Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Texas was posted on July 9, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

RFB 2026-023, SPEEGLEVILLE BRIDGE OVER MIDDLE BOSQUE REPLACEMENT

Closed
RFB2026-023State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an Invitation for Bid (IFB No. 8003R1) for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground utilities such as tunneling, boring, jacking, and cathodic protection; site work involving land surveying, clearing, shoring, and subsurface investigation; and surface improvements including asphalt paving, landscaping, and the installation of traffic signals and lighting. Additionally, the project requires the supply of various materials such as ready mix, precast concrete, and valves, as well as the implementation of storm water pollution prevention (SWPPP). This opportunity is set aside for Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, for which Kiewit will reimburse the premiums. Kiewit also emphasizes the importance of labor harmony and notes its status as a signatory to several collective bargaining agreements. Interested firms must submit their bids by November 18, 2025, via the Building Connected electronic system.
Kiewit Infrastructure West Co.

POSTED

about 4 hours ago

DEADLINE

in 23 days
NAICS: 237310
New
SLED
ENG HSIP Cycle 12 Butterfield Rd Pedestrian Crossing and 2025 Countywide Drainage Project
Solicitation # 2025-24/2025-28
The HSIP Cycle 12 Butterfield Rd Pedestrian Crossing and 2025 Countywide Drainage Project (Project No. 2025-24/2025-28) is a public works solicitation issued by the County of Marin Department of Public Works. Located at the intersection of Irving Drive and Butterfield Road in unincorporated San Anselmo, California, the project scope includes the installation of two crosswalks, ADA-compliant concrete landings, Rectangular Rapid Flashing Beacons (RRFBs), and two bioretention basins. Additional work consists of minor grind and pave operations, traffic striping, and pavement markings. The engineer's estimate for the project is $550,000, with a required completion timeline of 35 working days. Bids must be submitted electronically via BidExpress by October 27, 2026. To be eligible, bidders must possess a valid Class A license and be registered with the Department of Industrial Relations (DIR) to perform public work. Submission requirements include a bid security of 10% of the base bid, a bidder's qualification statement, and various certifications, including compliance with CARB Off-Road Diesel-Fueled Fleets Regulations and federal debarment and suspension certifications. The contract award will be based on budget requirements and granted to the responsible and responsive bidder with the lowest total base bid. The project is governed by the 2025 Caltrans Standard Specifications (Divisions II through XII), the 2024 Green Book, and 2018 Marin Uniform Construction Standards. Contractors are required to provide a baseline schedule within 15 days of contract execution and maintain a comprehensive Quality Control program. Payment is processed monthly via payment requests submitted to the Engineer, with change order bills submitted through the Department's internet billing system. The contract also mandates strict adherence to prevailing wage rates per Labor Code Sec. 1720 et seq. and full compliance with ADA and Section 504 accessibility standards.
County of Marin

POSTED

2 days ago

DEADLINE

in 1 day
NAICS: 237310
New
SLED
RFB - REPAIR, REPLACEMENT, AND CONSTRUCTION OF SELECTED CONCRETE SIDEWALKS, CURBS, AND GUTTERS (FY24-25)
Solicitation # BPM013439
The County of San Diego Department of Public Works is soliciting bids for the repair, replacement, and construction of selected concrete sidewalks, curbs, and gutters for the FY24-25 period. The scope of work includes the installation of sidewalks, curb and gutter, cross gutters, driveways, and curb ramps, with specific project areas including Old Hwy 80 and Agua Dulce. All work must adhere to the 2015 Caltrans Standard Specifications and San Diego County Design Standards, specifically DS-21L for detectable warning surfaces. The contract requires strict compliance with the Americans with Disabilities Act of 1990, Buy America requirements, and state prevailing wage rates under Labor Code Section 1720. Proposals will be evaluated based on the total sum of all contract bid items, and the owner reserves the right to reject obviously unbalanced bids. Bidders must provide a bid security of ten percent of the bid amount via cash, certified check, or bidder's bond, while the successful awardee must furnish performance and payment bonds for one hundred percent of the contract value. Submission requires a complete original bid, including representations and certifications, a Small-Local Business Utilization Plan, and a noncollusion affidavit. The deadline for submission via the BuyNet portal or sealed envelope is December 03, 2026, at 2:00 PM local time. The contractor is required to appoint a quality control manager and must notify the Engineer of any noncompliance within 24 hours. Project management milestones include a preconstruction conference within 15 days of contract approval and the submission of a final as-built schedule within 30 days of completion. The solicitation emphasizes nondiscrimination and affirmative action, incorporating various federal regulations and executive orders, and provides specific preferences and certification paths for small, local, and disabled veteran business enterprises.
San Diego County

POSTED

2 days ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The City of Waco is soliciting sealed bids for the replacement of the Speegleville Bridge over the Middle Bosque River, identified as RFB2026-023, with bids due by 2:00 P.M. on Wednesday, July 29, 2026, at the Operations Center located at 1415 N. 4th Street in Waco, Texas. This 0.54-mile project, a joint effort between the City of Waco and TxDOT, involves reconstructing approximately 2,200 linear feet of Speegleville Road from Maple Shade Road to north of Oak Road, transforming the current alignment into a four-lane roadway with separated northbound and southbound lanes connected by a striped median. Two new bridges, each 670 feet long, will be constructed to cross the Middle Bosque River, alongside the installation of about 1,500 linear feet of storm drainpipes and culverts, and new pedestrian sidewalks on both the eastern and western sides of the roadway to improve safety and accessibility for non-motorized users. A non-mandatory pre-bid meeting will be held via Zoom on July 1, 2026, at 10:00 A.M., offering bidders an opportunity to review project details and ask questions. All inquiries should be directed to Purchasing Agent Paul Campos at pcampos@wacotx.gov or 254-750-8062, with additional support available from Purchasing Manager Kasey Gamblin and Senior Purchasing Agent Daryle Bullard. Further project information can be accessed through the official portal at https://waco-texas.bonfirehub.com/portal.

General Info

Waco and TxDOT to reconstruct Speegleville Bridge and road into four-lane roadway with new bridges, sidewalks, and drainage by July 2026.

Agency

Texas → CITY OF WACO

Place of Performance

TX, USA

Set-Aside

NONE

Documents

6

RFB 2026-023 Addendum 1 for Speegleville Bridge Replacement

PDF, High priority: read this firstamendment
High

RFB 2026-023 Plans Specifications

PDF, High priority: read this firstrfb
High

RFB 2026-023 Speegleville Bridge Over Middle Bosque Replacement

PDF, High priority: read this firstrfb
High

RFB 2026-023 Speegleville Bridge Over Middle Bosque Replacement

PDF, High priority: read this firstrfb
High

RFB 2026-023 Pre-Bid Meeting Attendance

PDF, Low prioritypre-bid-meeting-attendance
Low

RFB 2026-023 Zoom Bid Package Access Instructions

PDF, Low priorityspecial-notice
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTexas → CITY OF WACO
Contacts3 people available
OfficeWACO, TX, 76702, USA
Organization / Agency
Texas → CITY OF WACO
Office AddressWACO, TX, 76702, USA
Contacts
KASEY GAMBLINPURCHASING MANAGER
Daryle BullardSenior Purchasing Agent

Full Description

Show more
RFB2026-023, Speegleville Bridge Over the Middle Bosque Replacement. Sealed Bids will be accepted at the City of Waco’sOperations Center, 1415 N. 4th Street, Waco, TX until 2:00 P.M., Wednesday July29, 2026. The dual effort of the City of Waco and TxDOT for the SpeeglevilleBridge Over the Middle Bosque Project is a 0.54-mile bridge and roadwayreconstruction project of Speegleville Road from Maple Shade Road to north ofOak Road located in the City of Waco, McLennan County, Texas. The projectconsists of reconstructing approximately 2,200 LF of roadway and adding anadditional northbound and southbound lanes, creating a four-lane roadwayseparated by a striped median. The bridge crossing consists of constructing twodifferent bridges elevated over the Middle Bosque River, each 670 feet inlength. In addition to roadway improvements, construction of approximately1,500 LF of storm drainpipes and culverts, and construction of pedestriansidewalks on the east and west sides of the roadway. For more detailedinformation, see this project page at https://waco-texas.bonfirehub.com/portal. A Non-mandatory Pre-Bid meeting is scheduled for WednesdayJuly 1, 2026, at 10:00 A. M. via Zoom Video and Dial In. For questions, pleasecontact purchasing agent Paul Campos at pcampos@wacotx.gov or by phone at254-750-8062.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS