AP-Gallinas-MRFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The USDA Forest Service is conducting market research for the Gallinas Canyon Road Reconstruction Phase II project within the Santa Fe National Forest in New Mexico, targeting qualified firms capable of delivering a complex, multi-disciplinary transportation infrastructure effort following the catastrophic 2022 Hermits Peak and Calf Canyon Fire. The road, designated NFSR 263, serves as a critical access route and crosses Gallinas Creek—the primary drinking water source for Las Vegas, New Mexico—and has suffered severe damage from post-fire flooding, necessitating extensive reconstruction including the replacement of 14 bridges and five major retaining-wall complexes in a narrow, mountainous, and environmentally sensitive canyon. The anticipated construction value exceeds $10 million, and the Government is seeking industry input on capability to deliver an integrated approach spanning design development from 30 percent through final design, procurement preparation, construction, and full construction administration under an accelerated timeline targeting a procurement-ready package by September 2027 and construction completion by 2030. Respondents are required to demonstrate extensive experience in large-scale roadway and bridge reconstruction within post-disaster, high-elevation terrains, with specific emphasis on geotechnical and hydraulic expertise, including advanced 2D hydrologic modeling for post-wildfire sediment and flood dynamics. The request seeks detailed information on organizational capacity to mobilize concurrent staffing across engineering disciplines, specialized mountain drilling and lab testing capabilities, construction inspection and materials testing, environmental compliance, and stakeholder coordination across federal, state, and local entities. Companies must indicate their ability to meet the tight schedule, outline potential constraints related to workforce, supply chain, permitting, or environmental mitigation, and specify their preferred contracting approach—whether as prime, joint venture, or subcontractor. Small businesses are encouraged to detail direct performance capabilities and potential teaming arrangements. Responses must be submitted by August 14, 2026, and will inform the Government’s acquisition strategy without constituting a solicitation or binding obligation.

General Info

USDA seeks qualified firms for $10M+ post-fire road and bridge reconstruction in Santa Fe National Forest, due 2030.

Agency

Department Of Agriculture → Region 3 Southwestern Regional OfficeView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

65900, NM, 87504, USA

Set-Aside

NONE

Documents

(1)

Gallinas_Canyon_Sources_Sought_and_Capability_Statement_Form.docx

DOCX

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseSources Sought
Posted

Sources Sought

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Region 3 Southwestern Regional Office
Contacts1 person available
OfficeALBUQUERQUE, NM, 87102, USA
Organization / Agency
Department Of Agriculture → Region 3 Southwestern Regional Office
View Agency Profile
Office AddressALBUQUERQUE, NM, 87102, USA

Full Description

Show more

Gallinas Canyon Road Reconstruction - Phase II
Santa Fe National Forest, New Mexico


Response Period: August 9, 2026 through August 14, 2026


1. Purpose


The USDA Forest Service is conducting market research to identify qualified sources capable of supporting the Gallinas Canyon Road Reconstruction Phase II project. This Sources Sought Notice is issued for planning and market research purposes only and is not a solicitation, Request for Proposal, Request for Quotation, or commitment by the Government to award a contract.


Responses will assist the Government in evaluating industry capability, availability, business size representation, potential acquisition approaches, and the ability of industry to satisfy the Government's technical and schedule requirements.


2. Project Background


The 2022 Hermits Peak and Calf Canyon Fire burned more than 115,000 acres in New Mexico. Subsequent flooding severely damaged Gallinas Canyon Road (NFSR 263), which crosses Gallinas Creek, the primary drinking-water source for Las Vegas, New Mexico.


The project is intended to restore access, improve safety, protect Gallinas Creek from erosion and sediment, and improve infrastructure resilience against future disasters. The project includes major roadway reconstruction/realignment and replacement of 14 bridges within a highly constrained mountain canyon environment.


3. Project Magnitude


In accordance with FAR 36.204, the anticipated magnitude of construction for this project is:


MORE THAN $10,000,000


This magnitude is provided for market research and acquisition planning purposes and is not a Government estimate or representation of the amount that may ultimately be solicited or awarded.


4. Anticipated Requirement


The Government is assessing industry capability to provide an integrated approach capable of advancing the project from approximately 30 percent design through final design, procurement preparation, construction, and construction administration.


  • Roadway design and engineering
  • Structural and bridge engineering
  • Geotechnical engineering and investigations
  • Hydraulic engineering and post-wildfire 2D hydrologic modeling
  • Surveying
  • Construction engineering
  • Engineering project management
  • NEPA and environmental support
  • Heritage/archeological, wildlife, fisheries, watershed, and related resource expertise
  • Public engagement and stakeholder coordination
  • Construction inspection and quality assurance
  • Materials testing
  • Construction contract administration and field support
  • Coordination among Federal, state, local, and private stakeholders

The requirement also includes specialized mountain-terrain drilling capability, laboratory testing capacity, investigations supporting up to 14 bridge replacements and five major retaining-wall complexes, and the ability to manage construction activities in a confined post-fire canyon environment.


5. Schedule Considerations


The Government is particularly interested in determining whether industry has the capacity and resources necessary to support the accelerated project schedule. The current program requirement calls for a procurement-ready package to be completed and advertised for public bid by September 2027, with construction targeted for completion by 2030.


6. Requested Industry Information


1. Company Information: Company name, address, UEI, CAGE Code, point of contact, telephone number, email address, business size, and applicable socioeconomic status.


2. Relevant Experience: Identify up to three projects of similar size, scope, and complexity involving major roadway reconstruction, bridge replacement, mountain terrain, post-disaster reconstruction, or comparable transportation infrastructure.


3. Integrated Capability: Describe your organization's ability to provide or manage the engineering, environmental, design, construction, and construction-administration disciplines necessary for an effort of this complexity.


4. Schedule: State whether your organization could support completion of a procurement-ready package by September 2027 and construction completion by 2030. Identify major schedule risks or constraints.


5. Staffing: Describe your ability to provide roadway, bridge/structural, geotechnical, hydraulic, construction engineering, surveying, environmental, and project-management personnel concurrently.


6. Geotechnical Capability: Describe your ability to provide or obtain specialized mountain-terrain drilling equipment and laboratory testing necessary to support multiple bridge and retaining-wall investigations concurrently.


7. Hydraulic/Hydrologic Capability: Describe experience performing advanced 2D hydraulic or post-wildfire watershed modeling involving flooding, sediment transport, or comparable conditions.


8. Construction Administration: Describe your ability to provide construction contract administration, quality assurance, inspection, materials testing, and field support through project completion.


9. Contracting Approach: Indicate whether your company would generally pursue an effort of this magnitude as a prime contractor, joint venture, mentor-protege arrangement, teaming arrangement, or subcontractor.


10. Small Business Participation: If your company is a small business, identify which portions of the anticipated requirement your company could perform directly and any portions for which teaming or subcontracting would likely be necessary.


11. Industry Capacity: Identify any portions of this requirement that industry would recommend separating or combining to improve competition, schedule, cost control, or technical performance.


12. Acquisition Recommendations: Identify any acquisition strategy, contract structure, packaging, phasing, or other approach the Government should consider when planning this requirement.


13. Constraints/Risks: Identify significant technical, supply-chain, workforce, permitting, environmental, equipment, material, or schedule constraints the Government should consider.


14. Additional Information: Provide any other information that would assist the Government in determining the availability and capability of commercial sources to satisfy this requirement.


7. Response Instructions


Responses should be submitted electronically no later than August 14, 2026, to the Contracting Officer at the email address identified in the SAM.gov notice. Responses should be approximately 10 pages or less, excluding relevant project sheets or supporting information. Firms should clearly identify proprietary information contained in their responses.


Respondents may use the attached Capability Statement / Sources Sought Response Form. Use of the form is encouraged to promote consistent market-research responses but is not mandatory.


8. Disclaimer


This notice is issued solely for market-research and acquisition-planning purposes. It does not constitute a solicitation or commitment by the Government to issue a solicitation or make an award. The Government will not reimburse respondents for costs associated with preparing or submitting information in response to this notice. Responses are voluntary and will be used to assist the Government in determining the appropriate acquisition strategy.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
2026-050 Pavement Repair IDIQ IFB
Solicitation # 2026-050
The City of San Marcos is soliciting sealed bids for an Indefinite Delivery Indefinite Quantity (IDIQ) contract to perform pavement repair, rehabilitation, and reconstruction services across city streets and related roadway infrastructure, including asphalt and concrete pavements, sidewalks, and pavement markings. The scope of work encompasses milling, base repair, hot mixed asphalt concrete application, cold patch repairs, concrete flatwork, and associated maintenance activities, all to be executed under multiple work orders aligned with contract plans and specifications. The annual estimated construction volume is $1,000,000, and bidders must submit a bid bond, cashier’s check, or certified check equal to five percent of that amount. The solicitation, identified as IFB# 2026-050, is governed under NAICS code 237310 and is managed by the City’s Purchasing & Contracting Division. Bids must be physically delivered in sealed envelope form to the Office of the Purchasing Manager at 630 E. Hopkins St., San Marcos, TX, no later than September 10, 2026, at 2:00 p.m. local time, with a public bid opening conducted via video conference. A non-mandatory pre-bid video conference is scheduled for August 18, 2026. Tentative award is planned for October 20, 2026, during the City Council meeting. All technical requirements, plans, and specifications are available for download through the City’s e-procurement portal, and work will be performed exclusively within San Marcos, Texas. No electronic submission is permitted, and no clause, representation, certification, or socioeconomic requirement beyond the bid bond is indicated in the available documentation.
CITY OF SAN MARCOS

POSTED

1 day ago

DEADLINE

in about 1 month
View Details

More opportunities from Department Of Agriculture → Region 3 Southwestern Regional Office

Same awarding agency