Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on September 9, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Reservoir Diving Inspections

Closed
20260909001State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and significant upgrades to the Morgans Branch Pumping Station in North Carolina. The scope of work includes the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The project is estimated at 16,690,000 dollars and is designed by Willis Engineers, who will serve as the owner's representative for the City of Belmont. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on qualifications, financial ability, and the experience of proposed subcontractors. Bidders must comply with specific socioeconomic requirements, including the submission of MWBE Good Faith Efforts documentation, and the winning contractor is required to self-perform at least 50 percent of the total original contract amount. Key contractual obligations include providing performance and payment bonds, maintaining insurance with an A.M. Best rating of A-VII or better, and adhering to strict technical standards such as AWS and ASME welding qualifications and OSHA fall protection. Payment will be processed in equal monthly amounts using the EJCDC C-620 application for payment.
Don Moorhead Construction, Inc.

POSTED

about 5 hours ago

DEADLINE

in 3 days
NAICS: 237110
New
Alvarado Trunk Sewer Ph IV and Water Main Relocations Bid Package A, Contract K-27-2470-DBB-3-C
Solicitation # K-27-2470-DBB-3-C
Flatiron Dragados Constructors, Inc. is soliciting bids for the Alvarado Trunk Sewer Ph IV and Water Main Relocations Bid Package A, Project No. K-27-2470-DBB-3-C, for the City of San Diego. This CASRF and EPA funded project involves various construction and supply scopes, including paving, electrical work, aggregate supply, and pipe supply. The solicitation is set aside for SBA certified Women-Owned Small Businesses and encourages Disadvantaged Business Enterprise participation. Bids must be submitted via email or fax by the deadline, with conflicting dates listed as October 28, 2026, and December 3, 2026. All submitted quotes must remain valid for 120 days from the bid due date. Qualified subcontractors and suppliers must possess a valid California contractor license and be registered with the California Department of Industrial Relations in accordance with Public Contract Code Section I725.5. The project is subject to a Project Labor Agreement and requires compliance with specific insurance requirements. Flatiron Dragados reserves the right to require payment and performance bonds equal to 100 percent of the contract value, with actual bond premium costs reimbursable up to 3 percent. All bonds must be issued by a surety authorized to operate within the State of California.
Flatiron Dragados Constructors, Inc.

POSTED

about 5 hours ago

DEADLINE

in 26 days

AI Contract Overview

Show more

The Mission Springs Water District in California has issued solicitation number 20260909001 for reservoir diving inspections, cleaning, and repair services. This project involves the maintenance of 24 potable water storage reservoirs located in Desert Hot Springs, California. The agency is seeking qualified and licensed contractors who possess specific diver certifications and relevant experience to perform these specialized tasks. Interested parties must submit their responses by the deadline of October 6, 2026. The contract requirements include adherence to prevailing wages, specific insurance mandates, and detailed submission guidelines as outlined in the invitation to bid. The procurement process is categorized under NAICS code 237110 and is managed by the Mission Springs Water District.

General Info

Mission Springs Water District seeks divers for reservoir inspection and repair by October 6, 2026.

Place of Performance

Desert Hot Springs, CA, 92240, USA

Set-Aside

NONE

Documents

1
PDF, High priority: read this firstitb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Mission Springs Water District
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
$18

More opportunities from California → Mission Springs Water District

Same awarding agency

NAICS: 237310
SLED
Mission Springs Water District Street Improvements for the Regional Wastewater Reclamation Facility Project
Solicitation # TKE-093
The Mission Springs Water District is overseeing the construction of 1.08 miles of paved roadway to replace existing compacted dirt roads along 19th Avenue, 20th Avenue, and Little Morongo Road in Desert Hot Springs, California. This project is designed to support the development of the Nancy Wright Regional Wastewater Reclamation Facility by improving the local roadway network, reducing fugitive dust, and enhancing access for future development. The scope of work includes road clearing, subgrade construction, curb and gutter installation, and the final application of asphalt pavement. Construction is scheduled to take place from June 2025 through October 2025. As the lead agency, the Mission Springs Water District has ensured compliance with the California Environmental Quality Act through a Mitigated Negative Declaration, certifying that the project will not have significant environmental impacts provided specific mitigation measures are followed. Technical assessments have been completed regarding air quality, greenhouse gas emissions, soil characteristics, and cultural resources. Biological resource reports emphasize the need for protection of nesting birds and burrowing owls in accordance with the Coachella Valley Multiple Species Habitat Conservation Plan. Project administration is managed by Engineering Manager Eric Weck, and the project requires strict adherence to onsite inspection protocols if cultural or paleontological resources are encountered during grading.
Highway, Street, and Bridge Construction

POSTED

12 months ago

DEADLINE

N/A
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS