy flow within the ship to ensure delivery to the right load in the right form at the right time. Supervisory power system control typically resides on an external distributed computer system and therefore does not include hardware elements unless specialized hardware is required. The challenge to implement Tactical Energy Management (TEM) is to integrate energy storage, power generation, and interfaces with advanced warfighting systems and controls. TEM is critical to enabling full utilization of the capabilities possible from technologies under development. The state complexity and combat engagement timelines for notional future warfighting scenarios are expected to exceed the cognitive capacity and response times of human operators to effectively manage the electric plant via existing control system schema in support of executing ship missions. The survivability requirements for military ships combined with the higher dynamic power characterisitics (pulse load) characteristics of some mission systems will require more sophisticated control interfaces, power management approaches, and algorithms than are commercially available. The Navy is pursuing a long term strategy to create a unified, cyber secure architecture for machinery control systems that feature a common, reusable, cyber hardened machinery control domain specific infrastructure elements; a mechanism for transitioning new technology from a variety of sources in an efficient and consistent manner; and a mechanism to provide life cycle updates and support in a cost effective and timely manner. TEM controls will be expected to maintain awareness of the electric plant operating state (real time modeling); interface with ship mission planning (external to the electric plant control systems) for energy resource prioritization, planning, and coordination towards the identification of resource allocation states that dynamically optimize mission effectiveness; identify and select optimal trajectories to achieving those optimal resource allocation states; and actuate the relevant electric plant components to move the electric plant state along those optimized trajectories towards the optimal resource allocation state. TEM controls would enable reduced power and energy system resource requirements for a given capability (or improved capability for a given set of resources); increased adaptability of the Navy’s power and energy system design to keep pace with an evolving threat environment; and maximized abilities to execute the ship’s mission.



The Navy is interested in potential applications of distributed control architectures that have led to the development of intelligent agents that have some autonomous ability to reason about system state and enact appropriate control policies. A simple example of these agents in a control system is the use of autonomous software coupled with smart meters in a smart grid implementation. The agents, smart meters in this example, can temporarily shut off air conditioning but not the refrigerator in residences during grid peak power usage times when the cost per watt is highest on hot days. The agent software acts autonomously within its authority to comply with programmed customer desires. The Navy is interested in TEM controls within a modular open systems architecture framework such that they are agnostic of, but affordably customizable to, specific ship platforms and power system architectures.  TEM controls may reside between (i.e. interface with) embedded layers within individual power system components, ships’ supervisory machinery control systems, and ships’ mission planning systems. Initial or further development or modification of these interfaces may be required to achieve desired performance behaviors and characteristics. TEM controls are expected to develop within a model-based system engineering and digital engineering environment and will be initially evaluated in a purely computational environment, representing Navy-developed shipboard-representative power and energy system architecture(s), but will be progressively evaluated on systems with increasing levels of physical instantiation (i.e., controller-hardware-in-loop and power-hardware-in-loop with progressive levels of representative power system components physically instantiated). When implementing a TEM based control scheme, the overall power system should increase installed power generation available to mission and auxiliary loads; reduce power system design margins; hone the installed stored energy required for mission critical capability; and allow higher power transients (ramp rates and step loads). Other areas of interest to the Navy with respect to controls include improvements to traditional machinery control and automation, advanced power management, cyber security, and advanced controls for distributed shared energy storage and maintaining electrical system stability. The Navy is also interested in non-intrusive load monitoring, power system data analytics, real time system monitoring and onboard analysis and diagnostics capabilities.



4.3.8 SYSTEM INTERPLAY, INTERFACING, AND INTEGRATION



Increasingly, the Navy is recognizing the need for incorporating flexibility and adaptability into initial ship designs and recognizing that the integration of new systems and the ability to rapidly reconfigure them will be an ongoing challenge throughout a platform's life cycle in order to maintain warfighting relevancy. The ability to support advanced electrical payload warfighting technologies requires not only power and energy systems delivered with the flexibility and adaptability to accommodate them, but a NPES engineering enterprise with the capability and capacity (knowledge, labor, and capital) for continuous systems integration. The Navy can more affordably meet this challenge by shifting as much effort as possible into the computational modeling and simulation regime.



An Integrated Power System (IPS) provides total ship electric power including electric propulsion, power conversion and distribution, energy storage, combat system support and ship mission load interfaces to the electric power system. Adding Energy Storage and advanced controls to IPS results in an Integrated Power and Energy System (IPES) in order to accommodate future high energy weapons and sensors. The IPES Energy Magazine is available to multiple users, and provides enhanced power continuity to the power distribution system. The flexibility of electric power transmission allows power generating modules with various power ratings to be connected to propulsion loads and ship service in any arrangement that supports the ships mission at the lowest total ownership cost (TOC).



Systems engineering in IPS/IPES is focused on increasing the commonality of components used across ship types (both manned and unmanned) and in developing modules that will be integral to standardization, zonal system architectures, and generic shipbuilding strategies with standard interfaces that are Navy-controlled. IPES offers the potential to reduce signatures by changing the frequency and amplitude of acoustic and electromagnetic emissions. Integrated energy storage can reduce observability by enabling the reduction and elimination of prime movers, thereby reducing thermal and acoustic signatures. The modules or components developed will be assessed for applicability both to new construction and to back-fit opportunities that improve the energy efficiency and mission effectiveness.



Areas of Navy interest are to continuously improve IPS/IPES by performing analysis, modeling and simulation, life cycle cost analysis, producibility studies, module development, ship integration studies, architecture design, ship electric architectures and support for high power weapons systems requirements, and related efforts. High level power system architectures are based on MVAC and MVDC power with attributes of power density, fault management, capability and affordability. For ship service electrical loads, the architecture includes zonal electrical distribution which may be either AC or DC, depending upon the specific application. In addition to a full IPES or IPS implementation, Hybrid Electric Drive (HED) where mechanical propulsion is augmented by rotating electric machinery, or additional power generation or energy storage may be of interest. The Navy desires to understand the performance and cost trade space that is available for the various options of architecture; component, system and controls technologies; functional allocations; and interfaces. Also of interest are technologies that result in significant energy efficiency, thermal improvements, power density improvements and/or carbon footprint improvements over existing propulsion and power system technologies. Another area of interest for the Navy is the interface definition between unique electrical loads and the power system, and the provision of specialty power to optimize that load interface. Among the special load interfaces that might require development are support for pulsed power weapons and sensors such as radar power supplies, electromagnetic launchers (for example electromagnetic railgun), and advanced laser systems, all of which would benefit from optimized integration with the shipboard power system.



The approach to prototype hardware developed under this BAA is that it fosters modularity and scalability (so that families of products may be leveraged to multiple potential applications) and shall accommodate an open system architecture where interfaces are well defined and mutually accepted. The Navy is interested in both near term solutions that have the potential for rapid transition to a high Technology Readiness Level (TRL) as well as longer term technology pushes that advance the science and would enable a future compact shipboard system. Risk reducing technology prototype demonstrations in the near term are encouraged. An evaluation of emerging technologies for ship applications (such as energy storage, support for high energy weapons, support for high power radars, high-speed generators, and advanced power electronics) to determine future feasibility and development requirements is also of great interest. Development of advanced design tools and power system specifications and standards is also key to ensuring new power systems will integrate aboard ship. The Navy is interested in a model-based approach to power system engineering, from early concept system architecture trade studies and trade-space exploration, to production-ready performance specifications for component and systems acquisitions. Particular technologies and system concepts will need to be evaluated in a common set of modeling contexts and environments standardized across the Navy power system engineering enterprise. Modeling-enabled evaluation of technology alternatives and performance of system-level trade studies requires that models be delivered with a sufficient pedigree supported by analysis, verification, and validation (e.g., by subscale hardware demonstrations) to prove the applicability of the models for the standardized modeling contexts and environments (model based system engineering).



5. POINT(S) OF CONTACT


All white Papers shall be submitted to all parties identified below:


PMS 470 Technical POC: Jim Dempsey
james.a.dempsey.civ@us.navy.mil
 


NAVSEA 0241 POC: 


Mr. William Jee, Procuring Contracting Officer  


william.j.jee.civ@us.navy.mil  


III. AWARD INFORMATION



The amount and period of performance of each selected proposal will vary depending on the research area and the technical approach to be pursued by the selected offeror.



IV. ELIGIBILITY INFORMATION



All responsible sources from academia and industry may submit white papers under this BAA. Awards under this BAA will likely be Cost Plus Fixed Fee (CPFF) and thus offerors are required to have a Defense Contract Management Agency (DCMA) / Defense Contract Audit Agency (DCAA) approved accounting system to be eligible for award or evidence that a pre-award survey has been initiated with DCMA/DCAA.



V. APPLICATION AND SUBMISSION INFORMATION



1. APPLICATION AND SUBMISSION PROCESS


"White Papers" are desired by NAVSEA in response to this solicitation. All white papers shall be submitted to NAVSEA via email to the following address: joshua.j.cushenette.civ@us.navy.mil. Hard copy submissions are not accepted. Those Offerors with white papers considered to have merit will be requested to prepare full proposals for the planned effort as specified below. Receipt of all white papers will be acknowledged by the Technical Point of Contact listed above. White papers will be retained by the Navy and, should an application and associated funding be identified for the concept proposed, additional responses will be requested of the Offeror.



2. GENERAL INFORMATION FOR WHITE PAPERS/FULL PROPOSALS


The white papers and proposals submitted under this BAA are expected to be unclassified. White paper and proposal submissions will be protected from unauthorized disclosure in accordance with FAR 15.207, applicable law, and Department of Defense (DoD)/Department of Navy (DoN) regulations. Offerors are expected to appropriately mark each page of their submission that contains proprietary information.



2.1. WHITE PAPERS



2.1.1 WHITE PAPER FORMAT



Paper size shall be no larger than 8.5" x 11" paper with no less than 1" margins on all sides. The font shall not be less than 12 point. The format of the submission shall be one electronic copy in Microsoft Word or Excel compatible or .PDF format. The page limit for white papers shall be no longer than twenty-five (25) pages and only contain information necessary to describe the proposed technical concept and comply with content requirements for the white papers stated herein.



2.1.2 WHITE PAPER CONTENT



2.1.2.1 COVER PAGE



The Cover Page shall be labeled "WHITE PAPER," and shall include the BAA number, proposed title, the company technical/administrative points of contact with telephone numbers and e-mail addresses, the company Commercial and Government Entity (CAGE) code, which module or modules the White Paper is relevant to from the Research Opportunity section above (Section II Paragraph 4), and the names and contact information (if known) of the assigned DCMA Administrative Contracting Officer (ACO).



2.1.2.2 TECHNICAL CONCEPT/NAVAL RELEVANCE



The Technical Concept shall include a description of the technology innovation and associated technical risk areas. This section also includes a description of the potential naval relevance and contributions of the proposed effort to improvement in the performance of NPES as defined in the NPES TDR. This section may include a plan for demonstrating and evaluating the operational effectiveness of the Offeror's proposed products or processes in field experiments and/or tests in a simulated environment.



2.1.2.3 CAPABILITIES; RELATED EXPERIENCE AND PAST PERFORMANCE, AND FACILITIES



The capabilities section shall describe past experience and facilities that demonstrate your company ability to complete the scope identified in the white paper.  This section shall include evidence of the company's capabilities to demonstrate the technology innovation proposed.  Offerors shall provide all relevant past performance for similar or related work under contracts currently being performed or completed during the last three (3) years.  The Offeror may include Federal, State and Local Government and private sector contracts.  Offerors that represent newly formed entities, without prior contract experience, should identify previous contract and subcontract experience for all principal investigators identified in the proposal.  This section will not be counted against the page limits noted in paragraph 2.1.1 above.  The following information for each such contract shall be provided:


a. Contract Number


b. Customer/Agency


c. Contracting Officer and Technical Point of Contact (names and phone numbers)


d. Brief Description of Scope of Work and Deliverables


e. Contract Type


f. Award Price/Final Price


g. Period of Performance



2.1.2.4 COST AND DEVELOPMENT SCHEDULE



The white paper should identify the total estimated cost and the notional development timeline of the effort proposed in the white paper and a brief rational for how you established this rough order of magnitude (ROM) cost estimate. The page limit for the estimated cost and schedule information shall not exceed one (1) page; no larger than 8.5" x 11" when printed on paper with no less than 1" margins on all sides; and the font shall not be less than 12 point. The estimated cost and schedule section will not be counted against the page limits noted in paragraph 2.1.1 above. For planning purposes, depending upon the nature of the technology being proposed, a contract that may result from the White Paper could be staged using multiple phases, starting with concept exploration and technology characterization. Should the concept prove meritorious, options may be included to take the technology/approach through a design and prototype/software build. The total potential contract period of performance cannot exceed five (5) years.



2.1.2.5 ASSERTION OF DATA RIGHTS



Include here a summary of any proprietary rights (limited/restricted) to pre-existing results, prototypes, or systems supporting and/or necessary for the use of the research, results, and/or prototype. If there are proprietary rights, the Offeror must explain how these affect its ability to deliver subsystems for integration. Additionally, Offerors must explain how the program goals are achievable in light of these proprietary and/or restrictive limitations. If there are no claims of proprietary rights in pre-existing data, this section shall consist of a statement to that effect. In order for a data rights assertions list to be accepted by the Government and included as an Attachment to a contract, the DFARS (252.227-7013 and 252.227-7014) requires that the information be listed in a table having four columns. In the first column, technical data to be furnished with restrictions, for non-commercial technical data items, both the item and the technical data pertaining to that item must be listed. Also, the assertion must be made at the lowest component level. And since technical data is defined as "recorded information of a scientific or technical nature", a document where the technical data is recorded must also be listed. This is usually, but not always, a drawing number. Non-commercial computer software items should similarly be listed at the lowest practicable subroutine level and should also list a version number.



2.1.2.6 ACCOUNTING SYSTEM DOCUMENTATION



The white paper shall include evidence of an approved accounting system or evidence that a pre-award survey has been initiated with DCMA/DCAA for an approved accounting system.



2.2 FULL PROPOSALS FORMAT AND CONTENT



Once a White Paper topic has been selected to proceed to the next step, the Contracting Officer will issue a Request for Proposal (RFP) letter with additional detail on the required content of the proposal, page limitations, and due dates. The RFP letter will also provide details of the notional statement of work for the effort, including a level of effort for related engineering services as described above; any optional phases; a description of the required deliverable data; and the required contents and details of the cost volume.



2.2.1 ASSOCIATED ENGINEERING SERVICES



The potential contract, at the option of the Government, may also include the services of qualified engineers/technicians and management functions to perform engineering support for follow-on investigations, additional trade studies, participation in Navy directed Interface Working Groups (IWG) to assess the technology implementation in shipboard applications, and hardware evaluations to determine the effectiveness of the new technologies developed under the basic effort. This level of effort shall not be included in the White Paper submission, but may, at the option of the Government, be included in any resultant contract. The nature of the services to be performed shall be integrally related to the core scope of the contract, shall form a logical extension of the work otherwise performed (such as completion of testing of articles developed or extending the performance capability of the articles developed), or shall provide amplifying details of the articles or technologies beyond that otherwise required and shall result in a specific end-product, such as a report. Funding for Engineering Services may be from R&D, Ship Construction, Operation & Maintenance; or Other Procurement sources as may be appropriate for the follow-on activity required, but shall not be used for production of any technology proposed.



VI. EVALUATION INFORMATION



1. EVALUATION CRITERIA



1.1 WHITE PAPERS



Evaluation of the "White Papers" will be based on a competitive selection resulting from a scientific review using the following evaluation criteria:



Criteria 1: Overall scientific and technical merits of the concept proposed and the potential Naval relevance and contributions of the effort to the improved performance of NPES modules and architectures within a reasonable development schedule.



Criteria 2: Potential risks to the development and future acquisition associated with the assertion of data rights.



Criteria 3: Capabilities; related experience and past performance; and facilities



Criteria 4: Potential risks to the development associated with the length of the development schedule and the availability of funds to complete all proposed tasks.



Selection of the Offeror(s) from which RFPs will be issued will be based upon the Governments assessment of the Criteria above and the availability of funds to accomplish the proposed effort.  White papers submitted under this BAA will be protected from unauthorized disclosure in accordance with FAR 3.104-5 and 15.207.  The cognizant Government experts will perform the evaluation of technical proposals.



1.2 RATINGS USED FOR SCIENTIFIC REVIEW



1.2.1 CRITERIA 1



Overall scientific and technical merits and potential Naval relevance of the concept.



Rating = Excellent: Research proposal demonstrates high potential for providing technological advancement relative to the baselines described in the 2019 NPES TDR with a reasonable amount of developmental risk. Research proposal demonstrates high potential for direct application to a future NPES ship and/or will significantly improve the performance of NPES modules and/or architectures.



Rating = Good: Research proposal demonstrates moderate potential for providing technological advancement relative to the baselines described in the 2019 NPES TDR with a reasonable amount of development risk. Research proposal demonstrates moderate potential for direct application to a future NPES ship and/or will probably improve the performance of NPES modules and/or architectures.



Rating = Poor: Research proposal demonstrates low potential for providing technological advancement relative to the baselines described in the 2019 NPES TDR with a reasonable amount of development risk and/or have an unreasonable amount of development risk. Research proposal demonstrates low potential for direct application of a future NPES ship and/or will not significantly improve the performance of NPES modules and/or architectures.



1.2.2. CRITERIA 2



Potential risks to the development and future acquisition associated with the assertion of data rights.



Rating = Excellent: There is low or no risk that the level of data rights proposed would limit the Governments ability to use the technical data generated during the performance of the contract as part of a technical data package for future competitive development or production efforts.



Rating = Good: There is moderate risk that the level of data rights proposed would limit the Governments ability to use the technical data generated during the performance of the contract as part of a technical data package for future competitive development or production efforts.



Rating = Poor: There is high risk that the level of data rights proposed would limit the Governments ability to use the technical data generated during the performance of the contract as part of a technical data package for future competitive development or production efforts.



1.2.3 CRITERIA 3



Capabilities; related experience and past performance; facilities; techniques; and qualifications, capabilities and experience of the proposed Principal Investigator / Team Leader.



Rating = Acceptable: Based on the Offerors performance record, the Government has a reasonable expectation that the Offeror will successfully perform the required effort, or the Offeror's performance record is unknown.  In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the Offeror may not be evaluated favorably or unfavorably on past performance (see FAR 15.305 (a)(2)(iv)).  Therefore, the Offeror shall be determined to have unknown (or "neutral") past performance.  In the context of acceptability/unacceptability, a neutral rating shall be considered "acceptable."



Rating = Unacceptable: Based on the Offerors performance record, the Government does not have a reasonable expectation that the Offeror will be able to successfully perform the required effort.



1.2.4. CRITERIA 4



Potential risks to the development associated with the length of the development schedule and the availability of funds to complete all proposed tasks.



Rating = Excellent: There is low or no risk that the technology development timelines and the availability of funds necessary to conduct the development would not support the Governments ability to transition the technology development for future competitive development or production efforts.



Rating = Good: There is moderate risk that the technology development timelines and the availability of funds necessary to conduct the development would not support the Governments ability to transition the technology development for future competitive development or production efforts.



Rating = Poor: There is high risk that the technology development timelines and the availability of funds necessary to conduct the development would not support the Governments ability to transition the technology development for future competitive development or production efforts.



VII. SECURITY CLASSIFICATION



In order to facilitate intra-program collaboration and technology transfer, the Government will attempt to enable technology developers to work at the unclassified level to the maximum extent possible. If access to classified material will be required at any point during performance, the Offeror must clearly identify such need prominently in their proposal. If Offerors use unclassified data in their deliveries and demonstrations regarding a potential classified project, they should use methods and conventions consistent with those used in classified environments. Such conventions will permit the various subsystems and the final system to be more adaptable in accommodating classified data in the transition system.



Contracting Office Address:



N00024 NAVAL SEA SYSTEMS COMMAND, DC 1333 Isaac Hull Avenue S.E. Washington Navy Yard, DC



Contracting Office Address:
SEA 02
1333 Isaac Hull Avenue SE
Washington Navy Yard, District of Columbia 20376 United States


Place of Performance:
TBD
United States


Primary Point of Contact:


Mr. William Jee, Procuring Contracting Officer  


william.j.jee.civ@us.navy.mil  




Similar Contracts

Same NAICS industry code

NAICS: 335311
New
Federal
Transformers 1600 Watt
Solicitation # F3N0526042A006
The Department of Defense is soliciting 200 units of 1600-watt transformers for Ramstein Air Base in Ramstein-Miesenbach, Germany, under solicitation number F3N0526042A006. Each transformer must be a step-down unit converting 220/240 volts to 110 volts, featuring dual polarity EU plugs, two U.S. sockets compatible with Type A and B plugs, a 2-meter flexible cable with a Shuko Type F plug, gray steel sheet housing, a portable handle, and single-phase FFP-self-cooling technology. The units must include two primary circuit breakers rated at 4.5 amps functioning as both overload protection and on-off switches, positioned centrally above the sockets. The solicitation, posted on July 16, 2026, requires responses by July 27, 2026, with an anticipated award date of September 30, 2026. Evaluation will be conducted under FAR 52.212-2 using the most advantageous to the government standard, with no set-aside applied due to the overseas location of the requirement. Offerors are encouraged to submit technical sheets or photographs, but no formal attachments, packaging specifications, inspection criteria, or funding details are provided. Funds are not currently available, and no award will be made until appropriated. The contracting office is located in APO, AE, with the administrative office in Kaiserslautern, and the point of contact is Jonathan Rushin. The government retains the right to cancel the solicitation at any time without financial obligation to offerors.
FA5613 700 Cons Pk

POSTED

about 17 hours ago

DEADLINE

in 3 days
View Details
NAICS: 335311
New
SLED
ITB-2026-006 Penn Turpin Transformer Replacement
Solicitation # IFB-124434
The Town of Bedford Electric Department is soliciting bids for the replacement of a transformer at the Penn Turpin Station Electrical Substation in Bedford, Virginia, under solicitation number IFB-124434. The request seeks either a new transformer or a like-new unit that meets the operational and safety standards required for the substation’s continued service. Bids must be submitted by August 13, 2026, with the solicitation posted on July 21, 2026, and is governed under NAICS code 335311 for electrical equipment manufacturing. The contract is open to all qualified vendors without a specific set-aside, and performance will take place at the designated substation location in Bedford, VA. All proposals must be directed to Crystal McGraw, the point of contact, via email at chosey@bedfordva.gov or by phone at 540-587-6041. Interested parties can access additional details through the provided online portal. The transformer must be suitable for integration into the existing infrastructure at Penn Turpin Station, ensuring compatibility with current systems and compliance with local and industry safety regulations. Vendors are expected to provide thorough technical specifications, warranty information, delivery timelines, and installation capabilities as part of their submissions. Failure to meet all requirements may result in disqualification.
Town of Bedford

POSTED

about 24 hours ago

DEADLINE

in 6 days
View Details
NAICS: 335311
New
SLED
Pad-Mounted Single- and Three-Phase Distribution Transformers (25–2500 kVA)The contract entails the manufacture and delivery of pad-mounted single- and three-phase distribution transformers ranging from 25 to 2500 kVA, designed with tamper-resistant enclosures to meet ANSI C57.12.28 standards and comply with the Department of Energy’s 2016 efficiency requirements and other applicable ANSI specifications. These transformers are intended for public distribution networks and must be built to ensure long-term reliability, energy efficiency, and physical security against unauthorized access or damage. The equipment is subject to strict regulatory compliance and quality benchmarks to guarantee operational safety and performance under real-world utility conditions. The solicitation is issued as a subcontract by the City of Independence in Missouri and is open for bids with a response deadline of August 24, 2026. The North American Industry Classification System code 335311 identifies the scope as electrical equipment manufacturing, aligning with the production of transformers for distribution systems. While no specific place of performance or point of contact is provided, bidders are expected to fulfill delivery and compliance requirements as outlined in the technical specifications. The posting is accessible via the PublicPurchase platform, indicating a procurement process managed through a municipal procurement portal.
City of Independence

POSTED

1 day ago

DEADLINE

in 17 days
View Details
NAICS: 335311
New
Federal
CBL ACTR/LOCK PWR
Solicitation # N0010426QNE12
This contract pertains to the manufacture and quality assurance of the CBL ACTR/LOCK PWR component, governed by specific engineering drawings and technical standards including MIL-STD-129 for marking, MIL-STD-973 for configuration control, and NAVSEA S9320-AM-PRO-020/MLDG for manufacturing certification. The item is intended for use on submarines or surface ships, mandating strict mercury-free requirements to prevent contamination of sensitive systems, with any proposed use of mercury requiring prior written approval and detailed safety protocols. Suppliers must maintain an ISO 9001 quality system and are responsible for all inspections, records, and compliance, with government oversight reserved at any stage. Configuration changes, deviations, or waivers must be formally approved and documented through specified channels to NAVICP-MECH in Mechanicsburg, PA. The solicitation, issued under N0010426QNE12 by the Naval Supply Systems Command Weapon Systems Support in Mechanicsburg, Pennsylvania, is subject to emergency acquisition flexibilities and will be awarded as a rated order under the Defense Priorities and Allocations System. It is a total small business set-aside with mandatory compliance with Buy American Act provisions, Small Business Subcontracting Plans, and cybersecurity maturity certification requirements. All contractual documents are deemed officially issued upon electronic transmission, and award requires bilateral acceptance. Vendors must adhere to stringent packaging standards under MIL-STD-2073, provide certified test reports for each assembly, and ensure subcontractors meet all terms. Proposals are due by September 8, 2026, and technical inquiries must be directed to the designated point of contact, James E. Lewis, via official email.
Navsup Weapon Systems Support Mech

POSTED

1 day ago

DEADLINE

in about 1 month
View Details
NAICS: 335311
New
Federal
61--CABLE ASSEMBLY SET,
Solicitation # N0010426QEA80
The contract pertains to the procurement of 60 units of a cable assembly set identified by NSN 1H-6150-015078604-X3 and TDP VER 003, to be delivered to two designated DLA distribution points in New Cumberland, Pennsylvania, and Tracy, California. The Government has determined that the data necessary to procure or repair this part from alternate sources is not owned by the Government and cannot be acquired through purchase, development, or other means, and reverse engineering is deemed uneconomical. As a result, the procurement is being conducted as a sole source action under FAR 6.302-1, with no requirement for competitive bidding. While the notice does not solicit competitive proposals, any responsible source may submit interest, capability statements, or proposals within 45 days of the notice date, or 30 days if under an existing Basic Ordering Agreement. Award is contingent upon the offeror, product, or manufacturer meeting all qualification requirements at the time of award, as outlined in FAR clause 52.209-1, and the Government retains full discretion to determine whether competition is warranted based on incoming responses. Market research indicates that commercial item acquisition policies under FAR Part 12 do not apply to this requirement, though interested parties may still propose commercial alternatives within 15 days of the notice. Further details regarding qualification criteria are available through the contracting office identified in the solicitation.
Navsup Weapon Systems Support Mech

POSTED

1 day ago

DEADLINE

in about 1 month
View Details

More opportunities from Department Of Defense → Navsea Hq

Same awarding agency

NAICS: 336611
New
Federal
QPL-24728, Interconnection Box, Fiber Optic, Metric, General Specification for
Solicitation # N0002426SN-53
The Naval Sea Systems Command is seeking additional qualified sources for fiber optic interconnection boxes compliant with MIL-PRF-24728B, specifically targeting government designations M24728/1-005 through M24728/13-02, to be added to Qualified Products List (QPL)-24728. This is not a solicitation but a sources sought notice aimed at identifying manufacturers capable of supplying products that meet the military performance specification. Awarding contracts or orders will be limited to products that are qualified for inclusion on QPL-24728 at the time of award, regardless of whether they have been formally listed yet, and manufacturers are strongly encouraged to initiate the qualification process in advance to ensure eligibility. Guidance for qualification is provided in SD-6, which can be accessed through ASSIST, and manufacturers may contact CommandStandards@navy.mil for further details regarding testing and compliance requirements. Interested parties may submit requests for qualification application procedures via email to CommandStandals@navy.mil by the deadline of September 2, 2026, with additional procedural information available on the NAVSEA QPL website. The notice, posted on August 5, 2026, falls under NAICS code 336611 for communications equipment manufacturing and is issued by the Department of Defense through the NAVSEA headquarters office in Washington Navy Yard, DC. No set-aside provisions are indicated, and the process is open to all qualified suppliers aiming to meet the government's technical and compliance standards for fiber optic interconnection components.
Ship Building and Repairing

POSTED

3 days ago

DEADLINE

in 26 days
View Details
NAICS: 335921
New
Federal
QPL-85045, Cables, Fiber Optic, General Specification for
Solicitation # N0002426SN-51
The Naval Sea Systems Command is seeking additional sources of fiber optic cables meeting the MIL-PRF-85045H specification for inclusion on the Qualified Products List QPL-85045, specifically targeting designations /8, /33, /34, /35, and /36. This is not a solicitation but a sources sought notice aimed at identifying qualified manufacturers who can supply products that meet the military performance standard. To be eligible for future contract awards, products must already be qualified or in the process of qualifying for QPL-85045 at the time of award, and manufacturers are encouraged to initiate the qualification process well in advance. Guidance on qualification procedures is available through the Provisions Governing Qualification (SD-6), accessible via the ASSIST database, and further details can be obtained by contacting CommandStandards@navy.mil. Interested parties may request qualification application procedures by submitting inquiries via email to CommandStandards@navy.mil by the deadline of September 2, 2026. Additional information about the qualification process, including submission protocols and requirements, can be found on the NAVSEA QPL website. The notice is issued under solicitation number N0002426SN-51, with a NAICS code of 335921, and is managed by the Department of Defense through NAVSEA headquarters located in Washington Navy Yard, DC. While no set-aside type is specified, this initiative seeks to expand the pool of qualified suppliers to support future defense procurement needs for fiber optic cable systems.
Fiber Optic Cable Manufacturing

POSTED

3 days ago

DEADLINE

in 26 days
View Details
NAICS: 336611
New
Federal
USS JOHN P MURTHA (LPD 26) FY27 Docking Selected Restricted Availability (DSRA) Request for Proposals
Solicitation # N0002426R4412
The Naval Sea Systems Command is soliciting proposals for the Docking Selected Restricted Availability (DSRA) of the USS JOHN P MURTHA (LPD 26), a complex shipyard availability requiring comprehensive maintenance, modernization, and repair work across multiple ship systems. This procurement is planned as a Firm-Fixed-Price contract and is being conducted on a coast-wide basis along the West Coast, with no set-aside for small businesses due to market research indicating insufficient qualified small business capacity under FAR 19.502-2(b). The scope encompasses approximately 158,000 man-days of maintenance and 26,000 man-days of modernization, including critical work on the hull structure, propulsion plant, electric plant, command and surveillance systems, auxiliary systems, outfitting, and armament. Major modernization projects involve upgrades to the SSDG seawater piping system and the central fresh water system, while maintenance tasks include ballast tank preservation, structural repairs to decks and bulkheads, overhaul of ship’s service diesel generators, radar and mast replacements, non-skid surface restoration, and cargo/elevator repairs. The contractor must have substantial facilities capable of accommodating a San Antonio-class LPD, with minimum pier requirements of 684 feet in length, 33 feet of water draft, 8000 amps of 450-volt three-phase electrical capacity, 9500 gallons per day of potable water, 1250 gallons per minute of sea water at 150 PSI, and capacity to handle 10,000 gallons per day each of sewage and wastewater. Technical capability must include seasoned personnel skilled in structural welding, piping, electrical, and ventilation trades to coordinate and integrate overlapping work areas under a detailed integrated production schedule that accounts for Alteration Installation Teams, ship force work, and long lead time material procurement. Offerors must be registered in the System for Award Management (SAM) and provide their Unique Entity Identifier (UEI) to be eligible. All solicitation documents are issued electronically through PIEE, and prospective bidders are required to monitor both PIEE.gov and SAM.gov for updates and amendments. The proposal submission deadline has been extended to August 4, 2026, at 7:00 PM ET. Critical technical attachments including CDRLs and J- and S-series documents are not publicly available and must be requested in writing from the Contract Specialist Kate Workosky and Contracting
Ship Building and Repairing

POSTED

4 days ago

DEADLINE

in 14 days
View Details
NAICS: 336611
New
Federal
Cable Repair Ship (T-ARC(X)) Sole Source Synopsis
Solicitation # N0002426R2229
The U.S. Navy, through NAVSEA, intends to award a sole-source Firm Fixed Price contract to VARD Marine Inc. in Houston, Texas, for Requirements Feasibility Studies supporting the Cable Repair Ship (T-ARC(X)) program. This effort will assess the commercial VARD 9 01 ship design’s ability to meet the Navy’s Top Level Requirements with minimal modification, focusing on its capacity to support current and legacy cable systems while accommodating government-furnished C4I equipment. The contract will require VARD to deliver concept-level design products including General Arrangement, Critical Equipment List, and Weight Report, along with an analysis of impacts on ship characteristics, cost, producibility, and identification of non-compliant equipment sources. Market research and prior industry engagement confirmed that the proprietary VARD 9 01 design is the only configuration capable of fulfilling all Tier 1 requirements, making VARD the sole viable source to perform this study without introducing significant risk or schedule delays. This announcement is a Sole Source Synopsis and not a solicitation; no formal contract or commitment is implied, and no competitive bidding process will be initiated. The North American Industrial Classification System code is 336611, and the acquisition falls under 10 U.S.C. 3204(a)(1), which justifies sole-source selection due to the unique proprietary nature of the design. Interested parties may submit a three-page capability statement by August 18, 2026, via email to the designated points of contact, including company information, business size designation, and evidence of ability to perform a comparable feasibility study. Responses must properly mark any proprietary information, as the Government assumes no liability for unmarked submissions and will not reimburse costs. Responses are not offers, will not be considered contracts, and will not impact future participation in potential solicitations. No written solicitation will be issued, and the Government retains full discretion to proceed, modify, or cancel the action without obligation.
Ship Building and Repairing

POSTED

5 days ago

DEADLINE

in 11 days
View Details
NAICS: 336611
New
Federal
Defueled Ex-Long Beach (CGN 9) Transportation & Disposal
Solicitation # N0002426ICGN9
The U.S. Navy, through the Portfolio Acquisition Executive (PAE) Maritime and the CVN Inactivation and Disposal Program Office (PMS 368), is conducting market research under FAR 15.101(c) and FAR part 10 to identify qualified sources capable of transporting, dismantling, de-militarizing, and disposing of the ex-Long Beach (CGN 9), including its defueled reactor plants, with all work required to be performed within the United States. This Request for Information (RFI), identified by solicitation number N0002426ICGN9 and NAICS code 336611, is not a solicitation for proposals and does not obligate the Government to award a contract; respondents must bear all costs associated with their submissions, and no reimbursement will be provided. The Government seeks detailed technical approaches, company experience, and risk assessments through two submission formats: an Executive Summary of up to 12 slides and a White Paper of up to 60 pages, both due by July 10, 2026, with early submissions encouraged to inform Industry Day discussions held on June 24–25, 2026, at the Maritime Plaza in Washington, DC. Responses must be sent to designated Navy points of contact and will be treated as business sensitive, protected from external disclosure, and retained for planning purposes. Any future RFP will be advertised on SAM.gov, and failure to respond now does not preclude future participation. The scope of work requires the contractor to remove and package reactor components as low-level radioactive waste, manage the shipment of large components like reactor vessels, and restore the site to an unrestricted radiological condition per NUREG 1757, Vol I and NRC regulations. The facility must be located in the U.S. and the vessel must be acceptably transported from a mutually agreed location near Puget Sound Naval Shipyard. Strict security protocols are mandated, including physical security controls, access limited to U.S. citizens for propulsion plant areas, compliance with NN-801 for Unclassified Naval Nuclear Propulsion Information (U-NNPI), and adherence to CMMC Level TBD for Cybersecurity Maturity Model Certification. Environmental, safety, and health requirements include implementing plans compliant with OSHA’s National Emphasis Program for shipbreaking and adhering to Federal, State, and local environmental laws. The Nuclear Regulatory Commission will review the contractor’s technical capabilities
Ship Building and Repairing

POSTED

5 days ago

DEADLINE

in about 1 month
View Details
NAICS: 541330
Federal
Industry Day - Advanced Payload Integration Capabilities for Future Submarines
Solicitation # N00024-26-R-6250
The U.S. Navy, through the Director, Submarine Programs, is hosting a classified Industry Day on September 29–30, 2026, at Systems Planning and Analysis in Alexandria, Virginia, to gather specialized technical input on payload integration for future submarine platforms. This event targets industry partners capable of addressing complex challenges in logistics, stowage, command and control, platform integration, safety, and lifecycle design for advanced payloads, with emphasis on operability during underway conditions and seamless compatibility with host submarine systems. Participation is restricted to U.S. citizens with active SECRET or higher clearances, and no interim clearances will be accepted. The Government is not soliciting formal proposals, and attendance does not imply future contracting obligations, but seeks actionable concepts and engineering solutions from qualified vendors. Registration requires a two-step process by August 28, 2026: first, an email submission to the Navy point of contact with organizational details and participant names—capped at three per company—and a request for a breakout session if desired; second, a formal Visit Authorization Request submitted through DISS using the SPA SMO code 7L563. All attendees must present valid government-issued photo ID upon arrival and comply with strict facility security protocols, including a complete ban on electronic devices, wearable technology, and recording equipment within the venue. Limited secure storage is available, but attendees are advised to leave prohibited items in their vehicles. Medical devices with Bluetooth functionality require prior approval. The event will include government and shipbuilder briefings on Day 1 and one-on-one technical discussions with government and contractor personnel on Day 2, focusing exclusively on specific, viable technical innovations to enable next-generation submarine payload capabilities.
Engineering Services

POSTED

8 days ago

DEADLINE

in 21 days
View Details
NAICS: 336611
Federal
Carrier/Surface Ship Engineering Maintenance Assist Team (CEMAT/SEMAT)
Solicitation # N0002426R4114
The Naval Sea Systems Command is soliciting proposals under solicitation N0002426R4114 for the Surface/Carrier Engineering Maintenance Assist Team (S/CEMAT) contract, a five-year Cost Plus Fixed Fee, Level of Effort, Indefinite Delivery/Indefinite Quantity (IDIQ) vehicle to provide global engineering and technical support for the maintenance, overhaul, and repair of HM&E, aviation, and C4I systems aboard U.S. Navy aircraft carriers and surface ships. Performance will occur at multiple domestic and international locations, including Norfolk, Newport News, San Diego, Bremerton, Pearl Harbor, Yokosuka, Sasebo, and Everett, with work conducted onboard vessels and at naval shipyards. Proposals must be submitted exclusively through the PIEE portal by the deadline of August 10, 2026, and must adhere to a strict four-volume format, with Volume II limited to 95 pages and resumés capped at two pages per individual. The evaluation process prioritizes Management Approach, Technical Approach, and Resource Capabilities as significantly more important than Past Performance and Cost, with no numerical weights assigned, and the Government will conduct a trade-off analysis to select the proposal offering the best value, not necessarily the lowest price. The contract imposes stringent requirements related to organizational conflict of interest, level of effort, security, and compliance. Offerors are prohibited from supplying systems or services developed under this contract to the government for three years after completion unless exempted, and must promptly disclose any actual or potential conflicts. Labor efforts are measured at 40 hours per week, with uncompensated hours exceeding that threshold excluded from fulfillment. All personnel must hold appropriate security clearances, with full personnel listings—including SSN, citizenship, and clearance status—due seven days prior to work commencement. Work must comply with NAVSHIPS 9890/5 and 9890/8, NACE, NBPI, and other technical standards, while packaging and marking follow MIL-STD-129 and MIL-STD-130 guidelines for unique item identification and barcoding using UID. Invoicing is mandatorily conducted via Wide Area WorkFlow, and all submissions must be electronic, in editable formats, virus-free, and self-contained. The contract also requires mandatory flow-down of OCI clauses to subcontractors and strict adherence to government security policies, environmental controls, and hazardous material handling procedures. The NAICS code is 336
Ship Building and Repairing

POSTED

8 days ago

DEADLINE

in 10 days
View Details