Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Reservoir 5A1 Rehabilitation Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The South Coast Water District is undertaking the Reservoir 5A1 Rehabilitation Project located in Dana Point, California. The project focuses on the rehabilitation of a potable water storage tank and involves recoating the tank, implementing interior and exterior piping modifications, and performing minor site work. These activities are designed to improve existing infrastructure without expanding the facility beyond its current conditions. The project is classified as a forecast and is managed by Senior Civil Engineer Dylan LaFrance. According to the Final CE Memorandum and the Notice of Exemption, the project qualifies for a Class 1 Categorical Exemption under the California Environmental Quality Act. This exemption is granted because the work consists of minor alterations to existing utility facilities, ensuring that the rehabilitation process does not require a full environmental review.

General Info

South Coast Water District will rehabilitate Reservoir 5A1 in Dana Point, California.

Agency

California → South Coast Water District

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

St Kitts, Dana Point, CA, 92629

Set-Aside

NONE

Documents

(2)

Reservoir 5A1 Rehabilitation Notice of Exemption

PDFspecial-notice

Reservoir 5A1 Rehabilitation Final CE Memorandum

PDFdetermination-and-findings

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → South Coast Water District
Contacts1 person available
OfficeN/A
Organization / Agency
California → South Coast Water District
Office AddressN/A
Contacts
Dylan LaFranceSenior Civil Engineer

Full Description

Show more
The South Coast Water District is proposing the Reservoir 5A1 Rehabilitation Project, which consists of various modifications and improvements to rehabilitate a potable water storage tank (Reservoir 5A1) in the City of Dana Point. Project activities would include recoating the tank, completion of interior and exterior piping modifications on the tank, and minor site work around the tank.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, involves the installation of extensive water infrastructure for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project requires the installation of both contractor-furnished and Metropolitan-furnished valves, including 54-inch and 132-inch diameter valves and tie-ins ranging from 54 to 145.5 inches. Additional structural requirements include the construction of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The technical scope further encompasses electrical upgrades, instrumentation and controls, piping systems, and specialized civil works such as the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This solicitation, issued by James W. Fowler Co., is open to small businesses, including SBA-certified service-disabled veteran-owned small businesses, minority business enterprises, and women business enterprises. Bids and subcontractor pricing must be submitted by September 29, 2026, with all negotiations finalized 24 hours prior to the bid opening. The project encourages the use of apprentices and provides specific support for M/W/DBE subcontractors regarding bonding, insurance, and material procurement.
James W. Fowler Co.

POSTED

about 12 hours ago

DEADLINE

in 10 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS