Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Resolution No. 2026-071, Approval for the Erection and Maintenance of a gate along Leon Road at its intersection with the former alignment of Briggs Road.

Forecast
B204723D, 2055State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Resolution No. 2026-071 authorizes the Riverside County Transportation Department, Survey Division, to oversee the erection and maintenance of a gate located along Leon Road at its intersection with the former alignment of Briggs Road in the French Valley area of California. Identified by project number B204723D, 2055, the project is classified under NAICS code 237310. David L. McMillan, the Riverside County Surveyor, serves as the primary point of contact for the initiative. The project has been granted a Notice of Exemption under the California Environmental Quality Act, as it is determined that the work will not require construction activities that change the use or intensity of the site, nor will it create significant direct or indirect physical environmental impacts. Administrative details include an accounting string of 537280-20000-3130500000 and authorization number W.O. zB204723D z2055, with Hang Tran designated as the accounting contact. The County Clerk and Recorder is authorized to process a 50.00 dollar CEQA environmental document filing fee.

General Info

Riverside County authorizes gate installation and maintenance at Leon and Briggs Roads.

Agency

California → Riverside County

Place of Performance

Leon Road and Briggs Road, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Riverside County
Contacts1 person available
OfficeN/A
Organization / Agency
California → Riverside County
Office AddressN/A
Contacts
David L. McMillanRiverside County Surveyor

Full Description

Show more
Resolution No. 2026-071, Approval for the Erection and Maintenance of a gate along Leon Road at its intersection with the former alignment of Briggs Road. Project Number: B204723D, 2055

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an infrastructure initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground utilities such as tunneling, boring, jacking, and micro tunneling, as well as site work involving land surveying, subsurface investigation, shoring, and site clearing. Additional requirements encompass surface improvements like asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with environmental support services including SWPPP and quality control. Kiewit is specifically seeking qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Furthermore, Kiewit prioritizes bidders who can demonstrate an ability to maintain labor harmony on the project. Interested firms must contact Lead Estimator Ken Johnston to receive an Invitation to Bid through the Building Connected electronic system. The deadline for bid submissions is November 18, 2025, at 2:00 p.m.
Kiewit Infrastructure West Co.

POSTED

about 2 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237310
New
SLED
RFB-PARKS-MISSISSIPPI RIVER BLVD RETAINING WALLS REBID
Solicitation # 1777
The City of Saint Paul Parks Department is soliciting bids for the Mississippi River Blvd Trail Improvement Project, which involves the removal and reconstruction of retaining walls, trails, and fencing near Princeton Avenue. The scope of work includes the removal of existing Loffelstein walls and bituminous walks, the installation of soldier pile walls with galvanized steel bridge plank lagging, and the paving of a new bituminous trail. The base bid must include an ADA trail transition to connect to the existing trail. Key deliverables include site protection, erosion control, and the installation of concrete pile caps and structural backfill. The contract will be awarded to the lowest responsible base bidder based on an evaluation of their experience, financial resources, and technical capabilities. Bidders must submit their responses via the City of Saint Paul Supplier Portal by December 9, 2026, using the required Excel bid form. Mandatory compliance requirements include adhering to the City of Saint Paul Little Davis-Bacon prevailing wage standards and Affirmative Action/Equal Employment Opportunity specifications. Upon award, the successful contractor must provide performance and payment bonds, certificates of insurance, and human rights compliance documentation. The work is subject to a one-year guarantee from the date of substantial completion.
City of Saint Paul

POSTED

about 10 hours ago

DEADLINE

in 28 days
View Details
NAICS: 237310
New
SLED
RFB-PW-SAINT ANTHONY MILL&VERLAY 2026
Solicitation # 1785
The City of Saint Paul Parks Department is soliciting bids for the 2026 Saint Anthony Mill and Overlay project, located along Saint Anthony Avenue and Rondo Avenue between Snelling Avenue and Marion Street. The scope of work focuses on pavement resurfacing via a standard 2-inch mill and overlay, as well as significant pedestrian and safety enhancements. Key deliverables include the construction of curb extensions, ADA-compliant pedestrian ramps, concrete curb replacement, storm sewer installation, and the paving of off-street bike paths. All work must adhere to the City of Saint Paul Department of Public Works governing specifications and the 2026 MnDOT Schedule of Materials Control. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit all documentation through the City of Saint Paul Supplier Portal by December 7, 2026, at 2:00 PM CST. Required financial protections include a performance bond and a payment bond, each equal to 100% of the contract amount, and general liability insurance with a $1,500,000 per occurrence limit. The project is subject to the Little Davis-Bacon Ordinance regarding prevailing wages and includes a Vendor Outreach Program to encourage the participation of local small, woman-owned, and minority-owned businesses. Contractors must also provide a signed statement under oath verifying compliance with minimum criteria per Minnesota Statutes.
City of Saint Paul

POSTED

about 10 hours ago

DEADLINE

in 26 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS