Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Restoration and Backfilling

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract pertains to the restoration and backfilling of roadways and sidewalks following the installation of sewer pipes in Capitola, California, with the goal of minimizing long-term disruption to public infrastructure and pedestrian access. Work includes proper backfilling procedures, compaction of soil layers to prevent settling, and surface restoration to match existing conditions, ensuring structural integrity and aesthetic continuity of paved areas and walkways. All activities must adhere to industry standards for subsurface work and surface rehabilitation to maintain public safety and traffic flow. This subcontract is managed by the Santa Cruz County Sanitation District under NAICS code 237310, which classifies it as utility system construction, and is expected to be performed entirely within the 95010 ZIP code area. The contract was posted on July 13, 2026, with no specified solicitation number or set-aside designation, indicating it is a direct award or follow-on effort within a broader infrastructure project. Performance is localized to Capitola, with no other geographic or jurisdictional parameters outlined.

General Info

Restoration and backfilling of roadways and sidewalks after sewer installation in Capitola, California, under Santa Cruz County Sanitation District.

Agency

California → Santa Cruz County Sanitation District

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Capitola, CA, 95010

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Santa Cruz County Sanitation District
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → Santa Cruz County Sanitation District
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Backfilling, compaction, and surface restoration of roadways and sidewalks after sewer pipe installation to minimize long-term disruption.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
Federal
Gallinas Canyon Road Reconstruction
Solicitation # AP-Gallinas-MR
The USDA Forest Service is conducting market research for the Gallinas Canyon Road Reconstruction Phase II project within the Santa Fe National Forest in New Mexico, targeting qualified firms capable of delivering a complex, multi-disciplinary transportation infrastructure effort following the catastrophic 2022 Hermits Peak and Calf Canyon Fire. The road, designated NFSR 263, serves as a critical access route and crosses Gallinas Creek—the primary drinking water source for Las Vegas, New Mexico—and has suffered severe damage from post-fire flooding, necessitating extensive reconstruction including the replacement of 14 bridges and five major retaining-wall complexes in a narrow, mountainous, and environmentally sensitive canyon. The anticipated construction value exceeds $10 million, and the Government is seeking industry input on capability to deliver an integrated approach spanning design development from 30 percent through final design, procurement preparation, construction, and full construction administration under an accelerated timeline targeting a procurement-ready package by September 2027 and construction completion by 2030. Respondents are required to demonstrate extensive experience in large-scale roadway and bridge reconstruction within post-disaster, high-elevation terrains, with specific emphasis on geotechnical and hydraulic expertise, including advanced 2D hydrologic modeling for post-wildfire sediment and flood dynamics. The request seeks detailed information on organizational capacity to mobilize concurrent staffing across engineering disciplines, specialized mountain drilling and lab testing capabilities, construction inspection and materials testing, environmental compliance, and stakeholder coordination across federal, state, and local entities. Companies must indicate their ability to meet the tight schedule, outline potential constraints related to workforce, supply chain, permitting, or environmental mitigation, and specify their preferred contracting approach—whether as prime, joint venture, or subcontractor. Small businesses are encouraged to detail direct performance capabilities and potential teaming arrangements. Responses must be submitted by August 14, 2026, and will inform the Government’s acquisition strategy without constituting a solicitation or binding obligation.
Region 3 Southwestern Regional Office

POSTED

1 day ago

DEADLINE

in 4 days
View Details